Forwards Proposed Schedule for Complying W/Hydrogen Control Owners Group Final Rule Requiring Testing & Analysis to Ensure Combustible Gas Control.List of Hydrogen Burn Survival Equipment & Analysis Will Be Submitted by 850701
ML20128B490
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/26/1985
From: Booker J
GULF STATES UTILITIES CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RBG-21-389, NUDOCS 8507030255
Download: ML20128B490 (3)


Text

6: -.

- l GULF STATES UTILITIES COMPANY June 26, 1985 RBG- 21,389 File No. G9.5 1

~Mr. Harold.R. Denton, Director Offi of Nuclear Beactor Regulation >

U.S. ' Nuclear Regulatory Comission Whshington, D.C. 20555 .

Dear Mr. Denton:

River ~ Bend Station - Unit 1 Docket No."50-458

%e final rule ~ for cabustible ; gas control was published in.the Federal Register on January 25,:1985. % e rule requires that a hy l vgeni control . ' system justified by a suitable progre of testing and analysis be provided in Mark III contaiment plants such as River Bend Station.

%e rulei also requires that applicants develop and sutmit a pivr ead schedule for meeting the requirements of the final _ rule (10 CPR 50.44, paragraphs (c) (3) (iv) , (v)', and (vi)) .s GSU is a menber of the: Hy &&a Control Owners' Group and is actively supporting ccspletion' of the progra elements described in the HOOG Hy& uysn Control Progr e Plan:(sutnitted to the NRC on D + 2+r 14, 1985) . : GSU's pt ,-*3 schedule for ccsplying with the hydrogen rule as it applies to the River Bend Station,is attached.- h is schedule shows p --:*1 coupletion dates for the generic: tasks as well as River Bend Statie - specific activities. As shown, a hy& vveu control system for

-the x Bend Station has been designed, installed, and tested.

%e final rule also requires'that analysis which supports the design of. the hy&vycai control system be subnitted to the Nuclear Regulatory Ocamission. As delineated in 10' CPR 50.44 paragrat ia (c) (3) (vii) (B) ,

. final analyses are not n-===ry provided that preliminary analysis

' ' which muwvii interim operation at. full power are supplied. As shown in the attached schedule, RBS's contaiment ultimate pressure capacity-analysis and.contalment response to hydrogen burns (CIASIX-3) analysis are ocuplete and~ have been supplied previously. A list of equipnent required to survive a hy&us n; burn and a . preliminary equipnent survivability analysis of postulated hy& vven c mbustion within the RBS.

contaiment will be subnitted by Jtily 1,1985. % ese analyses support a decision to allow interim operation of River Bend Station at full power.

8507030255 850626 #

PDR 'ADOCK 05000458 A PDR ,

I ,!7 l

1 l

l

'Ihe schedule supplied herein satisfies the requirenents of 10 CFR 50.44 (c) (3) (vii) . It should be noted that this schedule has been developed based upon tentative agreenents with the NBC staff on the Hydrogen Control Owners' Group program tasks. If any changes in the scope of these tasks are required by the staff, this schedule may j require revisions. 1 Sincerely,

.I J. E. Booker Manager - Engineering Nuclear Fuels & Licensing pr River Bend Nuclear Group am/us/MAM/ks Attachment l

l

WIVER SEND SCHEDULE FO,1 CLMPLILNCE WITH 10 CF2 St.44 (C) (3) (IV), (C) (3)

(V). & (C) (3) (VI)

M0 tK I NO SCNE 3UL E i 1998 1986 1987 M JlJlAlSl0lNlO JlFlMlAlMlJ]JlAlSl0lNl0 J lF lM i

j NOTE: THIS SCHEDULE IS BASED ON CURRENT j UNDERSTANDING OF AGREEMENTS ACHIEVED

$ MITH THE NRC STAFF ON NC00 PROGRAM i PLAN TASKS AND IS SUBJECT TO REVISION.

1 IF SUBSTANTIAL CHANGES ARE REGUIRED TO i THOSE TASKS.

d

ESTABLISH HYDROGEN OENERATION EVENT ...................I I
SELECT MITIOATION SYSTEM ................................M l DEVELOP OENERIC HYDROGEN IONITER TECHNICAL *---*g l SPECIFICATIONS. ,

DESION. INSTALLATION AND TESTING OF RSS HYDR 00EN *--

IGNITER SYSTEM CCNTAINMENT ULTIMATE CAPACITY ANALYSIS ...............M i SELECT CONTAINMENT RESPONSE ANALYSIS CODE ...........M

' HVOR00EM COMBUSTION TESTING (EXCLUDE 1/4 SCALE *--~~l g TEST)

OENERATION OF HYDROGEN RELEASE HISTORIES .............I I l CBS CONTAIMMENT RESPONSE ANALYSIS .....................M CCNTAINMENT RESPONSE ANALYSIS ..........................I I I/4 SCALE MODEL TEST PR00 RAM ...........................I I DRYMELL RESPONSE EVALUATION ............................I I i CBS PRELIMINARY SURVIVASILITY ANALYSIS ...............E I

i EQUIPMENT SURVIVASILITY ANALYSIS PROGRAM .............I 1 VdtLIDATION OF ANALYTICAL METHODS ......................I I l GENERIC COMBUSTIBLE GAS CONTROL EPO l

NOTE: CURRENT RSS E0P"S PROVIDE OPERATOR ----*l l

, INSTRUCTION FOR RSS 10 NITER SYSTEM INITIATION. l NEVADA TEST SITE DATA EVALUATION , _ ,, g g I

l LEGENO: DIAMOND = COMPLETE FOR RSS t

4 4

h f .

. _. _ _ _ _ - - - _ ---