Suppls Response to NRC Re Violations Noted in Insp Rept 50-458/86-16.Corrective Action:General Maint Procedure GMP-0092 Being Developed as Alternative to Torque Wrench Program
ML20207E823
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/07/1986
From: William Cahill
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20207E797 List:
References
RBG-23964, NUDOCS 8607220433
Download: ML20207E823 (4)


Text

_- - __ ____ - _____ - __-_ _______ _

.4' y

GULF STATES UTILITIES COMPANY (Sh RIVER BENQ STATION POST OFFICE BOX 220 ST. FRANCISVILLE. LOUISIANA 70775 AREA CODE 504 635 6094 346 8651 July 7, 1986 RBG- 23964 File Nos. G9.5, G15.4.1 Mr. Robert D. Martin, Regional Adn.inistrator U.S. Nuclear Regulatory Commission @

Region IV 611 Ryan Plaza Drive, Suite 100

[bbb Arlington, TX 76011 10IE lh l ILY

Dear Mr. Martin:

River Bend Station - Unit 1 Refer to: Region IV Docket No. 50-458/ Report 86-16 This supplemental letter responds to your letter dated June 13, 1986 on the Notice of Violation contained in NRC Inspection Report No. 50-458/86-16. The inspection was performed by Mr.

Michael E. Skow during the period March 31 through April 4, 1986 of activities authorized by NRC Operating License NPF-47 for River Bend Station - Unit 1.

Gulf States Utilities Company's (GSU) supplemental response to Notice of Violation 86-16-01, " Failure to Have Adequate Procedures", is provided in the enclosed attachment. This completes GSU's response to the Notice of Violation.

Sincerely,

/, /

/ . J. Cahill Jr.

Senior Vice President River Bend Nuclear Group Attachment 8607220433 860716 PDR ADOCK 05000458 G PDR r c -13 7 f<

UNITED STATES OF AIERICA NUCLEAR REGUIATORY CGalISSION STATE OF IAUISIANA 5 PARISE OF WEST FELICIANA 5 .

In the Matter of I Docket Nos. 50-458 GULF STATES UfILITIES CGIFARY l (River Bend Station, Unit 1)

AFFIDAVIT W. J. Cahill, Jr., being duly sworn, states that he is a Senior Vice President of Gulf States Utilities Company that he is authorized on the part of said Company to sign and file with the Nuclear Rggulatory Cosssis sion the documents attached hereto and that all such documents are true and correct to the best of his knowledge, information and belief.

/ ,

J.Cahill,Jr/

Subscribed and sworn to before me, a Notary Public in and for the State and Parish above named, this 7#6 day of (1/, e , 19 K .

h- - e d Joan W. Middlebr'oo$s Notary Public in and for West Feliciana Parish, Louisiana My Commission is for Life.

r-,

ATTACHMENT RESPONSE TO NOTICE OF VIOLATION 50-458/8616 LEVEL IV Reference Notice of Violation - J. E. Gagliardo to W. J. Cahill, Jr. dated May 1, 1986.

Request For Additional Information - J. E. Gagliardo letter to W. J.

Cahill, Jr. dated June 13, 1986.

A. FAILURE TO HAVE ADEOUATE PROCEDURES REASON FOR THE VIOLATION On March 25, 1986, in Memorandum No. PMG-M-86-62, the Plant Staff Maintenance Department removed torque wrenches from the controls of Administrative Procedure ADM-0029, " Control cf Measuring and Test Equipment (M&TE)", and provided new instructions for controlling torque wrenches. These program changes were made to provide controls for more reliable torque wrench calibrations by requiring the torque wrenches to have a calibration check before and after each use on plant equipment. The new program also expedited the process of issuing torque wrenches to Maintenance personnel. The M&TE device used to check the torque wrench calibrations remained under the control of ADM-0029. The new instructions also continued the use of M&TE Tracking Cards, as required by ADM-0029. Although the memorandum, issued on March 25, 1986, did establish controls for using torque wrenches at River Bend Station, the failure to implement an approved procedure in accordance with the requirements of ADM-0003 resulted in an apparent violation of Technical Specification Section 6.8.1.

CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED The new program, as described in Memorandum No. PMG-M-86-62, was discontinued on March 27, 1986 when the torque wrench calibration check. device was relocated from the resulted Maintenance Shop to the Site Standards Laboratory. This change from the device's calibration having been suspected as out of tolerance. When returned to the Standards Laboratory, the device's calibration was confirmed to be out of tolerance by a 1.4 percent error for readings above 225 ft-lbs when used in the counter clockwise direction. A review of the M&TE Tracking Cards for the torque wrenches used during the 3 days of the new program, revealed that the torque wrenches in question were not used in the counter clockwise direction or in the ranges found out of tolerance.

Therefore, all torque wrench applications during this period were acceptable.

As a result of the calibration check device being removed from service on March 27, 1986, subsequent torque wrenches issued were required to be performed in accordance with the controls of ADM-0029. To ensure compliance with ADM-0029, Memorandum No.

APM-M-86-59 was issued on April 2, 1986 rescinding the new program described in Memorandum No. PMG-M-86-62, dated March 25, 1986.

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS The responsible Plant Staff Maintenance personnel are aware of the requirements of ADM-0003. A review of memorandums issued by the Maintenance Department was performed. It was determined that memorandums are not used in lieu of approved procedures to provide technical guidance or control maintenance activities. Using memoranda in place of approved procedures is not standard practice at River Bend Stati'on. General Maintenance Procedure, GMP-0092 is presently being developed as an alternative to the torque wrench program described in ADM-0029. The procedure will meet the intent of the program described in Memorandum No. PMG-M-86-62 and establish approved instructions for the calibration and control of torque wrenches. The approval of GMP-0092 is presently pending-the receipt of a newly purchased torque wrench calibration check device. Torque wrenches will remain under the controls of approved procedure ADM-0029 until GMP-0092 is approved and issued.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance with the requirements of ADM-0029 was achieved on March 27, 1986 after the relocation of the torque wrench calibration check device.