RBG-27194, Updates Util 871007,0609 & 0814 Ltrs Re Activities in Support of First Refueling Outage.List of Current Identified Activities Requiring Action Encl

From kanterella
Jump to navigation Jump to search
Updates Util 871007,0609 & 0814 Ltrs Re Activities in Support of First Refueling Outage.List of Current Identified Activities Requiring Action Encl
ML20237E505
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/22/1987
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RBG-27194, NUDOCS 8712290034
Download: ML20237E505 (7)


Text

_ _ _ _ , _ . _ . _ _ _ - _ _ _ _

7-b e

GULF STATES UTELITIES COMPANY RIVE R BEND STATION POST OFFICE E DX 220 ..$7 FHANCISVILLE. LOul51ANA 70776 AREA CODE W.4 635 6094 346 8051 December 22, 1987 RBG - 27194 File No. G9.5 U. S. Nuclear Regulatory. Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

River Bend Station - Unit 1 Docket No. 50-458 This letter updates Gulf States Utilities Company's (GSU) October 7, 1987 (RBG-26757), June 9, 1987 (RBG-26068) and August 14, 1987 (RBG-26434) letters which responded to a letter from Mr. W. R. Butler, dated February 25, 1987, regarding activities in support of the River Bend Station '(RBS) first refueling outage. The enclosed attachment provides the current identified activities which require action to support the RBS first refueling outage. Other activities which are non-outage related are identified under Item III. This information is intended to be a comprehensive. listing of currently identified activities. Should additional activities require special attention prior to startup following the first refueling outage, GSU will promptly notify the PRC Staff RBS Project Manager.

Your efforts in support of previously completed activities and these upcoming activities is appreciated. If additional information is required, please contact Mr. Eddie R. Grant, Director-Nuclear Licensing, at (504) 381-4145.

Sincerely

,b D' J. E. Booker Manager-River Bend Oversight  !

River Bend Nuclear Group JEB/ ERG /RJK/ch p\ ,

Attachment

[\\

8712290034 871222 PDR ADOCK 05000458 p DCD

cc: U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 NRC Resident Manager Post Office Box 1051 St. Francisville, LA 70775 l

l l

l l-l l

l l 1 l

l 1

ATTACHMENT I. License Condition (LC) Items LC 2.C(1), Attachment 1, 3a - Crane Load Tests

- GSU provided package to NRC SRI on 12/7/87 with NRC verbal acceptance l

  • NRC to document acceptance post RF1 in Inspection Report j 1

, LC 2.C(1), Attachment 1, 4a - HVAC Chiller Control Valves ,

l

- CSU acceptance provided package to NRC SRI on 12/18/87 with NRC verbal acceptance i

  • NRC to document acceptance post RF1 in Inspection Report )

i LC 2.C(1), Attachment 1, 4b - Radio Communication l l

- GSU submittal dated 4/22/87 (RBG-25800)

- NRC discussion in IR 87-04 1

LC revision submitted 9/8/87 (RBG-26572) I I

- NRC SER issued '

LC 2.C(6) - Inservice Inspection Program l

- CSU's submittal dated 3/10/87 (REG-25452)

NRC SER issued l

LC 2.C(8) - TDI Diesel Engine LC revision submitted 9/8/87 (RBG-26571)

NRC SER issued LC 2.C(9) - Ultimate Heat Cink Temperature

- GSU's design submittal dated 6/29/87 (RBG-26184) l l

NRC SER issued with further action required 1

ATTACHMENT (continued)

- GSU Technical Specification Change submitted 11/13/87

  • NRC approval after RF1 LC 2.C(14), Attachment 5, Item 1, Human Engineering Discrepancies

- GSU's submittal dated 11/25/87 (RBG-27051)

LC 2.C(14), Attachment 5, Item 2, Regulatory Guide 1.97 LC revision submitted 8/5/87 (RBG-26395)

Support information submitted 8/24/87 (RBG-26501)

- NRC SER issued II. Technical Specifications (TS) Change Requests Core Reload Parameters Request submitted 8/13/87 (RBG-26444)

- NRC SER issued ATWS - Standby Liquid Control Request submitted 8/24/87 (RBC-26500)

NMC SER issued III. Other Programs (non-outage related)

Inservice Testing (IST) Relief Requests l

- GSU submittal dated 6/2/87

- NRC SER issued

- Onsite NRC meeting on 12/15/87

  • GSU new plan revision by 3/15/88 i

,

  • Items requiring additional action l

Page 2 of 5 E_ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - -

j

ATTACHMENT (continued)

Process Control Program (PCP)

- GSU revision submitted 7/16/87 (RBG-26274 and RBG-26673)

NRC SER issued Hydrogen Control GSU provided schedule on 10/15/87

Containment Purging

- CSU provided data on 10/30/87 Asiatic Clam Control Program

- Revision requested 8/31/87 (RBG-26545)

- NRC approval granted

  • Supplement by 12/31/87 Suppression Pool Pumpback

- GSU's submittal dated 9/10/86 (RBG-24358)

GSU's submittal dated 8/31/87 (RBG-26562)

  • NRC approval requested
  • Items requiring additional action Page 3 of 5

ATTACHMENT (continued)

Settlement Monitoring GSU's submittal dated 8/5/87 (RBG-26394)

  • NRC approval requested First Stage Turbine Pressure
  • GSU submittal by 1/30/88
  • NRC approval required Fire Protection (Generic Letter 86-10) l CSU's submittal dated 6/18/87 (RBG-26201)
  • GSU's supplement by 1/30/88 1
  • NRC approval required l

l l

Diesel Generator Action Statement

- CSU's submittal dated 8/7/87 (RBG-26408)

  • NRC approval requested Administrative Controls GSU submittal dated 6/18/87 l

GSU supplement provided on 10/15/87 NRC SER issued Engineering Expertise On-shift Request submitted 6/18/87 (RBG-26202)

NRC SER issued

  • Items requiring additional action Page 4 of 5

ATTACHMENT (continued)

Main Steam Line Area Temperature

- GSU's submittal dated 6/05/87 (RBG-26059)

  • NRC approval requested Drywell Average Temperature

- CSU's submittal dated 6/05/87 (RBG-26059)

  • NRC approval requested Leak Detection Isolation Actuation Instrumentation (RWCU) l GSU's submittal dated 6/18/87 (RBG-26202)
  • NRC approval requested Main Steam Tunnel Temperature Monitoring GSU's submittal dated 6/5/87 (RBG-26059)
  • NRC approval requested l

l Instrument Setpoint Methodology Report GSU's submittal dated 7/8/87 (RBG-26213)

  • NRC SER needed for generic program
  • GSU report 6 months post NRC Generic approval E0P Revisions (Flow Charts) with Staff l E0P's, Deviations, OSP's & Training I

Philosophy Changes held on 6/15/87

- GSU's submittal dated 12/15/87 SRV Testing

  • GSU's submittal by 2/29/88 l
  • NRC approval requested
  • Items requiring additional action Page 5 of 5

_ - _ - _ - _ _ - -