Suppls 890411 Response to Violations Noted in Insp Rept 50-458/86-04.Operations QC Instructed QC Planners & Lead Inspector to Include Hold Point of Electrical Maint Work Request for Category I Electrical Equipment Panels
ML20012F155
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/28/1990
From: Odell W
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBG-32575, NUDOCS 9004100229
Download: ML20012F155 (2)


Text

'

.. o GULF STATES UTILITfEG COMPANY nunm m w ,2 eo n ,m r u n, n enmasmaac.umiwn Afil A LODt IJh4 f.ih ROM 346 W41 March 28 ,1990 RBG-32575 File No G9.5, G15.4.1, G9.16 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

River Bend Station - Unit 1 Refer to : Region IV Docket No. 50-458/ Report 86-04 This letter supplements Gulf States Utilities Company's (GSU)

April 11, 1986 response to the Notice of Violation contained in Inspection Report No. 50-458/8604-01, " Failure to Administratively Control Temporary Circuit Alterations." To correct the unauthorized use stated: "As of January 7, 1986, Operations Qualityof lifted leads Control QC) and jumpers,(GS has instructed QC Planners and Lead Inspectors to include a hold point on Electrical Maintenance Work Requests for Category I Electrical Equipment Panels. This will allow for inspection upon completion of work for ' lifted leads, jumpers, cleanliness, proper termination and separation'." ,

A review of maintenance history and QC Inspection Reports since revising Operations Quality Procedures and Instructions (QCI)-3.7, " Quality Control Inspection Planning", which includes a section describing the use of the QC Planning Review Checklist to establish QC Hold Points where required or applicable, and General Maintenance Procedure (GMP)-0042, " Circuit Testing and Lifted Leads and Jumpers", which requires the use of serialized tagging to provide better control and accountability for lifted leads and jumpers, has shown a steady decline in the number of unsatisfactory conditions noted by QC, GSU is confident that this trend will continue. GSU is modifying instructions for QC inspections of electrical equipment panels as stated below.

" Quality Control, on a quarterly basis, will conduct a random sampling of all accessible control room panels during normal I

plant operation. Additionally, a random sampling of Q-Class l 1 electrical panels located in the power block will be l

conducted prior to plant start-up following any planned outage."

1 1

l0f$b5 0

0

c. ' .

c'"' This change will allow QC to identify any negative. trend, should  :

it occur'in the future. GSU believes that the corrective actions ['

included in the original . response to.the Notice of Violation along with this modified action will prevent recurrence of future i l violations.  ;

i i,

If you have any questions regarding this matter please contact Mr. David Lorfing at (504) 381-4157. .

Sincerel 4 i i

W. H. Odell Manager-River Bend Oversight ,

River Bend Nuclear Group WHO E/ /N/fbN/pg 1

cc: U. S. Nuclear Regulatory Contnission ,

Region IV ri on a bl ,

Senior- Resident ' Inspector ~ '

Post Office Box 1051 St. Francisville, LA 70775 t