RBG-25103, Partially Withheld Response to Violations Noted in Insp Rept 50-458/86-29 on 860825-28 Re Inadequate Safeguards Contingency Plan Implementation (Ref 10CFR73.21)

From kanterella
Jump to navigation Jump to search
Partially Withheld Response to Violations Noted in Insp Rept 50-458/86-29 on 860825-28 Re Inadequate Safeguards Contingency Plan Implementation (Ref 10CFR73.21)
ML20207M972
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/17/1986
From: William Cahill
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
RBG-25103, NUDOCS 8701130362
Download: ML20207M972 (1)


Text

,

., SAFEGUARDS INFORMATION 'SP-5 79 GULF STATES UTELITIES COMPANY RivtR BEND STATION POST OFFICE BOX 220 ST FR ANCISVILLE, LOUIStANA 70775 ARE A CODE bo4 635 6094 346 8651 Deceg RBG-g 17, 1986 File Nos. G9.5, G15.4.1 Mr. Robert D. Martin, Regional Administrator U.S. Nuclear Regulatory Commission g gggggg Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 DE 2 3 E s __

I

Dear Mr. Martin:

River Bend Station - Unit 1 Refer to: Region IV Docket No. 50-458/ Report 86-29 As discussed with Mr. L.A. Yandell of your office on December 15, 1986, this letter is being provided at this time as Gulf States Utilities Company's (GSU) response to the Notice of Violation contained in NRC Inspection Report No. 50-458/86-29. The inspection was performed by Messrs. James A.F. Kelly, A.F. Caldwell, and A.B.

Earnest during the period August 25-28, 1986 of activities authorized by NRC Operating License NPF-47 for River Bend Station (RBS) Unit No.

1.

GSU's response to the Notice of Violation 458/8629-01, " Inadequate Safeguards Contingency Plan Implementation", is provided in enclosed Attachments 1 and 2. In accordance with 10CFR73.21, information contained in the attachments has been determined to contain safeguards information and should be handled accordingly. This completes GSU's response to the Notice of Violation.

Sincerely,

/

8701130362 861217 PDR G ADOCK 05000458 . J. Cahil , Jr.

PDR Senior Vice President n pgp  % River Bend Nuclear Group WJC/DM/KJK/ M/je Attachments cc: D.D. Chamberlain w/o U.S. Nuclear Regulatory Commission Region IV Senior Resident Inspector THIS PAGE NOT SUBJECT TO PROTECTIVE REQUIREMENTS WHEN SEPARATED FROM MATERIAL CONTAINING SAFEGUARDS INFORMATION p

I pahl SAFEGUARDS INFORMATION  ; o p