Submits Response to Generic Ltr 88-14, Instrument Air Problems in Lwr. Due to Low Concentration of Particles in Excess of Acceptable Limits,No Operability or Safety Concerns Noted
ML19325D786
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/17/1989
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-14, RBG-31629, NUDOCS 8910260144
Download: ML19325D786 (1)


Text

t

,.E, .,g g "dt ( _

r

^

(

GULF STATES UTEL1T1ES COMPANY Eg i AfdM htND S T ATi(>N 9'Dit 06fiCl tiOE ??D $1 FhANO5vtil L(%HMM.A 70776  !

AMAC014bM 64 bOM M6SH1 V October 17,1989 RBG- 31629  :

x File Code G9.5, G9.33.4 l

e l U. S.-Nuclear Regulatory Commission ,

[ Document Control Desk l t Washington, D.C. 20555 l r> .

! Gentlemen: i f River Bend Station - Unit 1  !

Docket No. 50-458 '

I Gulf States Utilities (GSU) on July 14, 1989 provided a response to Generic  !

Letter 88-14, Instrument Air Problems ,in Light Water Reactors. In this i response GSU stated that all particulate testing results were below l manufacturer's allowable particulate size specifications.- This conclusion

was based on an initial evaluation. Subsequent evaluation of.the test  !

results by an independent source has discovered that one instrument air

' header, the drywell containment header, contained a number of particles which f a did not meet applicable acceptance criteria. One test point which has. a  !

maximum allowable particle size 'of 40 microns contained a small number of  !

. particles 60 microns in _ size. Another test point on the header with

. acceptable USAR limits of . 5 microns had a small number of 10 micron  !

. particles. ,

GSU has evaluated the results of this instrument air particulate test and .l

!. determined that because of the low concentration of particles in excess of  !

g" the acceptable limits, no safety or operability concerns for any equipment  !

are created by this finding. Further engineering evaluation is being pursued l on the containment /drywell header particulate sample. This evaluation will i be completed by January 31, 1990. Within 30 days of completion of this evaluation, GSU will submit a report to the NRC.

J If you have any questions regarding this matter, please contact Mr. L. L.

Dietrich of my staff at (504) 381-4866.

Sincerely, f 04*b/

r J. E. Booker

!" Manager-River Bend Oversight River Bend Nuclear Group JEB/LAE/L /JWL/ch t

cc: U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 8910260144 891017 N

PDR ADOCK 05000450 M 0g NRC Resident Inspector d II Post Office Box 1051 e

.St. Francisville, LA 70775 L}