ML19345C036
| ML19345C036 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/19/1980 |
| From: | Draper E GULF STATES UTILITIES CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| IEB-80-20, RGB-8628, NUDOCS 8012030783 | |
| Download: ML19345C036 (1) | |
Text
/
i
.,m /
~
T/t GUIsF STATES UTILITIES COMPANY
=as
- ==i: E sa<:qsm. s e 4
.4 :,-
as 3 -- : 4 J. P E a OOCE ?: 3 634-3443 B
.=
September 19, 1980
[]
RBG - 8628
-~
N File G9.5 1-gg g
Fi V
_j Mr. I'.arl V. Seyfrit, Director U.S. Nuclear Regulator-/ Commission Region IV, Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011
Dear Mr. Seyfrit:
River Bend Station - Units 1 & 2 Refer to: RIV Docket Nos. 50-458/I&E Bulletin 80-20 50-459/I&E Bulletin 80-20 The subject Westinghouse Type W-2 control switches with spring return to neutral position are not used in safety-related applications at our River Bend facility. The switches are not specified in our A/E's (Stone & Webster) or NSSS Vendor's (General Electric),, cope of supply.
Your request for an estimate of the manpower expended in conduct of the review and preparation of the response required is estimated at 50 manhours.
This includes the manpower expended by Gulf States Utilities (Gb'I), GE, and S&W to prepare this response.
This completes our response to I&E Bulletin 80-20.
Sincerely,
[.
fQ E. Linn Draper, Jr.
Vice President - Technology FLD/RJK/mb cc: Director, Division of Reactor Operations Inspections Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 so120s 793