ML19305E708
| ML19305E708 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/07/1980 |
| From: | Weigand J GULF STATES UTILITIES CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19305E709 | List: |
| References | |
| RBG-7464, NUDOCS 8005200297 | |
| Download: ML19305E708 (1) | |
Text
PDR 800520 4 A1 LPDR nc -
NSlc r
CENTRAL FILES GULF STATES UTILITIES COMPANY POSTOFFICE 8 0 x 2 9 51 BEAUVONT TEXAS 77704 AREA OCOE 713 838 663i April 7, 1980 RBG - Th6h File No. G9 5 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Co-4ssion, Region IV Office of Inspection and Enforcement 611 Ryan Pla::a Drive Suite 1000 Arlington, TX 76011
Dear Mr. Seyfrit:
River Eend Station Unit 1 Docket No. 50 h58 As requested in your letter of December 13, 1979, enclosed are copies of Pittsburgh Testing Laboratory (PTL) Report numbers 800985 and SM986 for fine and coarse aggregates respectively.
Both reports show the five month results of the ASTM C227 mortar bar test being performed using high alkali cement samples.
The five moath results, recorded as an average length change percent, are +0.13 and +0.02 for fine and coarse aggregates respec-tively and are well within the acceptance limits of +0.05 for 3 month and +0.10 for 6 month test durations.
The 6 month (and final) results are scheduled for completion by April 19, 1980. We vill transmit them to you as soon as we receive them.
Sincerely, b
e_-
J G. Weigand t
Vice President Operations & Technical Systems JGW/JEB/WJR/mb Enclosures l
l
._