RBG-26189, Submits Suppl Response to Re Violations Noted in Insp Rept 50-458/85-31.Commitment to Revise Surveillance Test Procedures to Incorporate Mods to Integrated Leak Rate Test Procedure 1-PT-57-1 Scheduled for Completion by 871231

From kanterella
Jump to navigation Jump to search
Submits Suppl Response to Re Violations Noted in Insp Rept 50-458/85-31.Commitment to Revise Surveillance Test Procedures to Incorporate Mods to Integrated Leak Rate Test Procedure 1-PT-57-1 Scheduled for Completion by 871231
ML20235B341
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/30/1987
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RBG-26189, NUDOCS 8707090027
Download: ML20235B341 (1)


Text

)

GULF STATES UTILITIES COMPANY RfVER BEND $TATION POST OFFICE BOX 220 St FRANCISvtLLE. LOUISIANA 70775 AREA CODE 504 636 6094 346 8651 June 30, 1987 RBG-26189 File Nos. G9.5, G15.4.1 U. S. Nuclear Regulatory Commission Document Control Desk WashinEton, D. C. 20555 Centleuen:

River Bend Station - Unit 1 Refer to: Region IV Docket No. 50-438/ Report 85-31 This response supplements Gulf States Utilities Compt.ny's (GSU) letter dated September 2, 1985, concerning the Notice of Violation contained in NRC Inspection Report No. 50-458/85-31.

GSU had previously comnitted to revise surveillance test procedures ~(STP) by December 31, 1986 to incorporate changes made to the Integrated Leak Rate Test (ILRT) procedure 1-PT-57-1.

The next performance of this STP is scheduled during the second refueling outage, therefore GSU is scheduling completion of this commitment by December 31, 1987.

Sincerely, s $ bf J. E. Booker

!Snager-River Bend Oversight River Bend Nuclear Group 10 AJK/RR es cc: Mr. Robert D. Martin, Regional Administrator U. S.' Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 ,

Arlington, TX 76011 l NRC Resident Inspector P. O. Box 1051 St. Francisv111e, LA 70775 pr$88n8Mjk G

V i