RBG-22166, Forwards Addl Info Re Notice of Violation Contained in Insp Rept 50-458/85-43.Chronology of Events Listed.Psar Change Submitted by S&W Approved

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Re Notice of Violation Contained in Insp Rept 50-458/85-43.Chronology of Events Listed.Psar Change Submitted by S&W Approved
ML20209H404
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/27/1985
From: Booker J
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20209H401 List:
References
RBG-22166, NUDOCS 8511110110
Download: ML20209H404 (10)


Text

u,. . - --. .-- .. . . ~ . .~ . . - - - - - - - - .-

g.

^'~y O'

  • s.

GULF STATES UTILITIES COMPANY

~ P O S T O F F I C E B O X 2 9 51 . BEAUMONT. TEXAS 77704 i ,AREACoDE 409 838-0631 3 September 27, 1985 RBG- 22166 File Nos. G9.5, G15.4.1 j

~Mr. Robert D. Martin, Regional Administrator

' U.S.' Nuclear Regulatory Commission __

4

Region IV 611 Ryan Plaza Drive, Suite 1000

~

ag g g' 3

{!

Arlington, Texas 76011  !

' . , l oct - 3 9EEi i -

Dear Mr. Martin:

{

River Ben'd Station - Unit 1 Refer.to: - Region IV- ,

Docket No.-50-458/ Report 85-43

. This letter is~lin response ;to -the September 10, 1985 request for additional information concerning the Notice of Violatirn contained in. NRC

.I&E ' Inspection; Report No.'50-458/85-43. Please find below a chronology of events which occurred prior to March"11, 1983.

b On Novembr 15, 1982, PSAR Change Request 17.1A-4 (applicable pages are attached) was distributed = by GSU for. review. On page. 17.1-9,'

revisions to Section 17.1.2.4A modified the review frequency from yearly-7

. to. once every two years. On December 23, 1982, GSU provided these revisions,.via letter number RBG-14016, to' Stone and Webster Engineering Corporation T(SWEC) for incorporation of this revision and other revisions into Chapter 17 of the PSAR. Also on December 23, 1982, (NL-82-152) GSU made- internal distribution .: .of1 =these PSAR Chapter 17 changes in

. anticipation of the PSAR change notice approved by SWEC. On March 9,

". 1983, SWEC submitted the approved PSAR Change Notice SW17.1-10. This-approval provided the final required concurrence and completed the process for PSAR revisions. Therefore~, GSU believes this revision to be in compliance with 10CFR50.55(f).

If there are any questions concerning this response, please call Brit Hey

- Nuclear Licensing at.(504) 635-6995.

s Sincerely,

~'

. r. M J. E. Booker Manager-Engineering,

  • Nuclear Fuels & Licensing-River Bend Nuclear Group M G/BEH/amg
Attachment 8511110110 85 58 ADOCK O PDR PDR
Q- \ Va

,' ROUTE SHEET AND REVIEW FORM FOR LICENSING DOCUMENTS RIVER BEND STATION Licensing Document hbh k b kp46' QRf5+ l). f M ~ "f

~ v Affected Section l7. J A - GSM f.anstep.c.klew SA Eroa e-m Date Ii- t5 - 2 A 9

Revision b or New Draft O (Freliminary or rina1 E ) -

Reviewer (1) M @ o o k E P Reviewer (6) P E FreekA\

Reviewer (2) /).'I Reed ER Grant' Reviewer (7) Al F Cummkox 4

Reviewer (3) T O b te w s e Reviewer (8) S Y kins Reviewer (4) b N hedff Reviewer (9)

,. Reviewer (5) O N h r se.n6 Reviewer (10)

Return this form and comments to Edd te ' E Gru+. ,/EP-a by 11 81 Reviewer emphasis should be provided as indicated below.

/Q Conformance with current licensing documents and positions g Conformance with NRC guidance (e.g., Regulatory Guides and NUREGs) 3,4 C nf rmance with Engineering documents (e.g., specifications) 5,lo,'? Confomance with procedures and operational experience g Conformance with Ouality Assurance procedures and requirements For information only; no action required NOTE: Comments cre requested to be provided as corrections marked in the draf t in red ink, with bases for the corrections provided separately. Quest. tons, or comments without bases, will be pursued according to schedule restraints. .

To be completed by reviewer.

There are: Comments attached No comments Signature Date _

y .#'

RBS - 1&2 PSAR Reporting of Significant Deficiencies Corrective Action Analysis Initiation of Site Stop Work Action QAP 17 Preparation, Collection, Storage and Maintenance of QA Records Quality Assurance Records List Quality Assurance Records File QAP 18_

Audit Planning and Scheduling Qualification and Training of Auditors Management Review of QA GSU Internal Audits

  • Contractor Audits Vendor Audits -

Audit Reports Follow-up and Close-out of Audit Reports

} The NQAM is considered by GSU to be a working document and the general content'as shown above is subject to continual revision and change.

% -w The NQAM is prepared by the QA Department. Concurren.e with each section is obtained from the appropriate department manager or I \ supervisor. The NQAM is approved by the Director-QA and the Senior D Vice President-RBNG. All revisions to the NQAM undergo the same review and. approval process. . .

QA program requirements for startup testing and operations "4'l be enXt, described in the FSAR, =ici: n.

k.

( 17.1.2.3A Project Procedures i

] t The review, spproval, release, distribution and revision of design

,, g documents are accomplished in accordance with the GSU River Bend

, Project Procedures Manual. Similar procedural systems exist in S&W and 3 GE. Interface activity or coordination is effected by GSU concurrence of applicable GE and S&W procedures.

17.1.2.4A Yearly Review of Controlled Documents k GSU e444({ ave a ye revie 11 controlled documents which they -

issue, including the Nuclear Quality Assurance ManualE Measures are ~ .!

D f

~

established to assure that documents are reviewed for adequacy and approved for release by authorized personnel and are distributed and used at locations where the activity is being performed. Quality l f g k ((-

k% tN

/

G t April'1982 17.1-9 PSAR CN

. t ..

r -

GULF STATES UTILITIES COMPANY P O S T O F FIC E B O X 2951 . B E A t.! M O N T . TEXAS 77704 AREA CODE 713 838 6631 December 23, 1982 RBG-14,016 S- 7,060 RESPONSE REQUIRED BY:

January 31, 1983 Mr. B. G. Schultz, Project Manager River Bend Project Stone & k'ebster Engineering Corporation P. O. Box 5200 Cherry Hill, New Jersey 08034 Attention: Mr. J. A. Kirkebo Gentlemet.

o File C'de G9.7.2 PSAR Correspondence River Bend Station-Units 1&2 Attached are marked up pages of the RBS PSAR Construction QA Program (Chapter 17.1) which represent requested changes. ,

Please incorporate these into your PSAR Change Notice review procedure for proper disposition.

Sincerely, J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Project JEB/b/kt Attachment

n

, M 8.,

.e k)

, E..<

\

J.t Y j

/gp* Reporting of Significant Deficiencies

  • T.M' Corrective Action Analysis Initiation of Site Stop Work Action

%jC~.

g 1 QAP 17

  • i .

Preparation, Collectior, Storage and Maintenance of QA Records f., ; , s Quality Assurance Records List '  ;

Quality Assurance Records File -

1

,$.: " / i 1

....V_ .. ,

QAP 18 ^ '

-h .

Q< u . Q Audit Planning and Scheduling  :. -~;lk'{'.h.

'>/ --

~

.g('a $2 Qualification and Training of Auditors .-

> : - win r..

Eyf Management Review of QA

'Q s3 GSU Internal Audits QO- Contractor Audits ' '

~

.p. g. h Vendor Audits - '

v

., a;p 4O Audit Reports

.k ' " I A. Follow-up and Close-out of Audit Reports .

r .,

$% -~~:$e.r.

fts. "Q d

  • The NQAM is considered by GSU to be a working document and the general JM V:r e e
y h content'as shown above is subject to continual revision and change. ~~

-l ,((

5 y The NQAM is prepared by the QA Department. Concurrence with each .'

M. so section is obtained from the appropriate department manager or

~

.y {T supervisor. The NQAM is approved by the Director-QA and the Senior - , .bdl.YM; a,1;

. - s. .d 3g Vice President-RBNG. All revisions to the NQAM undergo the same review 0%W 9- and approval precess. WJ gif.ggl','

3.

E o 22 ,

. s.-W:".-

, ...z .G *

.a '

_;," O , p. ty QA program requirements for startup testing and operations ;ill h e*5 6 '

g b.5 9" T -f. described in the FSAR. edrit :1. '

I,i.. '

v. .

.:B.}- } 4

." ". '. - ; W -'

.a a .'i

  • A.. ..'

g4 , . s.{,0> 17.1.2.3A Prolect Procedures

,; . '1.: .- M M.-

.. ,. 4 , gg The review, approval, release, distribution and revision of design '

f llt

  • e e documents are accomplished in accordance with the GSU River Bend ' N

7.R.IYk Project Procedures' Manual. Similar procedural systems exist in S&W and M-i[iW

'2;k.Iyp GE. Interface activity or coordination is effected by GSU concurrence " M n.

' of applicable GE and S&W procedures,

?%$

$< 2*U revery bo years. %er

Nd Td 17.1.2.4A Yearly Review of Controlled Documents revisses$ fa hest daeweOS me Q .y consfifn+e Wss tevW8*1.

Rf.

.$' h'!D. ' GSU N reviewsg all controlled documents which they] 'N Y-issue, including the Nuclear Quality Assurance Manual,T Measures are

-h';y-

'I established to assure that documents are reviewed for adequacy and .. .' '7/!

approved for release by authorized personnel and are distributed and .

used at locations where the activity is being performed. Quality  ;

April 1982 17.1-9 PSAR CN u , . .

be

., ,r e; .cs i-e '. h,' l.b <. k ' , I W:

w.- ,.. *'  : - N. ? * '- '

  • S Yf ~. :.l *l.; W '50 *:.

.f, .

. .:,, em-.. +.m

t. w h = a n , . _

\ t'". = 2-

.I .

MEM0RANDUM s ,; :- - ,y W j g-

~

!::ii.. ,': , , 2 / [/ I  :

TO: Distribution December 23, 1982 F30ft: Nuclear Licensing

SUBJECT:

Construction QA Program -

Attached is the latest revision of the Construction QA Program for River Bend Station. This document has been prapared by incorporating the approved PSAR Change Notices into PSAR Section 17.1.

Distribution and revision of this document is the responsibility of l Nuclear Licensing. Please contact Eddie R. Grant at 733-2313 if you have any questions or comments.

hok E.&n staa.

N die R. Grant Licensing Coordination ERG /kt Distribution: P. D. Graham E. L. Hammond

, J. G. Weigand W. F. Cummings j J. H. Curless J. 5. Booker -

T. C. Creuse W. J. Reed V. J. Normand L. A. En;.ind M. E. Valton- L. L. Di . rich /5&W C. W. Lambert H. D. Po.4Ll/GE P. E. creehill NL-32-13; 14uclear CocJment Control SEp 3 1965

- - - - , - - - - , - , , - , - - - - ,. w

y , - - -

I* ... ** ~ 2 RBS - 1&2 PSAR

'\

Reporting' of Significant Deficiencies Corrective A: tion Analysis Initiatha of' Site Stop Work Action QAP 17 '

Preparation, Collection, Storage and Maintenance of QA Records Quality Assurance Records List Quality Assurance Records File QAP 18 Audit Planning and Scheduling Qualification and Training of Auditors Mana.3ement Review of QA GSU Internal Audits Contractor Audits Vendor Audits Audit Reports Follow-up and Close-out of Audit Reports The NQAM is considered by GSU to be a working document and the general content as shown above is subject to continual revision and change.

The NQAM is prepared by the QA Department. Concurrence with each section is obtained from the appropriate department manager or supervisor. The SQAM is approved by the Director-QA and the Senior Vice President-RBSG. All revisions to the SQAM .ndergo the same review and approval process.

QA program requirements for startup testing and ;perations are described in the FSAR. , .

17.1.2.3A Project Procedures The review, approval, release, distribution,and revision of design documents are accomplished in accordance wit,h the .GSU River Bend -

Project Procedures Manual. Similar procedural systems exist in S&W and GE.

Interface activity or coordination is effected by GSU concurrence of applicable GE and S&W procedures.

The NQAM requirements affecting QA Department activities are -

implemented by Nuclear Quality Assurad.e Program Incuments (NQAPD's),

which are approved by the Director-QA.'

17.1.2.44 Yearly Review of Controlled Documents GSU reviews all controlled documents which they issue, including the Nuclear Quality Assurance Manual, every two years. Major revisions to

~

Datember'1982 17.1-9

\ PSAR CN l

l e

f

  • 4 .
  • STONE E.WESSTER~ ENGINEERING CORPORATION ' -

LICENSING DOCUMENT CHANGE REQUESTFORM .

45no.5

'~

b. -

PROJECT  %, r .Fenel REQUEST. NO. 50 31,1-lo CLIENT #* S u '

JO. NO. l2 2i o REVISION ORIGINATOR: LL IndNch fic.emIwe DATE: A 3 R M f'2-7.' ., -(TITLE ) '

(STAFF GROUP /DisCAPLINE) 12 ANT LDE LL Nefri~ck k

~

I 'd OcH, IW2. i (NAME) (slGN & DATE)

LEAD, LICENSING ENGINEER: L L hie. dock -

, (NAME) -

LICENSING DOCUMENT (S) AFFECTED: .

T5AR See b 'll 1 ,

. REASON (S) FOR PROPOSED CHANGE:  :

osu..,= & t. 4. cows. lid.6 all 7 m a b M '" U ^^ i:

. h g,%. ~ su+f - n.1 '; l a

(

' DESCRIPTION OF PROPOSED CHANGE (ABSTRACT):

see. of{uckad , reduu0 S M 17.!

1 ATTACH CHANGE IN FINAL LICENSING DOCUMENT FORM. PAGES ATTACHED I EVALUATION OF PROPOSED CHANGE -INITIAL UNDER CHANGE CATEGORY EVALUATION MINOR MAJOR SUBSTANTIAL (LIST) l LDE (!) T W k )W -

a I Ysm% n .

FA Cawo tLE o t. we.Md.

.P E NOTED NAR 0 0 1983 v.s.ce

. L)&CJp ,

% ~

ADDITIONAL COMMENTS (ATTACH ADDITION hSNkNTUlf'NECESSARY):

i i l

.__._-___-..._.___--_a. - . _ - . . . _ . _ - - _ . _ - .

, , 9. ' \ '

RBS - 1&2 PSAR ,

l Reporting of Significant Deficiencies

[.. .

Corrective Action Analysis Initiation of Site Stop Work Action QAP 17' -

Prep'aration, Collection,' Storage and Maintenance of QA Records -

.,.( Quality Assurance Records List

./ -* Quality Assurance Records File

  • QAP 18 .. 4 Audit Planning and Scheduling '

. Qualification and Training of Auditors -

1 Management Review of QA

  • GSU Internal Audits

. Contractor Audits

! Vendor' Audits AuditReborts ,;

Follow up and Close-out of Audit Reports '$

The NQAM is considered by GSU to be a- working document ud the general content as shown above is subject to continual revision and' change. ,[

The NQAM is prepared by the QA Department. Concurrence with each section is obtained from the appropriate department manager or

  • supervisor. The NQAM is approved by the. Director-QA and the Senior

. Vice President-RSNG. All revisions to the SQA'1 undergo the same review '

and approvar process.

QA program requirements for startup testing and operations are , ,

described in the FSAR.

17.1.2.3A Proiect Procedures The revief'l approval, release, distribution and revision of design

~

documents are, accomplished in accordance with the GSU River Bend Sutc Project Procedures Manual. Similar procedural systems exist in & and GE.. Interface activity or coordination is effected by GSU concurrence of applicable GE and @ procedures.

S w s c-The NQAM requirements affecting QA Department activities are implemented by Nuclear Quality Assurance Program Documents (NQAPD's),

which are approved by the Director-QA.

IkAodic 17.1.2.4A " -. '. . Review of Controlled Docurents GSU reviews all controlled documents which they issu neluding the Nuclear Quality Assuranc'e Manual, every t o years. ,N to .

. gc.v is iea s F

December 1982 17.1-9 PSAR CN s /

vt M n

v.y , -

RBS - 1&2 PSAR ,

'these documents may constitute this review. Measures are established b' to assure that documents are reviewed for adequacy and approved for release by authorized personnel and are distributed and used at locations where the activity is being performed. QualityAssurance,)=l-fk-k.Jw*

, Project Engineering, f.icensing, and Administrative Services participate in this review af, applicolole .

3 17.1.2.5A Fuel QA Program GSU, as the plant owner, retains the responsibility for the quality of the nuclearsfuel. GSU performs an overall audit and review of the GE Fuel QA Program. GSU may use consultants, as required, in preparation of the nuclear fuel contract, contract negotiations, and in preparation .

of a technical evaluation of fuel design, and an initial audit of the GE nuclear fuel quality system. GSU may use consultants to further assist in evaluation of fuel design, recommended quality program

, changes and a system of detail audits during the fabrication cycle.

GSU provides instructions for receipt inspection, handling, and storage of the nuclear fuel. -

GE performs the first level quality program, consistent with the requirements of 10CFR50, Appendix B for design and fabrication of the ,

nuclear fuel, to assure the mechanical integrity of the fuel over' its 2 anticipated lifetime. The GE fuel design and quality inspections requirements are discussed in Chapter 4. ,

-i GSU maintains the right to conduct special tests, in addition to GE's QC inspection requirements , during the fuel fabrication phase. Special .

tests to be performed are established prior to fuel fabrications based on the state of the art and current industry problems. p k

GSU Fuel QA Program requirements are delineated in the GSU NQ " nel CC AM os AFF h f

17.1.2.6A QA Training i

The Directo'r-Quality Assurance must have as a minimum five years in charge of responsible assignments in the design, construction, or operation of a pcwer plant. He draws upon this experience in handling technical problems and perstinnel relations, as they arise. Initially, he familiarises hi=self with the GSU QA' manuals and policies to more adequr_tely understand the overall program. He familiarizes hi=self with codes, standards, and regulatory requirements, related to quality assurance and to nuclear power plants in general. He participates in

\ all phases of the audit program, including preparation of inspection f plans, conduct of audits, and writing of summary audit reports.

6r"

  • g GSU maintains a reading list to monitor QA employees' progress in ,

g g bt acquainting themselves with regulatory standards, codes, GSU QA ~

manuals, technical descriptions, and other related project literature.

1 y

Jg\/

fp7, e 17.1-10 PSAR CN December 1982

  • -