Submits Status of Site Restoration Plans for 1988.Abandoned 22 Observation Wells & Piezometers in 1988.Placement of Const Debris in Landfill Area Ceased But Unable to Complete Regulatory Closure Until Rule Issued
ML20244D509
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/10/1989
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBG-30505, NUDOCS 8904210374
Download: ML20244D509 (2)


Text

_

-_----_r.--- . - - . - - - - - - _ _ - - - - - - - - - _ - - _ - _ _ _ _ - - - - -

.9 g

. s' l'. -

GULF STATES. UTILITIES COMPANY e5 RIVLH BENO ST ATION POST OUKE BOX 220 5 t T H ANCISVILLE. LOUISIANA 7077?i AREA CODE 504 635 60M 346 8661 April 10,1989 RBG- 30505 '

File Nos. G9.5 l

U. S. Nuclear Regulatory Commission Document Control Desk-

-Washington, D.C. 20555 Gentlemen:

River Bend Station - Unit 1 Docket No. 50-458 By letter dated March 30, 1988, Gulf States Utilities Company (GSU) stated their site restoration plans'for 1988. The status of each' item is listed below:

1 Abandonment of Observation Wells and Piezometers During 1988, 22 observation wells and piezometers were abandoned. The required forms have been filed with the Louisiana Office of Public Works.

GSU expects to continue to abandon and plug wells and piezometers at this pace.

Close and Restore the Area Adjacent to the Primary Spoil Area During 1988, erosion repairs and protection were accomplished in this area used as a permitted construction debris landfill. Although placement of construction debris in the landfill has ceased, regulatory closure cannot be completed until the Louisiana Department of Environmental Quality issues final closure rules in late 1991.

Clarifier and Normal Cooling Towers Drainage and Erosion During 1988, approximately 50% of the work around the clarifiers was completed. No work was performed around the normal cooling towers.

Maintenance of the Unit 2 Berm and Excavation Slopes During 1988, the Unit 2 berms and excavation slopes near the ultimate heat ,

i sink and service water tunnel were maintained in a condition to enable them to fulfill their safety function. Db B904210374 890410

.PDR P.

ADOCK 05000458 PDC d(n V

j) .: 4 -

$RC Page 2 GSU will continue any uncompleted 1988 sork as well' as the remainder of site restoration work in accordance with the RBS Site Restoration Plan.

If any additional,information is required, please~ contact Mr. James W. Cook at-(504)~381-4151.. ,

Sincerely,

. fe d@

J. E. Booker Manager-River Bend Oversight River Bend Nuclear Group AY - Quo JEB/L'A!/RJK/dWC/RWF/ch cc: U. S. Nuclear Regulatory Commission Region'IV-611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Mr. Walt A. Paulson U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555