Pages that link to "RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16"
Jump to navigation
Jump to search
The following pages link to RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16:
Displayed 2 items.
- ML20055F930 (redirect page) (← links)
- ML18041A120 (← links)
- ML17333A022 (← links)
- ML17279A189 (← links)
- ML19210E598 (← links)
- ML19210D939 (← links)
- ML19208B561 (← links)
- ML19225C259 (← links)
- ML19211A929 (← links)
- ML19250B722 (← links)
- ML19250A649 (← links)
- ML19250A596 (← links)
- ML19249B162 (← links)
- ML19259C744 (← links)
- ML19257C797 (← links)
- ML19257A843 (← links)
- ML19257A173 (← links)
- ML19256F038 (← links)
- ML19256E217 (← links)
- ML19256B600 (← links)
- ML19253C594 (← links)
- ML19253A552 (← links)
- ML19242B787 (← links)
- ML19242A981 (← links)
- ML19242A513 (← links)
- ML19282B537 (← links)
- ML19274E703 (← links)
- ML19273B367 (← links)
- ML19270G523 (← links)
- ML19269B153 (← links)
- ML19262C623 (← links)
- ML19262C412 (← links)
- ML19262A606 (← links)
- ML19260D627 (← links)
- ML19260D622 (← links)
- ML19260D621 (← links)
- ML19260D618 (← links)
- ML19296C910 (← links)
- ML19296B996 (← links)
- ML19296B028 (← links)
- ML19294B279 (← links)
- ML19294A739 (← links)
- ML19290E990 (← links)
- ML19290D656 (← links)
- ML19284A813 (← links)
- ML19284A811 (← links)
- ML19283B712 (← links)
- ML19309H854 (← links)
- ML19309F139 (← links)
- ML19309B393 (← links)
- ML19309A707 (← links)
- ML19309A699 (← links)
- ML19309A696 (← links)
- ML19305E708 (← links)
- ML19305E680 (← links)
- ML19305E652 (← links)
- ML19305E588 (← links)
- ML19305A251 (← links)
- ML19305A250 (← links)
- ML19325F212 (← links)
- ML19325E651 (← links)
- ML19325E595 (← links)
- ML19325E495 (← links)
- ML19325D874 (← links)
- ML19325D786 (← links)
- ML19324B779 (← links)
- ML19323G776 (← links)
- ML19323F302 (← links)
- ML19323F146 (← links)
- ML19323D321 (← links)
- ML19323D234 (← links)
- ML19323A400 (← links)
- ML19323A222 (← links)
- ML19322E955 (← links)
- ML19322E950 (← links)
- ML19322E944 (← links)
- ML19322E925 (← links)
- ML19321A203 (← links)
- ML19320D247 (← links)
- ML19312F001 (← links)
- ML19310A772 (← links)
- ML19351E978 (← links)
- ML19351E977 (← links)
- ML19351E924 (← links)
- ML19351D009 (← links)
- ML19351D004 (← links)
- ML19350E638 (← links)
- ML19350E635 (← links)
- ML19350E129 (← links)
- ML19350B664 (← links)
- ML19350B660 (← links)
- ML19347F953 (← links)
- ML19347E970 (← links)
- ML19347E867 (← links)
- ML19347E163 (← links)
- ML19347C379 (← links)
- ML19347A994 (← links)
- ML19347A727 (← links)
- ML19345H326 (← links)
- ML19345D638 (← links)
- ML19345C564 (← links)
- ML19345C036 (← links)
- ML19344B302 (← links)
- ML19343C850 (← links)
- ML19341D700 (← links)
- ML19341A682 (← links)
- ML19340D595 (← links)
- ML19338E289 (← links)
- ML19337A607 (← links)
- ML19336A664 (← links)
- ML19332G321 (← links)
- ML19332G181 (← links)
- ML19332F790 (← links)
- ML19332F345 (← links)
- ML19332D348 (← links)
- ML19332C993 (← links)
- ML19332C611 (← links)
- ML19332B904 (← links)
- ML19331E267 (← links)
- ML19331E232 (← links)
- ML19331E117 (← links)
- ML19331C744 (← links)
- ML19330C738 (← links)
- ML19330B453 (← links)
- ML19327B162 (← links)
- ML19327A978 (← links)
- ML19327A335 (← links)
- ML19327A332 (← links)
- ML20010G319 (← links)
- ML20010G308 (← links)
- ML20010G087 (← links)
- ML20010F480 (← links)
- ML20010C079 (← links)
- ML20009G507 (← links)
- ML20009F527 (← links)
- ML20009A038 (← links)
- ML20008F568 (← links)
- ML20006C006 (← links)
- ML20006B453 (← links)
- ML20006B438 (← links)
- ML20006A734 (← links)
- ML20006A356 (← links)
- ML20005G150 (← links)
- ML20005E449 (← links)
- ML20005D622 (← links)
- ML20005B953 (← links)
- ML20005A795 (← links)
- ML20005A508 (← links)
- ML20004E196 (← links)
- ML20004D069 (← links)
- ML20004B045 (← links)
- ML20004B009 (← links)
- ML20003H948 (← links)
- ML20003H729 (← links)
- ML20003E822 (← links)
- ML20003E821 (← links)
- ML20002D686 (← links)
- ML20002D685 (← links)
- ML20002C366 (← links)
- ML20002B739 (← links)
- ML20002B733 (← links)
- ML19353B127 (← links)
- ML19353B008 (← links)
- ML20024E574 (← links)
- ML20023C601 (← links)
- ML20012F157 (← links)
- ML20012F155 (← links)
- ML20012E113 (← links)
- ML20012E000 (← links)
- ML20012C993 (← links)
- ML20012C790 (← links)
- ML20012C788 (← links)
- ML20012C038 (← links)
- ML20012B300 (← links)
- ML20012A916 (← links)
- ML20012A443 (← links)
- ML20011F688 (← links)
- ML20011E843 (← links)
- ML20011E674 (← links)
- ML20011E153 (← links)
- ML20011D762 (← links)
- ML20028D484 (← links)
- ML20028C119 (← links)
- ML20038C607 (← links)
- ML20038A666 (← links)
- ML20038A664 (← links)
- ML20038A629 (← links)
- ML20054C332 (← links)
- ML20052E965 (← links)
- ML20052E853 (← links)
- ML20052C174 (← links)
- ML20052A863 (← links)
- ML20051N208 (← links)
- ML20050G989 (← links)
- ML20050D332 (← links)
- ML20050B567 (← links)
- ML20050B164 (← links)
- ML20049A567 (← links)
- ML20043G819 (← links)
- ML20043G221 (← links)
- ML20043F980 (← links)
- ML20043E653 (← links)
- ML20043D559 (← links)
- ML20043D542 (← links)
- ML20043D540 (← links)
- ML20043D237 (← links)
- ML20043C801 (← links)
- ML20043B423 (← links)
- ML20043B095 (← links)
- ML20043B089 (← links)
- ML20043B073 (← links)
- ML20043B069 (← links)
- ML20043A427 (← links)
- ML20042G703 (← links)
- ML20042G252 (← links)
- ML20042F974 (← links)
- ML20042E378 (← links)
- ML20042E350 (← links)
- ML20042D835 (← links)
- ML20042D704 (← links)
- ML20042D449 (← links)
- ML20042A903 (← links)
- ML20041F549 (← links)
- ML20041C529 (← links)
- ML20041C419 (← links)
- ML20041C177 (← links)
- ML20041A778 (← links)
- ML20040H448 (← links)
- ML20040G824 (← links)
- ML20039F465 (← links)
- ML20039D380 (← links)
- ML20039C705 (← links)
- ML20039C256 (← links)
- ML20039B211 (← links)
- ML20039A254 (← links)
- ML20039A162 (← links)
- ML20053C885 (← links)
- ML20053C806 (← links)
- ML20053C803 (← links)
- ML20087L195 (← links)
- ML20087K460 (← links)
- ML20087G480 (← links)
- ML20086A715 (← links)
- ML20083H252 (← links)
- ML20077M531 (← links)
- ML20077C330 (← links)
- ML20104A628 (← links)
- ML20100D625 (← links)
- ML20100B176 (← links)
- ML20096G862 (← links)
- ML20094H720 (← links)
- ML20094F498 (← links)
- ML20093M704 (← links)
- ML20092N941 (← links)
- ML20092L006 (← links)
- ML20092H765 (← links)
- ML20107B998 (← links)
- ML20115D935 (← links)
- ML20115C545 (← links)
- ML20072R028 (← links)
- ML20071E159 (← links)
- ML20137H276 (← links)
- ML20148Q444 (← links)
- 05000458/LER-1987-008, Advises That Addl Info Re Corrective Actions Noted in Rev 1 to LER 87-008 Wil Be Submitted by 880415 (← links)
- ML20147G415 (← links)
- ML20147G401 (← links)
- ML20147G332 (← links)
- ML20147E540 (← links)
- ML20147C074 (← links)
- ML20141D006 (← links)
- 05000458/LER-1985-006, Forwards LER 85-006-00 & LER 85-007-00 (← links)
- ML20128E619 (← links)
- ML20128E268 (← links)
- ML20128B490 (← links)
- ML20126C540 (← links)
- 05000458/LER-1985-062, Corrected Ltr Forwarding LER 85-062-00.Tracking Number Changed to RBG-23042 (← links)
- 05000458/LER-1985-061, Corrected Ltr Forwarding LER 85-061-00.Tracking Number Changed to RBG-23041 (← links)
- ML20195C237 (← links)
- ML20199E425 (← links)
- ML20205N950 (← links)
- ML20209D445 (← links)
- ML20207P882 (← links)
- 05000458/LER-1986-060, Forwards Info Re Items Identified Subsequent to 861110 Conference Re Insp Rept 50-458/86-36.Addl Info Available in LER 86-60,submitted on 861113 (← links)
- ML20214F505 (← links)
- ML20236B244 (← links)
- 05000458/LER-1987-014, Forwards LER 87-014,Rev 1,correcting Date of Occurrence from 870707 to 870704 (← links)
- ML20215N385 (← links)
- 05000458/LER-1985-059, Advises That Supplemental Info for LERs 85-039 & 85-024 Contained in LER 85-059,Rev 1 Submitted by Util (← links)
- RBG-30493, Requests Withdrawal of 860912 Amend Application to Transfer Fire Protection Program Requirements from License Based on Guidance Provided in Generic Ltr 86-10.Util Will Resubmit Request at Future Date (← links)
- RBG-31591, Responds to Violations Noted in Insp Rept 50-458/89-31. Corrective Actions:Leads Lifted to Isolate Trip Circuit Until Leads Properly Terminated on Replacement Transformer. Supplemental Response Will Be Provided by 900531 (← links)
- RBG-30470, Forwards Status Rept on Security Computer Program Upgrade. Rept Withheld (← links)
- RBG-30453, Discusses Progress of Procurement & Evaluation Activities for Sys Meeting Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec Currently on Hold.Util Preparing Amend Request to Extend License Condition to Future Date (← links)
- RBG-30445, Provides Util Interim Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Extension Until 890515 Requested to Provide Final Response to Bulletin (← links)
- RBG-31024, Responds to Violations Noted in Insp Rept 50-458/89-16.Util Utilized Guidance Provided in Various Documents That Components Subj to Seismic or Environ Qualification Can Be Purchased as Commercial Grade Components (← links)
- RBG-31314, Responds to Violations Noted in Insp Rept 50-458/89-24. Corrective Actions:Operations Personnel Secured Div II Standby Svc Water Sys to Isolate Leak & Reactor Protection Sys Power Supply Transferred to Alternate Power Supply (← links)
- RBG-31277, Forwards Roof Drawings for Standby Cooling Tower (Sbct) & Diesel Generator (DG) Bldgs & Calculations for DG & Sbct Bldgs,Per 890425 Request.Drawings Provide Overview of Each Bldg.W/Three Oversize Drawings (← links)
- RBG-30954, Forwards Addl Info Addressing Maint Priorities to Support 860829 & 890502 Requests for Amend Re Suppression Pool Pumpback Sys Operability (← links)
- RBG-31533, Forwards Response to Violations Noted in Insp Rept 50-458/89-30 on 890619-23.Response Withheld (Ref 10CFR73.21) (← links)
- RBG-30419, Forwards Listing of Levels of Nuclear Property Insurance Coverage for Facility by Policy Number & Limit (← links)
- RBG-30927, Forwards Rept Re Investigation Into Condition of Svc Water Sys at Facility & Plans for Further Activity.Sys Capable of Performing Required Functions (← links)
- RBG-30417, Forwards Rept P-741-1, Analyses of Components in Asco Solenoid Valve, Per W Paulson Request (← links)
- RBG-31523, Forwards Vols 1-4 to River Bend Station Inservice Insp Plan Summary Rept,Refuel Outage RF-2,First Period,First Interval (← links)
- RBG-31271, Clarifies 890714 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Addl Actions to Improve Instrument Air Sys Scheduled for Completion by 900401 (← links)
- RBG-30922, Provides Addl Info Re Use of Recirculation Sys Crack Growth Data for Feedwater Nozzle Weld Found in Feedwater Inlet Nozzle N4-A to Safe End Weld During Inservice Insp (← links)
- RBG-31261, Provides Response to NRC Generic Ltr 89-08, Erosion/ Corrosion Induced Pipe Wall Thinning. Plant Has Effective Erosion/Corrosion Monitoring Program W/Appropriate Proceduralized Administrative Controls (← links)
- RBG-31259, Requests Withdrawal of one-time Exceptions Proposed for Tech Specs 3.5.2,3.7.1.1, 3.7.1.2 & 3.9.11.1,per ,Due to Completion of Second Refueling Outage (← links)
- RBG-30889, Responds to Violations Noted in Insp Rept 50-458/89-12. Corrective Actions:Welding Procedure Spec W3-01 Revised to Correct Max Allowable Interpass Temp to 425 F & Latest Addenda Placed in ASME Code Books (← links)
- RBG-31258, Forwards Addl Justification for Proposed Deviation from Generic Ltr 87-09 Re Tech Spec 4.0.3,per W Paulson Request. Missed Surveillance within Time Allowed by Action Statement Considered Not Reportable,Per 10CFR50.73(a)(2)(i)(B) (← links)
- RBG-30879, Submits Interim Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers, Including Updated Traceability Evaluation for 30 Circuit Breakers (← links)
- RBG-30883, Forwards Proprietary, Evaluation of Indication in River Bend Feedwater Nozzle to Safe End Weld, Per Inservice Insp. Util Will Take Listed Actions.Evaluation of Radiographs from Const Inps Reviewed.Rept Withheld (Ref 10CFR2.790) (← links)
- RBG-30365, Provides Description of Inadequacy & Corrective Steps Taken to Improve & Strengthen Emergency Preparedness.Certified Individual Will Be Assigned to Control Room at Notification of Unusual Event Classification (← links)
- RBG-31247, Forwards Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Instrument Air Quality Consistent W/Mfg Recommendations for Components Served (← links)
- RBG-30880, Forwards Response to Request for Addl Info in Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Attachments a & B Provides Info on Inservice Insp Program (← links)
- RBG-29765, Forwards Draft River Bend Station 1989 Emergency Preparedness Evaluated Exercise. Util Requests That Encl Info Be Limited to Only Those NRC Evaluators Observing Exercise (← links)
- RBG-30800, Responds to Exercise Weaknesses Noted in Insp Rept 50-458/89-09 on 890301-03.Corrective Actions:Importance of Communication Reinforced Continually in Simulator & Critiqued W/Each Scenario Crew Subjected to (← links)
- RBG-31450, Forwards Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test (← links)
- RBG-30797, Forwards Revised App 13A to Rev 1 of Updated SAR Re Resumes of Key Plant Corporate Personnel.Updated App13A Inadvertently Omitted in 880825 Submittal of Rev 1 to Updated Sar.Revised App 13A Will Be Included in Rev 2 (← links)
- RBG-31440, Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1989 & Rev 3 to ODCM (← links)
- RBG-31424, Forwards Certified Cash Flow Statement for Cajun Electric Power Cooperative & Gulf States Utils Co & 1988 Annual Rept (← links)
- RBG-31428, Responds to Request for Addl Info Re Rev 3 of First 10-yr Interval Inservice Insp Program Plan (← links)
- RBG-31412, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/89-28.Corrective actions:SOP-0002 Valve Lineup Performed (← links)
- RBG-30778, Forwards Rev to 860829 Application for Amend to License NPF-47 Re Suppression Pool Pumpback Sys Operability (← links)
- RBG-31222, Responds to Violations Noted in Insp Rept 50-458/89-11 on 890315-0430.Corrective Actions:Retraining of Personnel, Revising of Tagging Procedure,Addl Classroom Training & Assigning Util Personnel to Oversee Contractor Clearances (← links)
- RBG-31388, Responds to 890724 Request Re Administration of Licensing Exams at Facility During Wk of 891016.Ref Matl Ref in Encl 1 of Ltr Transmitted to Dn Graves of Region IV (← links)
- RBG-31385, Forwards Status Rept of Upgrade to Security Computer Program by Adding Mux Loop Communications.Encl Withheld (← links)
- RBG-31384, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-18.Corrective Action:Control Room Bldg Chilled Water Pressure Differential Control Valves Modified as Described in Section C.1.a (← links)
- RBG-31186, Advises That Instruction of Personnel Associated W/ Surveillance Test Procedures Will Be Completed by 890731,in Response to Violation Noted in Insp Rept 50-458/88-18 (← links)
- RBG-31351, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-27.Corrective Actions:Administrative Procedure ADM-0002, Charter of Frc, Will Be Modified to Include Review of All Proposed Changes or Mods (← links)
- RBG-31139, Provides Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Nine Circuit Breakers Returned to GE & Found to Be of Original Mfg Condition & Not Refurbished (← links)
- RBG-31324, Forwards Updated Info Re Util Licensing Activities.Effect of Drywell Temp Increase on Suppression Pool Hydrodynamics Can Be Addressed by Evaluating Effects on Peak Drywell Pressure (← links)
- RBG-30578, Forwards Revs 2 & 3 to RSP-0008, Offsite Dose Calculation Manual. Rev 2 in Effect for Period of Semiannual Radioactive Effluent Release Rept Submitted on 890228.Rev 3 Currently in Use (← links)
- RBG-30557, Forwards Rept Re Status of Implementation of TMI Action Plan Items,Per NRC 890414 Request.All Action Plan Items Encl Have Been Implemented or Not Applicable to Facility (← links)
- RBG-30552, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/88-26.Corrective Actions Taken:Condition Repts Will Continue to Be Utilized & Mgt Will Ensure That Events Re Tech Spec 6.12.2 Reported Under 10CFR50.73 Requirements (← links)
- RBG-30553, Forwards Evaluation of Plant Compliance W/Requirements of Station Blackout Rule 10CFR50.63.Electrically-independent HPCS Sys Provides Alternate Method of Achieving Safe Shutdown Which Exceeds Station Blackout Rule Requirements (← links)
- RBG-31078, Forwards Photographs to Franklin Research Ctr Rept Analyzing Components in Asco Solenoid Valve from Plant Submitted W/ Util (← links)
- RBG-31099, Forwards Response to Violations Noted in Insp Rept 50-458/89-15 on 890402-06.Response Withheld (Ref 10CFR73.21) (← links)
- RBG-30504, Submits Addl Info Re Design Configuration of Roofs Re Drainage of Rain Water Into Gutter Sys,Per 890309 Request. Diesel Generator Bldg Has two-level Roof Arrangement. Radwaste & Auxiliary Bldgs Do Not Have Curbing Along Edges (← links)
- RBG-30505, Submits Status of Site Restoration Plans for 1988.Abandoned 22 Observation Wells & Piezometers in 1988.Placement of Const Debris in Landfill Area Ceased But Unable to Complete Regulatory Closure Until Rule Issued (← links)
- RBG-26586, Forwards NPDES Permit LA0042731,issued to Gulf States Utils Co.Permit Revised in Response to Util 870206 Request to Increase Temp Limitations on Cooling Tower Blowdown Discharge & to Change Method of Calculation Used (← links)
- RBG-27191, Responds to Concerns Noted During 871210 Exit Meeting for Insp 50-458/87-30 Re Emergency Planning.Corrective Actions: Individuals W/Incomplete Annual Retraining in Emergency Response Will Receive Training Prior to 871231 (← links)
- RBG-27213, Forwards Responses to Questions Presented in 871202 Exit Meeting Conference Call W/R Ireland & a Johnson Re Insp Rept 50-458/87-21 on 871102-30 Concerning Equipment Qualification Program & Implementation (← links)
- RBG-26529, Forwards Fee for 870513 Submittal Re Revs to Turbine Inservice Insp Program & 870716 Submittal Re Revs to Process Control Program,Per RM Diggs 870814 Request (← links)
- RBG-26545, Forwards Proposed Changes to Asiatic Clam Control Program for Review.Approval Prior to 871115 Startup Following First Refueling Outage Requested (← links)
- RBG-26536, Forwards River Bend Unit 1 Semiannual Radioactive Effluent Release Rept,Jan-June 1987 & Rev 1 to Station Operating Procedure RSP-0008, Offsite Dose Calculation Manual (ODCM) Procedure (← links)
- RBG-26501, Forwards Proposed Editorial Changes to Util 870805 Application to Amend Condition 2.C.14 of License NPF-47 Re Selected Instrumentation from Reg Guide 1.97.Util NSHC Encl (← links)
- RBG-26442, Forwards Documentation of Info Discussed W/Nrc on 870217 & 0528 Where Agreement Reached to Defer Facility Specific Containment Venting Issues Until NRC Completed Generic Review,Per SER (NUREG-0989) (← links)
- RBG-26434, Updates 870709 Response to NRC Re First Refueling Outage.Encl Attachments Provide Current Expected Schedules for Identified Activities Requiring NRC Action to Support Outage (← links)
- RBG-26452, Forwards Proprietary Info Required for Initial Updated FSAR, Per Generic Ltr 81-06, Periodic Updating of Fsars. W/ Affidavits.Info Withheld (Ref 10CFR2.790) (← links)
- RBG-26397, Requests That NUREG-1150 Comment Review Period Be Extended to Allow Sufficient Time for Supporting Documentation to Be Reviewed & Comments to Be Generated & Sent to NRC (← links)
- RBG-27174, Responds to NRC Re Violations Noted in Insp Rept 50-458/87-27.Corrective Actions:Field Engineering Procedures Given Required Approvals & Repairmen Received Personal Instructions on Requirements for Use of Hot Work Permits (← links)
- RBG-27194, Updates Util 871007,0609 & 0814 Ltrs Re Activities in Support of First Refueling Outage.List of Current Identified Activities Requiring Action Encl (← links)
- RBG-27195, Informs That License Condition 2.C.7,addressing Bypassed & Inoperable Status Indication of safety-related Sys, Completed (← links)
- RBG-27128, Submits Objectives to Be Fulfilled During Plant Emergency Planning Exercise to Support 880224 Exercise Date.Scenario Package to Be Provided 45 Days Prior to Exercise Date (← links)
- RBG-27125, Submits Objectives to Be Fulfilled During Plant Emergency Planning Exercise to Support 880224 Exercise Date.Scenario Package to Be Provided 45 Days Prior to Exercise Date (← links)
- RBG-27164, Provides Suppl Info to Util Responses to 860919 Notice of Deviation & 870915 Notice of Violation.Util Reviewed Waste Sludge Tank Sys & Determined That Operation of Sys Should Be Deferred (← links)
- RBG-27107, Forwards Affidavit & Corrections to Identifying Changes in Initial Update of FSAR (← links)
- RBG-27108, Forwards Suppl Rept of Safety Evaluations for Documents Only Changes Included in USAR for Mar 1986 - Feb 1987 (← links)
- RBG-27051, Forwards Updated Human Engineering Discrepancies (Heds) to Reflect Current Completion Status Re Dcrdr (← links)
- RBG-27066, Suppls 871030 Response to Violations Noted in Insp Rept 50-458/87-20 on 870801-0915.Corrective Actions:Technically Competent Individual Observing Samples Sent for Diesel Fuel Oil to Ensure Proper Techniques & Procedures Followed (← links)
- RBG-27036, Forwards Rev 2 to Geotechnical Calculation G(c)-232 in Response to NRC Request.Info in Support of Application for Amend to License NPF-47 Re Settlement Monitoring Submitted by (← links)
- RBG-26995, Responds to NRC Re Violations Noted in Insp Rept 50-458/87-24.Corrective Actions:Work Copies of Incorrect Procedure STP-000-3001 Maintained at Security Compliance Section Immediately Destroyed (← links)
- RBG-27009, Remits Fee for 871113 Application for Amend to License NPF-47.Fee Inadvertently Omitted (← links)
- RBG-26367, Provides Info Re Util 870619 Submittal of Proposed Changes to Tech Spec Administrative Controls (← links)
- RBG-26363, Requests Approval of one-time Extension of Allowed Outage Time for Drywell Atmosphere Gaseous & Particulate Radioactivity Monitoring Sys.Details & Bases for Request Encl (← links)
- RBG-26880, Forwards Rept on Containment Access Mgt & Containment Purge Activities During Cycle 1 Operation at Plant.Rept Satisfies SER Section 6.4.2.3 Re Containment Purge Data Collection (← links)
- RBG-26946, Forwards Proposed Rev 9 to Physical Security Plan,Per NRC 870922 Request for Addl Info Re Miscellaneous Amends & Search Requirements.W/O Encls (← links)
- RBG-26874, Forwards Supplemental Info to Util Initial Rept on ATWS Rule,Per Wa Paulson 870916 request.W/30 Oversize Drawings, Including Nine Final Design Changes (← links)
- RBG-26890, Forwards Review Results Re Issue on Security Computer & Mux Loop Communications.Addl Investigation Required to Adequately Determine Permanent Solution to Computer Power Circuitry (← links)
- RBG-26859, Submits Results of Analyses on Two Unknown Liquid Samples Received on 870707 from Radiological & Environ Sciences Lab for Radiochemical Analysis as Part of Confirmatory Measurements Program (← links)
- RBG-26873, Responds to Violations Noted in Insp Rept 50-458/87-20 on 870801-0915.Corrective Actions:Fuel Oil Analysis Requirements Entered Into Surveillance Test Procedure Tracking Program & CSP-0100 Reviewed & Revised (← links)
- RBG-26860, Forwards Addendum to Semiannual Radioactive Effluent Release Rept for Jan-June 1987. Addendum Provides Info Which Was Not Available at Time of Original Submittal (← links)
- RBG-26365, Forwards Rept on ATWS Mods,Per Paragraph (c)(6) of 10CFR50.62,demonstrating Adequacy of Facility Sys Required to Meet ATWS Rule,Per Util .All Mods Planned to Be Completed During Refueling Outage Scheduled for 870915 (← links)
- RBG-26368, Forwards Rev 0 to 23A5819, Supplemental Reload Licensing Submittal, to Support Second Cycle Operation Scheduled for Nov 1987.Rept Supplements May 1986 NEDE-24011-P-A-8, GE Std Application for Reactor Fuel (← links)
- RBG-26357, Provides Addl Info to Attachment 4 to Util Re Efforts to Conduct Surveillances for Five Valves Subj to 10CFR50,App J Requirements,Per 870729 Discussion.Util Will Continue to Maintain List of Tests for Forced Outage (← links)
- RBG-26347, Responds to Violations Noted in Insp Rept 50-458/87-14 on 870501-0615.Corrective Actions:Memo Issued to Reiterate Importance of Signing Required Steps for Procedures Re Surveillance & Test Activities for safety-related Equipment (← links)
- RBG-26337, Forward Proposed Tech Specs W/Addl Editorial Info Re Util 870310 & 0511 Submittals on Requests for Extension of Tech Spec Surveillance Intervals (← links)
- RBG-26327, Provides Updated Status of SPDS Human Engineering Discrepancies,Addressed in Util (← links)
- RBG-30250, Revises Response to Violations Noted in Insp Rept 50-458/88-08.Corrective actions:100% Review of 31 High Temp Leak Detection Alarms Performed & Errors Identified & Corrected (← links)
- RBG-26300, Forwards Editorial Correction to 870310 Tech Spec Section 4.6.1.3.f,Page 3/4 6-5 (← links)
- RBG-26274, Forwards Rev 2 to RWS-0204, Radwaste Processing Control Program, Per NUREG-0989.Requests NRC Approval by 871015 So That Revised Program Can Be Implemented Prior to Startup After First Refueling Outage (← links)
- RBG-30243, Responds to NRC Bulletin 88-007,Suppl 1, Power Oscillations in Bwrs. All Appropriate Operating Procedures Revised & Currently Implemented (← links)
- RBG-21450, Forwards Supplemental Commitment Dates Re Significant Deficiencies Identified in Insp Rept 50-458/84-35,per Util & 850614,19 & 28 Telcons.List Contains Revised Projected Completion Dates for Fuel Load (← links)
- RBG-21858, Advises That 32 Items Noted in Util 850503,17 & 0628 Responses to Deficiencies Noted in Insp Rept 50-458/84-35, Completed.Three Remaining Items Rescheduled for Completion by 850925 (← links)
- RBG-30175, Forwards Response to Verbal Request for Supplemental Info Re 880805 Application for Amend to License NPF-47.Amend Request Allows Plant Operation in Event That Feedwater Heaters Become Inoperable (← links)
- RBG-26764, Forwards Addenda Pages to Annual Radiological Environ Operating Repts, for Oct-Dec 1985 & Jan-Dec 1986.Data Inadvertently Omitted from Original Submittals & Does Not Affect Plant Operations (← links)
- RBG-26762, Provides Info in Support of NRC Final Review of Tdi Owners Group Design Review & Quality Revalidation Program for Facility.Phase I Maint & Surveillance Program Will Be Implemented.Phase II Insps Completed.Status of Mods Encl (← links)
- RBG-26757, Updates 870609 & 0814 Ltrs Responding to WR Butler Re Activities in Support of Facility First Refueling Outage.Current Expected Schedules for Identified Activities Requiring NRC Action to Support Refueling Outage Encl (← links)
- RBG-26763, Forwards Proposed Draft Outline for Hydrogen Control Rept, in Response to NRC 870909 Request.Util Revising Schedule for Submittal of plant-specific Hydrogen Control Analysis to 6 Months Following Issuance of SER on Topical Rept HGN-112 (← links)
- RBG-30186, Provides Supplementary Info on Roofing Program,As Committed in Util .Purpose of Built Up Roofing Is to Provide Drainage,Watertightness,Installation & Protection of Access Openings (← links)
- RBG-30184, Forwards Supplemental Response to Notice of Violation from Insp Rept 50-458/88-09.Current Status on Util Corrective Action Taken on Item 8809-01, Assessment Aids Provided. Response Withheld (Ref 10CFR73.21) (← links)
- RBG-29587, Forwards Objectives to Be Fulfilled During Facility Emergency Planning Exercise.Scenario Package Will Be Provided 45 Days Prior to Exercise Date (← links)
- RBG-26261, Submits Editorial Info Re 870511 & 15 Requests for Extension of Tech Spec Surveillance Intervals.Replacement Pages Encl (← links)
- RBG-29588, Corrected Response to Violations Noted in Insp Rept 50-458/88-22 on 880829-0915.Corrective Actions:Operations Has Implemented Control Board Walkdown Checklist for Unit Operator to Use as Guide During Shift Turnover (← links)
- RBG-30026, Responds to SALP Insp Rept 50-458/87-32 Covering Apr 1987 - Sept 1988.Corrective actions:in-depth Assessment of Security,Utilizing Outside Individuals W/Nuclear Security Expertise,Initiated & Security Equipment Will Be Repaired (← links)
- RBG-26690, Provides Supplemental Response to 850520 Response to Generic Ltr 83-28.Functional Test Backup Scram Valves Will Be Performed Once Every Refueling Outage.Util Has Administrative Controls to Ensure Test Implemented (← links)
- RBG-26213, Discusses Util Commitment to Provide Rept Re Methods Used to Establish GE Supplied Trip Setpoints & Allowable Values for Protection Sys Channels.Rept Will Include Listed Info.Info Will Be Incorporated in Next USAR (← links)
- RBG-30090, Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Startup Testing Ensured That air-operated Components Failed as Designed on Loss of Instrument Air (← links)
- RBG-26673, Forwards Rev 2 to Radwaste Processing Control Program, for Review & Approval,Per NUREG-0989 (← links)
- RBG-26223, Provides Clarification to Description Portion of Util 870310 Attachment 4 Submittal.Five Valves Identified for Tech Spec Section 4.6.1.3.d Require Exemption for 10CFR50,App J Criteria (← links)
- RBG-26206, Responds to Violations Noted in Insp Rept 50-458/87-12 on 870413-16.Corrective Actions:Procedure PSP-4-083 Re Assignment & Retention of Unescorted Access Revised to Adjust Access Levels Once Each 31 Days (← links)
- RBG-26651, Forwards Proprietary Suppl 1 to Supplemental Reload Licensing Submittal for River Bend Station Reload 1. Rept Withheld (Ref 10CFR2.790) (← links)
- RBG-26188, Suppl Response to Violations Noted in Insp Rept 50-458/86-27.Rev of Surveillance Test Procedures W/Potential Problems Have Been Completed W/Exception of Instrumentation & Control (I&C) Procedures (← links)
- RBG-26189, Submits Suppl Response to Re Violations Noted in Insp Rept 50-458/85-31.Commitment to Revise Surveillance Test Procedures to Incorporate Mods to Integrated Leak Rate Test Procedure 1-PT-57-1 Scheduled for Completion by 871231 (← links)
- RBG-26186, Withdraws Five Previously Proposed Amends to License NPF-47, Extending Surveillance Intervals for Tech Spec Surveillance Requirements Until First Refueling Outage Scheduled for 870915.Proposed Changes Performed During Unscheduled Outage (← links)
- RBG-26187, Responds to NRC Re Violations Noted in Insp Rept 50-458/87-11.Corrective Actions:Temporary Change Notice 87-0343 Issued to Correct STP-511-8208 to Agree W/Offsite Dose Calculation Manual Methodology (← links)
- RBG-26628, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/87-16.Corrective Actions:Fsar Change Processed & Submitted to NRC to Clarify Util Use of Backwash Tank & Sampling & Analyzing for Solid Radwaste Processing (← links)
- RBG-26646, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-20.Corrective actions:77 Mod Requests Initiated from 100% Review of 220 P&Ids (← links)
- RBG-26184, Forwards Proposed Design for Temp Monitoring Sys in Uhs,In Response to Sser 3 (NUREG-0989) & License Condition 2(C)(9) of License NPF-47 (← links)
- RBG-26592, Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants (← links)
- RBG-24583, Forwards Supplemental Response to Violation 8620-02 Noted in Insp Rept 50-458/86-20.Corrective Actions:Missing Pipe Caps Replaced,Valve E12*VF063C Locked & RHR SOP Revised to Agree W/Existing Engineering,Piping & Instrument Drawings (← links)
- RBG-26109, Provides Update of Licensee Plans for Restoring Unit 2 Re Const Areas Due to Cancellation of Unit,Per Util . Util Currently Evaluating Alternatives to Disposition of Unit 2 Excavation Originally Proposed (← links)
- RBG-24405, Forwards Addl Info Re 860917 Application for Amend to License NPF-47,changing RCIC Sys Tech Specs as Result of 860908 Valve Inoperability Event.Fuel Failure Not Expected Due to Provision of Makeup Water from Feedwater or HPCS Sys (← links)
- RBG-24512, Forwards Alternative Methods of Compliance w/10CFR50.55a, Item a.2 for Consideration.Vendor Documentation of Compliance to Matl,Production & Testing Requirements of Applicable Code Also Encl (← links)
- RBG-25090, Responds to Re Effects of Potential Bankruptcy of Util on Facility.Util Continues to Fulfill All Financial Obligations (← links)
- RBG-24508, Suppls 860514 Response to Item a of IE Bulletin 85-003.BWR Owners Group Efforts to Develop Generic Position for Meeting Item a Documented in 860902 Submittal.Completion of Items b-d Anticipated by 871115 (← links)
- RBG-24898, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-27.Corrective Actions:Splice Will Be Encl in Accordance W/Intent of Electrical Spec 248.000 Via Mod Request 86-1752 (← links)
- RBG-24252, Corrected Ltr,Forwarding Rev 8 to Station Physical Security Plan.Plan Withheld (Ref 10CFR2.790(d)) (← links)
- RBG-26069, Forwards Supplemental Info to Attachment 1 to 870318 Submittal Re Automatic Depressurization Sys Actuation,Per NRC Request (← links)
- RBG-26068, Updates Util 870326 Response to WR Butler Re Activities Supporting Plant First Refueling Outage.Encl List Provides Schedules for Identified Activities Requiring NRC Action (← links)
- RBG-26070, Forwards Supplemental Info to Attachments 1 & 4 of 870310 Submittal Re Safety Relief Valves & Leak Rate Tests,Per NRC Request (← links)
- RBG-24849, Responds to NRC Ltr Re Deviation Noted in Insp Rept 50-458/86-24.Corrective Actions:Listed Procedures Will Be Rewritten,Per Procedure OSP-0009, Authors Guide/Control & Use of Emergency Operating Procedures (← links)
- RBG-24461, Forwards Revised Emergency Implementing Procedures (Eip) Index,Indicating Revs Submitted W/Amend 23 to FSAR & New Eip Revs,Including Rev 4 to EIP-2-102, Training,Drills & Exercises (← links)
- RBG-24816, Forwards Suppl 1 to Startup Test Rept, Covering Period Through 861031.Info Submitted Per Tech Specs 6.9.1.2 & 6.9.1.3 & Reg Guides 1.16 & 1.68 (← links)
- RBG-24865, Forwards Proposed Changes to Physical Security Plan.Changes Described in Rev 9 Not Implemented,Pending Approval by Commission.Changes Withheld (Ref 10CFR73.21) (← links)
- RBG-23306, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-09.Corrective Actions:Computer Model for Reactor Bldg Support Case R3 Corrected & Reanalyzed & Structural Engineers Retrained (← links)
- RBG-24358, Forwards Rev 2 to Pump & Valve Inservice Testing Plan, First 10 Yr Insp Interval, Adding Tech Spec Limit for Ref RCIC Sys Pump & Deleting Ref Suppression Pool Pumpback Sys Pumps,Per Encl Relief Requests.Fee Paid (← links)
- RBG-25995, Responds to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. Leak Testing Performed Every 18 Months at Facility,Including High Pressure Tests at 1,025 Psig,Per Tech Specs (← links)
- RBG-24143, Requests Extension to 18-month Surveillance of Turbine Overspeed Protection Sys,Per Tech Spec 3/4.3.8,until 861004 to Correspond W/Next Scheduled Outage When Reactor in Mode 3,4 or 5 (← links)
- RBG-24818, Forwards Rev 0 to Preservice Insp Request for Relief R0012D Re Bottom Head to Reactor Vessel Circumferential Weld Aa. Exam of Bottom Head Side of Weld Could Not Provide Meaningful Info (← links)
- RBG-24674, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/86-28.Corrective Actions:Permanent ALARA Coordinator Assigned Since 861016 & Contractor Assigned to ALARA Section in Preparation for PO4 Outage (← links)
- RBG-25939, Forwards Proprietary Results Based on GE Probability of Missile Generation in GE Nuclear Turbines & Revised FSAR Section 10.2.3.6 Re Description of Turbine Inservice Insp Program.Rev Will Be Included in Future FSAR Update (← links)
- RBG-25903, Forwards Status of Util & Hydrogen Control Owners Group Efforts on Outstanding Concerns Re Hydrogen Control Rule. Completion of Efforts Should Be Sufficient to Demonstrate Compliance W/Hydrogen Control Rule or Identify Mods (← links)
- RBG-25840, Forwards Check for Review of Util 870130 Rev 3 to River Bend Station Pump & Valve Inservice Testing Plan, Per 870326 Request (← links)
- RBG-25276, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-36 on 861012-23.Corrective Actions:Temporary Alteration & Prompt Mod Request Removed After Determining That Unreviewed Safety Question May Exist (← links)
- RBG-25714, Forwards Addl Info Re 870128 Application for Amend to License NPF-47,revising Tech Specs Re Scram Discharge Vol Instrumentation Setpoints (← links)
- RBG-23968, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-09.Corrective Actions:Personnel Assigned to Operations Support Ctr Will Receive Module 11, Operations Support Ctr Drill (← links)
- RBG-25244, Forwards Rev 4 to Safeguards Contingency Plan & Explanation of Changes.Rev & Explanation Withheld (Ref 10CFR73.21) (← links)
- RBG-25094, Forwards Rev 5 to Security Training & Qualification Plan & Explanation of Changes.Encls Withheld (Ref 10CFR73.21) (← links)
- RBG-25392, Supplemental Response to NRC Re Violations Noted in Insp Rept 50-458/86-40.Corrective Actions:Temporary Change Notice 86-1947 Issued on 861223 to Change Step 7.4.29 Into Two Separate Steps & Rev 2 to STP-209-0302 Issued (← links)
- RBG-25121, Forwards Response to NRC Re Violation Noted in Insp Rept 50-458/86-30 on 860922-26.Corrective Actions: Procedure STP-000-3001, Daily Fire Door Position Check, Revised & Fire Watches Established (← links)
- RBG-25133, Notifies That,Effective on 870101,JC Deddens Will Be Senior Vice President in Charge of Operations.Nrc Should Continue to Send Copies of All Correspondence to Je Booker (← links)
- RBG-25382, Forwards Suppl 2 to Startup Test Rept, Covering Period Through 870130.Info Submitted Per Tech Specs 6.9.1.2 & 6.9.1.3 & Reg Guides 1.16 & 1.68 (← links)
- RBG-25207, Forwards Emergency Planning Exercise Scenario for 870225 Exercise,Per NRC 840209 Request.Scenario Package Contains Exercise Objectives,Observer Info,Narrative Summary & Onsite & Offsite Messages (← links)
- RBG-23800, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-16.Corrective Actions:General Maint Procedure 6MP-0092 Being Developed as Alternative to Torque Wrench Program (← links)
- RBG-23811, Forwards Description of Change to Initial Test Program Re Test Condition 4 Concerning Natural Circulation & Summary of Safety Evaluation,Per License NPF-47,Section 2.C(12) (← links)
- RBG-25339, Forwards Table 2.2.1-1,inadvertently Omitted from Encl 2 to 870128 Tech Spec Change Request,For Review & Concurrence (← links)
- ML20210V461 (← links)
- RBG-24487, Responds to NRC Re NSHC for Util Request Concerning Tech Specs for Tdi Diesel Generator Insp/ Reliability Program.Proposed Change Will Not Increase Probability of Accident (← links)
- RBG-24481, Suppls 860228 & 850515 Responses to Generic Ltr 82-33, Requirements for Emergency Response Capability. Status of SPDS & Digital Radiation Monitoring Sys Discussed (← links)
- RBG-23474, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-80.Corrective Actions:Revised Emergency Implementing Procedures EPIP-2-014 & EPIP-2-017 Submitted on 851210 & SSP-1-001 Revised to Address Revs Distribution (← links)
- RBG-24432, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-22.Corrective Actions:New Mixing Blade Assembly Designed,Installed & Tested W/Satisfactory Results & Containers Processed W/Old Blade Assembly Inspected (← links)
- ML20210P584 (← links)
- RBG-23262, Submits Supplemental Response to Violations Noted in Insp Rept 50-458/85-69.Corrective Actions:Procedure Revised to Control Engineering Activities for Handling Mod Requests. Training of Personnel Commenced on 851209 (← links)
- RBG-24325, Suppls Response to Violations Noted in Insp Rept 50-458/86-08.Complete Review of 1985 Internal Audit Files Will Be Completed by 861128,not 860831,due to Unanticipated Scope of Task (← links)
- RBG-23263, Suppls Response to NRC 851218 & s Re Violations Noted in Insp Rept 50-458/85-74.Corrective Actions:Ge Sent Heat Treatment Records for Quality Data Package Master Parts List C41-F004 Serial 464 & 465 (← links)
- RBG-23047, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-73.Corrective Actions:Review of All Radiation Protection Technician Qualifications Begun & Procedure RSP-0003 Will Be Revised by 860321 (← links)
- RBG-25296, Responds to 861023 Request Re Unresolved Item 8624-03, Condensate Pump Injection Pressure. Max Injection Pressure Ranges Will Be Incorporated Into Emergency Operating Procedure EOP-0001 During First Quarter 1987 (← links)
- RBG-25846, Forwards Suppl 3 to Startup Test Rept. Rept Covers Period Through 870423 (← links)
- RBG-24275, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-20.Corrective Actions:Individuals Instructed to Comply W/Requirements of ADM-0003 When Initiating Future Temporary Change Notices (← links)
- RBG-22558, Notifies That Const of Normal Cooling Towers 3 & 4 Completed & Testing Scheduled to Be Completed by 851225 & 860115, Respectively (← links)
- RBG-22592, Forwards marked-up Tech Spec Pages 8 3/4 4-4,8 3/4 4-5 & 6-16 Re Generic Ltr 85-19 Inadvertently Omitted During Reproduction of (← links)
- RBG-22557, Forwards Weekly Status Rept Re License Conditions & Other Commitments Completed During Previous Wk & Cumulatively Since Issuance of Low Power License,In Response to (← links)
- RBG-22166, Forwards Addl Info Re Notice of Violation Contained in Insp Rept 50-458/85-43.Chronology of Events Listed.Psar Change Submitted by S&W Approved (← links)
- RBG-24324, Forwards Responses to 860807 Notice of Violation & Proposed Imposition of Civil Penalties.Responses & Request for Remission or Mitigation of Civil Penalties Withheld (Ref 10CFR73.21) (← links)
- RBG-25814, Responds to NRC Re Violations Noted in Insp Rept 50-458/87-03.Corrective Actions:High Priority Given to Correcting Equipment Deficiencies That Made post-accident Sampling Sys (PASS) Inoperative.Addl PASS Training Planned (← links)
- RBG-25801, Responds to NRC Re Violations Noted in Insp Rept 50-458/87-06.Corrective Actions:Training for First Aid & Emergency Notification Process Increased & Procedures EIP-2-017 & EIP-2-102 Revised (← links)
- RBG-25290, Forwards Rev 3 to Pump & Valve Inservice Testing Plan,River Bend Station,First 10-Yr Insp Interval, Per 10CFR50.55a(q). Rev Summary Also Encl (← links)
- RBG-25799, Responds to NRC Re Deficiency Noted in Insp Rept 50-458/86-35.Corrective Actions:Alternate Method for Making Hotline Notifications Under Investigation (← links)
- RBG-25800, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-458/87-04.Response Withheld (Ref 10CFR73.21) (← links)
- RBG-25295, Forwards Response to Violations Noted in Insp Rept 50-458/86-31.Response Withheld (Ref 10CFR73.21) (← links)
- RBG-25021, Forwards Objectives to Be Fulfilled During Facility Emergency Planning Exercise on 870225.Scenario Package Will Be Provided 45 Days Prior to Exercise (← links)
- RBG-24560, Requests Review of 870225 Scheduled Date for Annual Emergency Preparedness Exercise in Relation to Region IV Schedule of Activities.Proposed Schedule of Submittals Re Exercise Listed (← links)
- RBG-25462, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-39 on 861208-12 & 870112-16.Corrective Actions: Temporary Change Notice Issued for Rev 6 to Surveillance Test Procedure STP-051-4234 (← links)
- RBG-25452, Forwards Preliminary Rev 2 to Inservice Insp Plan, as Suppl to 870227 Initial Response to NRC 870121 Request for Addl Info.Complete Rev 2 Will Be Submitted by End of May 1987,following Update of Plan Apps (← links)
- RBG-25254, Forwards Supplemental Response to Notice of Violation 8627-02 Re Failure to Follow Surveillance Test Package Per Insp Rept 50-458/86-27 on 860801-0915.Temporary Change Notices Issued Against Listed Procedures (← links)
- RBG-29023, Requests Meeting W/Nrc During Wk of 881031 to Discuss Encl Agenda Items Re Proposed Changes to Tech Specs 3.8.1.1, AC Sources - Operating, 3.74, Snubbers & License Item 2.c(4) Re Seismic Qualification of CRD Hydraulica Controls (← links)
- RBG-25205, Submits Supplemental Response to Violations Noted in Insp Rept 50-458/86-20.Corrective Actions:Mod Requests 86-1587 & 86-1588 Initiated to Add Notes to P&ID Re Valve Position & Pipe Caps & Procedures Developed for Locked Valves (← links)
- RBG-25103, Partially Withheld Response to Violations Noted in Insp Rept 50-458/86-29 on 860825-28 Re Inadequate Safeguards Contingency Plan Implementation (Ref 10CFR73.21) (← links)
- RBG-25093, Forwards Rev 10 to Physical Security Plan & Explanation of Changes.Encls Withheld (Ref 10CFR73.21) (← links)
- RBG-25115, Addresses Transmittal of Rev 5 to Physical Security Plan to Director of NRR Rather than Region IV Administrator.Rev Will Not Be Resubmitted Due to Region IV Review Contained in Insp Rept 50-458/86-38 During Wk of 861117 (← links)
- RBG-28873, Forwards Response to Violations Noted in Insp Rept 50-458/88-14 on 880613-17.Encl Withheld (Ref 10CFR73.21) (← links)
- RBG-24018, Forwards Vols 1-5 to Rev 1 to ...Inservice Insp Plan,First Interval & Vol 1 to Pump & Valve Inservice Testing Plan, ...,First 10-Yr Insp Interval, Per License Condition 2.C.6. Fee Paid (← links)
- RBG-23964, Suppls Response to NRC Re Violations Noted in Insp Rept 50-458/86-16.Corrective Action:General Maint Procedure GMP-0092 Being Developed as Alternative to Torque Wrench Program (← links)
- RBG-25104, Responds to 860627 Request for Addl Info Re Facility Spds. Human Factors Engineering Evaluation Performed on Emergency Response Info Sys,Spds & Digital Radiation Monitoring Sys. Detailed Description of Evaluation Methodology Encl (← links)
- RBG-25134, Notifies That Jc Deddens Will Be Senior Vice President in Charge of Operations,Effective on 870101.Submittal of Correspondence to Listed Persons & Addresses Requested (← links)
- RBG-28373, Requests 880815 Meeting W/Nrc to Discuss Proposed License Amend to Primary Containment Integrity/Fuel Handling Tech Specs (← links)
- RBG-28372, Discusses Changes in Fitness for Duty Program.Newly Negotiated Agreement W/Union Provides Only for Planned Testing & step-by-step Program Wherein Personnel Testing Positive for Drug Use Are Suspended for 45 Days (← links)
- RBG-24124, Partially Withheld Response to NRC Re Violations Noted in Insp Rept 50-458/86-10 (Ref 10CFR73.21) (← links)
- RBG-23915, Informs That Mods to Startup Test Program Re Test Condition 4 (ST-22 & ST-23A),MSIV Full Closure (ST-25B) & Recirculation Two Pump Trip (ST-30B) Tested & Approved on 860606-14 Per Section 2.C(12) of License NPF-47 (← links)
- RBG-23905, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-14.Corrective Actions:Procedure Changed to Verify Proper Fuel Oil Strainer Valve Alignment for Diesel Generators During Each Shift (← links)
- RBG-29382, Forwards Revised Monthly Operating Rept for Sept 1988 for River Bend Station Unit 1.Rept Revised to Correct Forced Outage Rate,Duration for Shutdown 88-14,duration of Power Reduction 88-15 & Duration of Shutdown 88-16 (← links)
- RBG-29381, Responds to NRC Re Violations Noted in Insp Rept 50-458/88-19.Corrective Actions:Training Conducted to Caution All Technicians on Requirements for Following Steps in Sequence Prescribed in Procedures (← links)
- RBG-23914, Forwards Rev 4 to Preservice Insp Plan Submitted on 841105. Submittal Contains 860512 Relief Request & Text Changes Identified for Rev 4.Fee Paid,Per RM Diggs 860609 Request to Cahill (← links)
- RBG-29285, Forwards 1987 Annual Rept (← links)
- RBG-29277, Informs That Licensee Making Change to Station Support Manual Procedure SSP-1-001 to Meet 10CFR50.54(q) Criteria in Response to Insp Rept 50-458/85-80 (← links)
- RBG-25559, Responds to WR Butler Re Activities Supporting First Refueling Outage.Encls Provide Expected Schedules for Currently Identified Activities Requiring NRC Action (← links)
- RBG-25579, Informs That Due to Delays in Quarter Scale Test Program, Hydrogen Control Owners Group Schedule for Completing Generic Activities & plant-specific Testing Delayed Until Jul 1987.Survivability Analysis Expected by Sept 1987 (← links)
- RBG-25561, Responds to Notice of Violation 8702-01 Noted in Insp Rept 50-458/87-02 on 870101-0215.Corrective Actions:Procedures RPP-0043, Personnel Frisking & SPI-4, Security Position Instruction, Revised (← links)
- RBG-23566, Suppls 860227 Response to Violations Noted in Insp Rept 50-458/85-81.Departmental Review of All Station Operating Procedures in Main Control Room Controlled Copy 3 Conducted & Station Document Control Reassignment Made (← links)
- RBG-23508, Responds to NRC Re Violations Noted in Insp Rept 50-458/86-04.Corrective Actions:Hold Point on Electrical Maint Work Requests for Category I Electrical Equipment Panels Included in QC (← links)
- RBG-23253, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-77.Corrective Actions:Fcn 19 Corrected & FCN 23 Prepared to Consolidate All Outstanding Design Changes (← links)
- RBG-33196 (redirect page) (← links)