Submits Current Info Re Const Completion Dates,Per NRC 800711 Request.Const for Unit 1 Estimated at 17.1% Complete as of 800630.Schedule for Unit 2 Not Available at Present
ML19330B453
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 07/24/1980
From: Draper E
GULF STATES UTILITIES CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RBG---8130, NUDOCS 8008040039
Download: ML19330B453 (1)


Text

,

OU F STATES UTI.LITIES COM.PANY

=.;

==:

3: 4 :,2

. asia;-

rs>2 s--

a eJia CODE ?;3 939-3843 July 24, 1980 RBG - 8130 Files G9.5, C9.11 Mr. Darrel G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20535

Dear Mr. Eisenhut:

River Bend Station Units 1 & 2 Docket Nos.30-458. 50-459 In response to your letter of July 11, 1980 requesting current information on construction completion dates, the following information is provided:

FSAR ER Construction OL i

tendered tendered Completed Issued River Bend Unit.1 3/1/81 3/1/81~

9/30/83 9/30/83 River Bend Unit 2 (not currently scheduled)

Construction emphasis at this time is placed on Unit 1 (estimated at 17.1% complete as of June 30, 1980). A firm schedule for Unit.2 is not available at this time.

Sincerely, D

L W

E. L. Draper Vice President - Technical Systems ELD /h /mb COI 5