ML19274E703
| ML19274E703 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/09/1979 |
| From: | Humphreys L GULF STATES UTILITIES CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| RBG-6300, NUDOCS 7904170195 | |
| Download: ML19274E703 (1) | |
Text
.
GULF STATES UTILITIES COMPANY -
POST OP F 1 CE H O x 295 1 H F AU M ON T T E xA S 7 7 70 4 A H [ A C OD L 7 1 3 6 3 8 6 6
.5 1
April 9, 1979 RisI-6300 File 09.5 Mr. Hitroid R. Denton Director, Ju;1 ear Ruactor Heatlationn IJualear Reallat ory Conm!aalon h"lah ! ne:tu 1, D.C.
20555
Dear Sir:
River Pend Stat ion Units 1 & ?
Docket floa. 50 1451 50 1459 Gulf Stat en Utilitien hau recently reornardzed the Errineerine and Conctruct ion Depat Lnent which includen the River Pend Project. Thin reoniinization inn been previously dineuscod with your utaff and the Recicn IV Office of Inupaction a2tl Enforcenent. As part of the rearran-Inat lon, the Quality Anaurance Departnent will report to Dr. J. G. Welr ind, General I.bnaner-:!uelear Pro,Jectn.
Dr. Weirand has overall renponalbility for the entire River Pend Pro. lect.
He will be neportinn to Mr. L. L.
Hunphreys, Senior Vice Precident Fiv.ineer.!nc and i'onatruction.
We are n2Vluing the !!uclear Quallty Anaurance f.'anual, "?!QAM" to reflect th10 rearrani",ation.
We feel that, the Quality Ansurance Departirent will ec.ltinue to nnintain its independence in Itn reporting f'unellon and th13 chance neets tre requirenxents of 10CFR50, Aprendix B and the Quallt,y Ar,urance Program an outlined in the PrelintInary Safety Analyuln Report, " P', AR ".
A revised I;QAM will be in effect April 16, 1979.
Proper not,lrica-tien and diotribution of this manual han been Unde to t.1e Henion IV Office of Innpection and Fnforcenent.
Sincerely, L. L. Hunphreyn Senior Vice President Farineering & Conatructton 3
h'dR/ce O
Director, liRC I&E, Redon IV
\\Q cc:
\\
79041701%
k