Responds to IE Bulletin 79-14 Re as-built safety-related Piping Sys Seismic Analysis.Anticipates First Const Re Seismic Category I Piping Sys Will Begin in Spring 1980. Will Perform Requested Insp as Const Progresses
ML19260D621
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 11/15/1979
From: Weigand J
GULF STATES UTILITIES CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-14, NUDOCS 8002110514
Download: ML19260D621 (1)


Text

,

e

/YD GULF STATES UTILITIES COMPANY PO$T C*P ICE sox 2951 e 8EA UM ON T, T E X A S 77704 A RCA COOE 7 1 3 838 6 63 1 November 15, 1979 RBG - 6900 File G9.5 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission - ,

Region IV - $

611 Ryan Plaza Drive Suite 1000

' ~~'

Arlington, Texas 76011 _ . _ _ __ . . _ _ _ _ _ .

Dear Mr. Seyfrit:

River Bend Station - Units 1 & 2 Refer to: RIV Docket Nos. 50-458/I&E Bulletin 79-14 50-439/I&E Bulletin 79-14 Since the River Bend Station is in the initial phases of con; struction (i.e. approximately 6% complete), no seismic Category I piping systems have yet been installed in the field. Therefore, Gulf States cannot inspect the as-built piping systems as requested in the bulletin. It is anticipated that the first construction related to a seismic Category I piping system will begin sometime in late spring 1980. Gulf States therefore commits to perform and document the requested inspections as the construction of the Station progresses. Also, Gulf States will report the results of the inspec-tions to the Region IV Of fice of Inspection and Enforcement. It is presently anticipated that these inspections will be coordinated with start-up and testing of the systems whi:h will take place between November 1982 and June 1983.

Sincerely,

. G. Weiganu General Manager - Nuclear Projects WJR/sbp <-

cc: Office of Inspection a Enforcement

} h t]

Division of Operating Reactors

^

800g33q /