ML19347A727

From kanterella
Jump to navigation Jump to search
Submits Response to IE Bulletin 80-16.No Rosemount Model 1151 or 1152 Pressure Transmitters Are to Be Used in safety-related Applications
ML19347A727
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 09/05/1980
From: Draper E
GULF STATES UTILITIES CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-80-16, RBG-8464, NUDOCS 8009300086
Download: ML19347A727 (2)


Text

. .

~

7' / C-GULF STATES UTILITIES COMPANY a e s r c w,:e s x 29s asauvcs- ax4s--: 4 Am=a cOcE 713 638-3843 September 5, 1980 RBG - 8464 Files G9.5, G9.33.1 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory. Commission Region IV Office of Inspection & Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011

Dear Mr. Seyfrit:

River Bend Station - Units 1 & 2 Refer to: RIV Docket Nos. 50-458/I&E Bulletin 80-16 50-459/I&E Bulletin 80-16 In response to the reference Bulletin, " Potential Missappli-cation of Rosemount Incorporated Models 1151 and 1152 Pressure Transmitters with either 'A' or 'D' Output Codes", the following is provided:

Item 1. Determine if your facility has installed or plans to install Rosemount Inc. Model 1151 or 1152 pressure transmitters with output codes 'A' or 'D' in any safety-related application.

Response. No Rosemount Model 1151 or 1152 pressure transmitters are to be used in safety-related applications for the l Stone & Webster (A/E) scope of work. Preliminary {

investigations of General Electric also indicate that no Rosemount Model 1151 or 1352 pressure transmitters I with 'A' or 'D' output codes are to be used in I safety-related applications in their scope of supply.

This investigation will continue for the GE scope of supply and we intend to report the final results to you by October 6, 1980.

Items 2 and 3 are not applicable to River Bend Station.

8009800 U

. 'Mr. Karl V. S yfrit. Director S:ptember 5, 1980 pcg2: 2 Your request for an estimate of the manpower expended in con-

, duct of the review and preparation of the response required will be addressed in our final submittal regarding this Bulletin.

Sincerely, f '

q, E. L. Draper. Jr.

Vice President - Technology ELD /bR/mb cc: U.S. Nuclear Regulatory Connission Office of Inspection & Enforcement Division of Reactor Construction Inspection Washington, D.C. 20555 l

l l

l

.. .,