Forwards Supplemental Response to NRC 801208 Ltr Re Violations Noted in IE Insp Rept 50-458/80-12.Corrective Actions:Instructed All Personnel to Check All Tickets Prior to Load Concrete Discharge for Max Water Allowed
ML20003E822
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/11/1981
From: Draper E
GULF STATES UTILITIES CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20003E819 List:
References
RBG-9871, NUDOCS 8104100654
Download: ML20003E822 (2)


Text

.

0-GULF STATES UTILITIES COMPAAY WQ POST O F F I C E a O x 2 9 51

  • BEAUMONT. TEXAS 777o4 AREA C O D E 713 838 6631 March 11, 1981 RBG-9871 File Nos. G9.5, G15.4.1 Mr. W.C. Seidle, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Commission Region IV Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Dear Mr. Seidle:

River Bend Station-Unit I Reference to: RIV Docket No. 50-458/Rpt. 80-12 As a result of the Monday, February 2, 1981 meeting with Messrs. Tom Crouse of GSU, Ray Hall, Bill Beach and Joe Tapia of the NRC, and Craig Lundin of S&W, we are providing the additional information, attached herein, as requested.

We trust this information satisfactorily answers the concerns raised in Inspection Report 80-12. We shall be glad to discuss any further concerns you may have.

Sincerely,

k. -

E. L. Draper, .

Vice President-Nuclear Technology Attachment RJK/scs (810.410 0[AfY

a W .

?

Attachment ITEM A COMMENTS:

Please add the following paragraph to the response provided under the Notice _of Violation, Item A: ACTION TAKEN AND RESULTS ACHIEVED.

S&W FQC has instructed all concrete inspectors to assure lighting in concrete placements is adequate to assure proper placement and inspection, and to immediately contact their supervisors if problems with securing addit: 2nal lighting are encountered.

ITEM B COMMENTS:

The aggregate water quantity of 728 lbs. shown on batch ticket no.

14335 is slightly higher than actual quantity of 706 lbs., because it is calculated by the batch plant computer as the moisture content times the quantity batched, rather than moisture content times the dry weight of the quantity batched. Thus by calculating more water than is actually added at the plant, the calculated allowable water is lower than actual. This practice provides for a small safety factor to help prevent exceeding the water cement ratio when the amount of-water added exceeds the apparent amount withheld as in this case.

Action Taken To Prevent Further Violations:

FQC Personnel have been instructed to check all tickets prior to discharge of the load of concrete for maximum water allowed. No load will be discharged until this is done. If maximum water is exceeded, the load will be rejected immediately.