ML19322E950
| ML19322E950 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 02/22/1980 |
| From: | Weigand J GULF STATES UTILITIES CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19322E951 | List: |
| References | |
| RBG-7276, NUDOCS 8004040370 | |
| Download: ML19322E950 (1) | |
Text
l l
C GULF STATES UTELITIES COMPANY AOST OFFICE Box 2951
- BEAUMCNT, TEXAS 77?C4 APEA CODE 713 8 3 8 E E, 3.
February 22, 1980 RBG - 7276 File G9 5 Mr. Karl V. Seyfrit Director U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011
Dear Mr. Seyfrit:
River Bend Station Unit 1 Docket No. 50 h58 As requested in your letter of December 13, 1979, enclosed are the four month results of the ASTM C-227 mortar bar test for lov alkali (job cement) with both fine and coarse aggregates.
The four month results, recorded as an average length change percent, are +0.02 and +0.01 for fine and coarse aggregates, res-pectively and are well within the acceptance limits of +0.05 for 3 month and +0.1 for 6 month test durations.
The 5 month results are scheduled to be completed on March 10, 1980. We vill transmit those results to you as soon as we receive them.
Sincerely,
[8 J. G. Weigand Vice President Operations and Technical Systems JGW/WJR/JEB/mb Enclosure 8004040 3 70