RBG-26434, Updates 870709 Response to NRC Re First Refueling Outage.Encl Attachments Provide Current Expected Schedules for Identified Activities Requiring NRC Action to Support Outage

From kanterella
Jump to navigation Jump to search
Updates 870709 Response to NRC Re First Refueling Outage.Encl Attachments Provide Current Expected Schedules for Identified Activities Requiring NRC Action to Support Outage
ML20237J530
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/14/1987
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RBG-26434, NUDOCS 8708180213
Download: ML20237J530 (7)


Text

,

.?

j e \

.fh i GULF STATES UTILITIES C'OMPANY RIVER Bf ND STAT 10N - POST OFFICE BOX 220

AREA CODE 604 635 60M4 346 8651 August 14, 1987 1

'RBG- 26434  ?

File No. C9.5.  !

l U.S. Nuclear Regulatory Commission

< 1 Document Control Desk j Washington, D.C. 20555 j 1

Gutlemen:

q River Bend Station - Unit 1 Docket No. 50-458 '

This letter updates Gulf States Utilities Company's (GSU) June 9,-1987 letter (RBG-26068) which responded to a letter from Mr. W. R. Butler, dated February 25, 1987, regarding activities in support of.the River Bend Station (RBS) first refueling outage. The enclosed attachments ]'

provide the current expected schedules for identified activities which i

require NRC staff action to support' the RBS first refueling outage.

This information is intended to be a comprehensive listing of currently identified activities. Should additional , activities require :special

);

attention prior to startup following the first refueling outage, GSU will promptly notify the NRC Staff RBS Project Manager.

Your efforts in support of the attached listing'of related activities is appreciated. If additional information is required,.please contact Mr.

Eddie R. Grant, Director - Nuclear Licensing, at (504) 381-4145. '

Sincerely, j

[Mk

[atJ.E.' Booker Manager-River Bend Oversight 0 River Bend' Nuclear Group {

d OV JEB/ ERG /RJK/ch

)

i Attachmeat i

~l l

8708180213 870814 /

PDR ADDCK 05000458 ( d.t.

p PDR -

.--_______-____--A

j'- .. ec. U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 NRC Resident Inspector P.O. Box 1051

'St. Francisville, LA 70775 l

l l

4

. ATTACHMENT i

I. License Condition (LC) Items LC 2.C(1) - Attachment 1 Item 2a, Fuel Bldg. Sampling System Complete Provided 5-20-87 Package to Region IV for review (IR 87-14)

  • Item 3a, Load Handling Capability Test Complete-Package to Region IV for review Provide During RF1
  • Item 4a, HVAC Chiller Control Valves Package to Region IV for review Provide During RF1
  • Item 4b, Verify adequate communications - Submitted 4-22-87 Package to Region IV for. review RBG-25800 (IR 87-04)

Provide additional information Submitted 4-22-87 l

l Region IV Meeting 7/21/87 License Amendment Request Submittal by 8/31/87 Need by end of RF1 LC 2.C(5)b - Mark III Containment Related Issues ---

Submitted to NRC via RBG-24131 on 7-31-86 SER Issued NRC Approval Needed by End of RF1 LC 2.C(6) - Inservice Inspection (ISI) Program Last Submittal to NRC via RBG-25452 on 3-10-87 NRC Approval Needed Need by 9-14-87

  • LC 2.C(8) - TDI Diesel Engine requirements ---

Last Submittal to NRC via RBG-24487 on 9-2o-86 NRC Approval Needed SER Issued Resubmit LC Revision for RF1 Submittal by 8 .11-87 LC 2.C(9) - Ultimate Heat Sink Temperature Monitoring Submittal for Staff Review Submitted 6-29-87 Need by end of RF1 Possible Tech. Spec, Revision To be determined I

  • Information to be provided by GSU.

ATTACHMENT (cont'd) l LC 2.D(14) - Attachment 5 Item 2 - R.G. 1.97 Neutron Flux Instrumentation Submitted 7-31-87 Delay to RF2 Need by end of RF1 .

)

l l I

i II. Technical Specification Change Requests and Other Activities A. Required to Support RF1

]

APRM Frequency SER Issued

RBC-25368 i j

Scram Discharge Volume Instrumentation Submitted 1-28-87 RBG-25277 i Supplement Required Submitted 4-16-87 l SER Issued I i

Drywell Bypass Leakage l 4

1. 4.0.2 Applicable SER Issued RBG-25278
2. Surveillance frequency Submitted 3-10-87 REG-25461 Need by 9-10-87  !

SER Issued SRV Accoustical Monitoring Submitted 3-10-87 REG-25461 Need by 9-1-87 Withdrawn 6-30-87 Leak Rate Testing Submitted 3-10-87 RBG-25461 Need by 8-3-87 SER Issued Hydrogen Mixing Submitted 3-10-87 RBG-25461 Need by 7-30-87 Withdrawn 6-30-87 ADS Submitted 3-18-87 RBG-25505 Need by 8-14-87 Withdrawn 6-30-87 Drywell Condensate Flow Monitor Submitted 3-18-87 RBG-25505 Need by 9-4-87 Withdrawn 6-30-87 Main Steam Line-H1 Rad Monitors Submitted 5-11-87 Need by 9-3-87 SER Issued

1 l

ATTACHMENT (cont'd) i Main Steam Line-Hi Flow Moniturs Submitted 5-15-87 Need by 8-21-87 SER Issued Reactor Water Low Level Instrumentation Submitted 5-15-87 Low Level 1 and 2 Need by 8-15-87 l SER Issued I i PVLCS Submitted 5-11-87 l Need by 9-3-87 1 l ECCS Integrated Testing Submitted 5-11-87 Need by 8-13 SER Issued Reactor Vessel Steam Dome - Hi Press Submitted 5-15-87 Need by 8-14-87 SER Issued l ECCS/ ADS Trip Submitted 5-15-87 1 Need by 8-24-87

Withdrawn 6-30-87

Report Submitted 8-5-87 Technical Specification Change Request Submittal by 8-21-87 Need by End of RF1

Reload Changes Report Submitted 7-31-87 Technical Specification Change Request Submitted 8-14-87 Nted by End of RF1 Section 6 - Engineering Expertise On-Shift Submitted 6-18-87 Turbine Maintenance Program Submitted 5-13-87 Need by 8-28-87 Process Control Program Revision Submitted 7-16-87 Need by 10-15-87
  • Information provided by GSU.

l ATTACHMENT (cont'd) l B. Others - Not Required for RF1 l Suppression Pool Pumpback Submitted 9-10-86 RBG-24358

  • Control Rod Block Submittal by 8-31-87 Settlement Monitoring Submitted 8-5-87 l
  • First Stage Turbine Pressure Submittal by 9-30-87

Supplement Required Submittal by 9-30-87 l Diesel Generator Action Statement Submitted by 8-7-87 Administrative Controls Submitted by 6-18-87 I Supplement Required Submitted 7-31-87 Main Steem Line Area Temperature Submitted 6-05-87 REG-26059 Drywell Average Temperature Submitted 6-05-87 l RBG-26059 Leak Detection Isolation Actuation Instrumentation (RWCU) Submitted 6-18-87 Main Steam Tunnel Temperature Monitoring Submitted 6-05-87 RBG-26059

  • Hydrogren Control Analysis Results Status Submitted 3-31-87 &

5-08-87 Supplement Required Submittal by 9-30-87

  • Containment Venting Evaluation Report Meeting with Staff 5-28-87 Evaluation Submittal Submittal by 8-15-87
  • Data Collection Program for Containment Purge Meeting With Staff 5-28-87 Status Report with License Amendment (TS) Submittal by 10-15-87 Final Staff Approval Required Need 3 mos. Post RF1 SPD5 HED Status Report Submitted 7-24-87 Inservice Testing (IST) Program Relief Requests for Pump and Valve SSER Section 3.9.6 NRC Approval or Extension Required Need by 8-29-87
  • Information to be provided by CSU.

l ATTACHMENT (cont'd) l

  • Instrument Setpoint Methodology Report Submitted 7-8-87 )

l Submittal by 6 months .g post NRC Generic .!

approval )

  • EOP Meeting (Flow Charts) with Staff 6-15-87 E0P's, Deviations, OSP's & Training a Philosophy Changes Submittal by 12-15-87 q i
  • Information to be provided by GSU.  ;

i 1

i a

I i