RBG-27051, Forwards Updated Human Engineering Discrepancies (Heds) to Reflect Current Completion Status Re Dcrdr

From kanterella
Jump to navigation Jump to search
Forwards Updated Human Engineering Discrepancies (Heds) to Reflect Current Completion Status Re Dcrdr
ML20236W185
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/25/1987
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RBG-27051, NUDOCS 8712070317
Download: ML20236W185 (14)


Text

/

'M ' '

GULF STATES UTILITIES COMPANY '

POSTGFFICE BOX 2951 . BEAUMONT, TEXAS 77704 AREACODE 409 838-6631 November 25, 1987 RBG- 27051 File No. G9.33.4 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

River Bend Station - Unit 1 Docket No. 50-458 This letter provides the completion status of License Condition 2(C)(14)., Attachment 5, Item 1 to the River Bend Station Facility Operating License NPF-47 regarding the eleven remaining Human Engineering Discrepancies (HEDs) from the Detailed Control Room Design Review. The attached HEDs have been updated to reflect their current completion status.

If further information is required, please contact Mr. Rick J. King at (504) 381-4146.

Sincerely

, J. E. Booker Manager, River Bend Oversight

. River Bend Nuclear Group Attachments U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Sr. Resident Inspector Post Office Box 1051 St. Francisville, LA 70775 h

8712070317 871125 00 PDR ADOCK 05000450 p PDR l

HUMAN ENGINEERING DISCREPANCY RECORD

, RIVER BEND NUCLEAR PLANT DATE: 02/27/84 FIIE I) b4 C) . : <& 3 REVIEWER: BARKS / CHASE /SHANKLE TRACKING STATUS: SCHEDULE PHASE .

I I

1 DATA SOURCE: BWR OWNERS GROUP j

' CHECKLIST NO.: A3.2 CHECKLIST AREA: PANEL LAYOUT AND DESIGN l

PANEL / WORKSTATION NO. P808-85C

( 1.)

DESCRIPTION OF DISCREPANCY:

CIRC-WATER SYSTEM THE CONDENSER IS ARRANGED 1B ON TOP AND 1A ON BOTTOM j RECOMMENDATIONS:

CHANGE 1A TO TOP AND 1B TO THE BOTTOM

<<< WORK INITIATED ON HR 88-0441, MWO 107022. WORK IS COMPLETE >>>

ACTION:

APPROVED BY GSU MANAGEMENT.

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE l

l l

I -

l - i

l 0

ENGINEERING HUMAN DISCREPANCY RECORD RIVER BEND NUCLEAR PLANT DATE: 02/27/84 HED NO. : 105

' REVIEWER: BARKS / CHASE /SHANKLE TRACKING STATUS: SCHEDULE PHASE I

DATA SOURCE: BWR OWNERS GROUP CHECKLIST NO.: C1.1 CHECKLIST AREA: ANNUNCIATORS I

PANEL / WORKSTATION NO. GENERIC

( 1.)

DESCRIPTION OF DISCREPANCY:

THE ANNUNCIATOR SPARES INCREASE ANNUNCIATOR WINDOW DENSITY RECOMMENDATIONS:

HAKE SPARES DARK

<<< WORK WAS INITIATED ON HR 85-0958, AND IS NOW COMPLETE. SPARE WINDOWS WERE REPLACED WITH SHOKED PLEXIGLASS. >>>

ACTION:

APPROVED BY GSU HANAGEMENT.

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE I

HUMAN ENGINEERING DISCREPANCY RECORD

. RIVER BEND NUCLEAR PLANT

~

DATE: 02/28/84 FIIE I) b4C3 . : 12? E3 REVIEWER: BARKS / CHASE /SHANKLE ,

TRACKING STATUS: SCHEDULE PHASE DATA SOURCE: BWR OWNERS GROUP CHECKLIST NO.: C1.1 CHECKLIST AREA: ANNUNCIATORS PANEL / WORKSTATION NO. P883-75

( 1.)

PANEL / WORKSTATION NO. P883-74

( 1.)

DESCRIPTION OF DISCREPANCY:

ANNUNCIATOR GROUPINGS FOR-BATTERY ROOH TEMP IS 1A,1C,1B TOP / BOTTOM ; CONTROL BLDG VENT SYSTEM INOP DIVISION I,II,III TOP /BOTTOH; RECOHHENDATIONS:

CHANGE ANNUNCIATOR GROUPINGS TO MEET HUMAN FACTORS CONVENTIONS.

<<< WORK INITIATED ON HR 88-0442, HWO 110581. WORK IS COMPLETE >>>

ACTION:

APPROVED BY GSU HANAGEMENT.

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE

HUMAN ENGINEERING DISCREPANCY RECORD RIVER BEND NUCLEAR PLANT i DATE: 02/23/84 FIIE E) b4 C) . : 2 4L G3 REVIEWER: LIDDLE /MATSON/ BISHOP TRACKING STATUS: SCHEDULE PHASE DATA SOURCE: BWR OWNERS GROUP CHECKLIST NO.: A3.2 CHECKLIST AREA: PANEL LAYOUT AND DESIGN l

PANEL / WORKSTATION NO. P870-51C DESCRIPTION OF DISCREPANCY:

DW EQPT DR SUMP & CONTHT EQPT DR IS ARRANGED 'B' OVER 'A' RECOMMENDATIONS:

ARRANGE 'A' OVER 'B'

<<< WORK INITIATED ON HR 88-0441, HWO 107022. WORK IS COMPLETE >>>

ACTION:

APPROVED BY GSU HANAGEMENT.

4 CRITICALITY RATING: 4 l IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE 1

4 i

____u_._ . . . _ _ _ _ _

ENGINEERING DISCREPANCY RECORD HUMAN

- RIVER BEND NUCLEAR PLANT DATE: 02/29/84 F{ IE E) 24 C3 . : 3 <L <&

REVIEWER: SCHROEDER/MATSON/BISH.0P TRACKING STATUS: SCHEDULE PHASE DATA SOURCE: BWR OWNERS GROUP CHECKLIST NO.: D3.4 CHECKLIST AREA: COMPUTERS PANEL / WORKSTATION NO. P880

( 1.) PHS COMPUTER DESCRIPTION OF DISCREPANCY:

THE COLOR CODING ON CRT DISPLAYS IS NOT CONSISTENT WITH ALL COLOR STANDARDS IN THE CONTROL ROOM.

RECOMMENDATIONS:

THE PHS COMPUTER SOFTWAR2 IS PRESENTLY UNDER DEVELOPMENT. THE SITE DCRDR HEMBERS WILL WORK WITH THE GSU COMPUTER GROUP TO DEVELOP A CONSISTENT COLOR STANDARD.<<<AN INVESTIGATION INTO THE DEVELOPMENT OF A CONSISTENT COLOR STANDARD IS UNDERWAY TO DETERMINE THE COST, PLANT IMPACT, AND BENEFITS. TO FULLY EVALUATE THE SOFTWARE UNDER OPERATIONAL CONDITIONS, AND TO BE CONSISTENT WITH OTHER HEDs WITH A CRITICALITY RATING OF 4, THE CONCLUSION WILL BE SUBHITTED BY THE ist REFUELING OUTAGE.AS AN INTERIH CORRECTIVE ACTION, AN OPERATOR AID WILL BE ADDED (PRIOR TO FUEL LOAD) TO IDENTIFY THE HEANING OF THE SOFTWARE COLORS.THE PROCESS COMPUTER IS NOT REQUIRED FOR IMPLEMENTATION OF THE RBS E0Ps,IS NOT SAFETY-RELATED,AND IS NOT SAFETY (SEE BELOW ACTION:

<<< SIGNIFICANT . GSU OPERATORS HAVE NOT EXPERIENCED DIFFICULTY OR CONFUSION IN WORKING WITH THE COMPUTER SOFTWARE ON THE RBS PLANT-SPECIFIC SIMULATOR. AS A RESULT, THIS HED WAS GIVEN THE LOWEST PRIORITY RATING >>>

<<< S E E N E XT PAGE FOR UPDATED RESPONSE 077 I

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE 4

L____--_----_--- l

f RESPONSE TO HED.#344 GSU has determined that the present design is acceptable. Operations has been using the PMS cong uter now for over two years and have had no problem / concern with the'ector coding. The main difference is that PMS of white. The important colors, uses yellow green for informatio7(,instead (alert) and red trip) are consistent with RBS conventions. A review of cost benefit 6,3 plant impact did not substantiate any further

. action for this HED. Ti.erefore, no further action will be taken.

i.

tJi e

e l'

,.A

)=%.

9,

(<

3 h* t v'

,1 .;

i

- tm f

{

i 3 t

i f

l' 1

l I

g O HUMAN ENGINEERING DISCREPANCY RECORD

, i

'// ' ; ' BEND NUCLEAR RIVER PLANT d

,. 'DATIs 01,(2h/84 ,< HED NO. : 345

't g ,, . . I

, REVIEWER: SCHROEDER/MATSON/S SMDP TRACKING STATUS: SCHEDULE PHASE c t-

~ , l' , ,

j j' _.

DATA SOURCE: BWR OWNEB!f'3ROUPS

/

CHECKLIST NO.: D3.5 i j .s.

CHECKLIST AREA: COMPUTERS 4 /fr /.

I

\

t

, ,s i

\ , i.<

)l s a  !

.1 s' PANEL /WORA3TATION NO. P680

( 1.) PMS COMPUTER

/

di.d.__. [._

A/

DESCRIPTION OF DISCREPANCY:

CRT DISPLAYS ARE, MOT COLOR CODED SO THAT LOSS OF A PRIMARY COLOR GUN DOES NOT RESULT IN LOSS OF'A NUMERICAL VALUE OR SCALE.

RECQYMENDATIONS:

?R $3FTWARE IS PRESEFTLY UNDER DEVELOPMENT. THE SITE DCRDR THE MEMBERS PMSWILL COMPU}ORK N WITH THE GSU COMPUTER GROUP TO INVESTIGATE T OF APPROPRI ATE COLOR CODING. << <AN IdVESTtGATION INTO MODIFYING THE COMPUTER SOFTWARE IS UNDER4tY TO 5 +

DETERMINE THE, COST, PLANT IMPACT,' ,AND3 %}3NEFITS.

IN ORDER TO FULLY EVALUATE THE SOFTWARE UNDER OPERATION 4L CONDITIONS, AND TO BE CONSISTENT WITH OTHER HEDs WITH A CRITICALITY RATING OF A,. THE CONCLUSION WILL BE SUBFITTED BY THE ~

1st REFUELING OUTAGEt .

THEPROCESSCOMPUTERI4NOTkSQUIREDFORIMPLEMENTATIONOFTHERBSEOPs,IS NOT SAFETY-RELATED /, AND IS WOT SAFETY-SIGNIFICANT < GSU OPERATORS HAVE NOT .

EXPERIENCED DIFFICYLT7 OR CONFUSION IN WORKING #iTH THE COMPUTER SOFTWARE ON 1 THE RBS (SEE BELOW) (i

/ ,

ACTION: /

, <<< PLANT-SPECIFIC SIMULATOR. AS A RESULT, THIS HED WAS GIVEN THE LOWEST PRIORITY RATING. >>> 3

);/ L, a  ; .

(

& SEE NEXT PAGE FOR UPDATED RESPONSE)$

i

[

  • \

./ p ,  ;

i vit ,,

l CRITICAMTI g RATING: 4 l

IMPLEY[tT.ATIONSCHEDULE: 1st REFUELING OUTAGE }

,y .

I l

I k i t

A, .! -;

g tr D- - RESPONSE TO HED #345 v GSU has determined that the present design is acceptable. The PMS computer has redundant screens on the same panel which you can easily switch from one to the other. A second backup screen also exists in the

' ?'i control room near the'FMS computer. A loss of a color gun would change the remaining colors, making it obvious that a problem existed. A review of cost benefit and plant impact did not substantiate any further action for this HED. Therefore, no further action will be taken, t

I

\

.?

i>

S t :

t r

(

l I

l _ _ _ _ _ _ _ _ ___

HUMAN ENGINEERING DISCREPANCY RECORD

~

RIVER BEND- NUCLEAR PLANT DATE: 02/23/84 Fi1E I) t4 C3 . : 529 REVIEWER: BURGY/CNASE TRACKING STATUS: SCHEDULE PHASE 1

DATA SOURCE: BWR OWNERS GROUP CHECKLIST NO.: C1.2 CHECKLIST AREA: ANNUNCIATORS PANEL / WORKSTATION NO. P680-7A PANEL / WORKSTATION NO. P880-8A PANEL / WORKSTATION NO. P880-9A DESCRIPTION OF DISCREPANCY:

ANNUNCIATORS ARE NOT GROUPED ABOVE RELATED CONTROLS AND DISPLAYS (INSERT 7A VERTICAL COLUMNS 7. WINDOWS ON COLUMN 3,4,5 SHOULD BE MOVED TO OTHER INSERTS. COLUMN 8 WINDOWS 4 & 5 SHOULD BE HOVED)

RECOMMENDATIONS:

REARRANGE ANNUNCIATORS TO BE ABOVE RELATED CONTROLS AND DISPLAYS.

<<< WORK INITIATED PER MR F23-0442, HWO 110581 TO REARRANGE ANNUNCIATORS ON THE PANEL INSERTS LISTED ABOVE . WORK IS COMPLETE >>>

ACTION:

APPROVED BY GSU MANAGEMENT.

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE 1

1

~

l HUMAN ENGINEERING DISCREPANCY RECORD

^

RIVER BEND NUCLEAR PLANT DATE: 02/21/84 FI IE E) b4 C) . : 8 4L :3 REVIEWER: BURGY/ CHASE TRACKING STATUS: SCHEDULE PHASE DATA SOURCE: BWR OWNERS GROUP CHECKLIST NO.: C1.2 CHECKLIST AREA: ANNUNCIATORS PANEL / WORKSTATION NO. PB01-18A PANEL / WORKSTATION NO. PB01-19A PANEL / WORKSTATION NO. PB01-22A DESCRIPTION OF DISCREPANCY:

ANNUNCIATORS ARE NOT GROUPED ABOVE RELATED CONTROLS AND DISPLAYS.

RECONNENDATIONS:

GROUP MAIN STEAM LINE LOGIC A THRU D HIGH TEMP ANNUNCIATORS ON EITHER 18A OR 19A. ALSO GROUP ADS ANNUNCIATORS & RPS ANNUNCIATORS.

<<< WORK INITIATED PER MR 88-0442, MWO 110581 TO REARRANGE ANNUNCIATORS ON THE PANEL INSERTS LISTED ABOVE. WORK IS COMPLETE >>>

ACTION:

APPROVED BY GSU HANAGEMENT.

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE

O HUMAN ENGINEERING DISCREPANCY RECORD

, RIVER BEND NUCLEAR PLANT DATE: 02/28/84 HED NO. : 7O2 REVIEWER: BURGY/ CHASE TRACKING STATUS: SCHEDULE PHASE l

l DATA SOURCE: BWR OWNERS GROUP CHECKLIST NO.: CB.4 I CHECKLIST AREA: ANNUNCIATORS j I,

PANEL / WORKSTATION NO. GENERIC DESCRIPTION OF DISCREPANCY:

FOR VISUAL ANNUNCIATION, EACH WINDOW WILL NOT AUTOMATICALLY BLINK (AT SLOWER RATE) WHEN ALARM INPUT CLEARS. SLOWER RATE SHOULD BE INCREASED.

RECOMMENDATIONS:

INCREASE BLINKING SPEED.

<<< BLINKING SPEED HAS BEEN ADJUSTED. WORK IS COMPLETE. >>>

ACTION:

APPROVED BY GSU HANAGEMENT.

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE

0 l HUMAN ENGINEERING DISCREPANCY RECORD j i RIVER BEND NUCLEAR PLANT DATE: 09/98/4 HED NO. : 8O3 REVIEWER: LINK TRACKING STATUS: SCHEDULE PHASE DATA SOURCE: OPERATING PERSONNEL INTERVIEW CHECKLIST NO.: El CHECKLIST AREA: PROCEDURES PANEL / WORKSTATION NO. GENERIC

( 1.)

l DESCRIPTION OF DISCREPANCY:

PROCEDURE CARTS FOR USE AT CONTROL BOARDS ARE UNWEILDY AND BLOCK OFF PART OF PANEL WHEN IN USE RECOMMENDATIONS:

THESE CARTS ARE IN THE SIMULATOR OPERATIONS WILL ORDER CONTROL ROOM CARTS THAT DO NOT BLOCK OFF THE PANELS.

<<< A PROCEDURE RACK HAS BEEN PURCHASED AND LOCATED SUCH THAT THE PANEL VISIBILITY IS NOT AFFECTED. WORK IS COMPLETE. >>>

ACTION:

APPROVED BY GSU MANAGEMENT.

CRITICALITY RATING: 4 IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE

H tJ M AN ENGINEERING DISCREPANCY RECORD L

{

, RIVER BEND NUCLEAR PLANT ]

DATE: 080885 FIIE E) bTC) . : 879 REVIEWER: CHASE ,

TRACKING STATUS: SCHEDULE PHASE 1

l DATA SOURCE: NONE CHECKLIST NO.:

PANEL / WORKSTATION NO. GENERIC

( 1.)

DESCRIPTION OF DISCREPANCY:

THE BACKGROUND NOISE LEVELS IN THE MAIN CONTROL ROOM SHOULD BE HEASURED DURING NORMAL OPERATION.

RECOMMENDATIONS:

TAKE NOISE LEVEL READINGS DURING NORMAL OPERATION IN THE MAIN CONTROL ROOM TO CONFIRH PRE-OPERATIONAL MEASURED BACKGROUND NOISE LEVELS.

<<< IN RESPONSE TO NRC I&E BULLTIN 79-18 ( GSU LICENSING COMMITTMENT 04347),

GSU MEASURED BACKGROUND NOISE LEVELS IN THE MAIN CONTROL ROOM DURING MARCH 1988 AND FOUND ALL OF THESE LEVELS TO BE WITHIN ACCEPTABLE LIMITS WORK IS COMPLETE. >>>

ACTION:

l CRITICALITY RATING:

IMPLEMENTATION SCHEDULE: 1st REFUELING OUTAGE l

l l

l

_ _ _ _ _ _ _ ._