RBG-29382, Forwards Revised Monthly Operating Rept for Sept 1988 for River Bend Station Unit 1.Rept Revised to Correct Forced Outage Rate,Duration for Shutdown 88-14,duration of Power Reduction 88-15 & Duration of Shutdown 88-16

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Rept for Sept 1988 for River Bend Station Unit 1.Rept Revised to Correct Forced Outage Rate,Duration for Shutdown 88-14,duration of Power Reduction 88-15 & Duration of Shutdown 88-16
ML20206L750
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/22/1988
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20206L755 List:
References
RBG-29382, NUDOCS 8811300231
Download: ML20206L750 (1)


Text

____ ____ . . _ _ ____ _

GULF STATES UTELITIES COMPANY

~,i n n e m m , a t, , v - ~, m , w , a

% ~ . m n.o November 22, 1988 RBG- 29382 File Nos. G9.5, G9.25.1.5 U.S. Nuclear Regulatory Comission Document Control Desk Washington, D.C. 20555 Gentlemen:

River Bend Station - Unit 1

, Docket No. 50-458 Enclosed is Gulf States Utilities Company's*RevitefMonthly Operating Report for September 1988 for River Bend Station (RBS) - Unit 1. This report is revised to correct the forced outage rate, the duration for shutdown 88-14, the duration of power reduction 88-15 and the duration of shutdown 88-16. This rg :;. 6 is submitted in accordance with RBS

'. Technical Specification 6.9.1.6. Revi;40ns are noted with a side bar in the right nargin k

Sincerely,

[ p J. E. Booker

Manager-River Bend Oversight

! River Bend Nuclear Group JE8/LAE/ F/ch Enclosure cc: U.S. Nuclear Regulatory Commission 1

Region IV

611 Ryan Plaza Drive. Suite 1000 Arlington, TX 76011 NPC Resident Intpector i P.O. Box 1051
. St. Francisville, LA 70775 i

1NPO Records Center l 1100 Circle 75 Pariway

Atlanta, GA 30339 4

! CajJn Electric Power Coop., Inc. p i

i 8811300231 881122 I I PDR ADOCN 05000458 R {

PDC