s 005 gogo 26d LPDR TIC NSIC #
CENTRAL FILES GULF STATES UTILITIES COMPANY post oFFtOE Box 2951 B E A V 'A O N *
- AS 77701 AREA coCE 713 938 663'.
April 7, 1980 R3G - Th63 File No. G9.5 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Conmission, Region IV Office of Inspection and Enforcement 611 Ryan Pla::a Drive Suite 1000 Arlington, TX 76011
Dear Mr. Seyfrit:
River Bena Station Unit 1 Docket No. 50 h58 As requested in your letter of December 13, 1979, enclosed are the five month results of the AST ( C227 mortar bar test for lov alkali (job cement) with both fi'_.e and coarse aggregates.
The five month results, recorded as an average length change percent, are +0.02 and +0.02 for fine and coarse aggre-gates respectively, are well within the acceptance limits cf
+0.05 for 3 month and +0.1 for 6 month test durations.
The 6 nonth (and final) results are scheduled to be com-pleted on April 10, 1980.
We vill forward them to you as soon as we receive them.
Sincerely, i
I
\\
,)b.
J: ^^
G. Weigand u.
Vice President Operations & Technical Systems JGW/JEB/WJR/mb Enclosures