U-0454 ILLIN0/S POWER COMPANY 3
L30-82(03-30)-6 500 SOU1" 27TH STREET, DECATUR, ILLINOIS 62525 March 30, 1982 Mr. James R. Miller, Chief Standardization & Special Projects Branch
~s Division of Licensing p
n!
Office of Nuclear Reactor Regulation s
U. S. Nuclear Regulatory Commission d,
Washington, D. C.
20555
.g gygp
Dear Mr. Miller:
2 APR 5 19825" wm cre w*
3 rcau
,_y#
Clinton Power Station Ulti 1
,s Docket No. 50-461 1y 7
9 cn as By the letter dated March 12, 1982, Mr. Dale Holtzscher, Chairman of the LRG-II Working Group, provided you with position papers on twelve of the fifty-six presently identified LRG-II issues.
As you know, Illinois Power Company is a member of the LRG-II.
We would like to advise you, in accordance with the practices developed by NRR and the LRG-II, that Illinois Power Company hereby incorporates those twelve position papers pro-vided in Mr. Holtzscher's March 12, 1982 letter into the Clinton Power Station OL application.
s For specificity, the March 12, 1982 letter provides infor-mation on the LRG-II issues identified in the following manner:
3-CPB 4-ICSB l-MEB ll-CPB l-PSB l-SEB l-CSB l-CHEB 2-SEB 3-ASB 2-CHEB 4-CPB, Revision 1 When subsequent LRG-II position papers are developed and~ pro-vided to NRR, we intend to incorporate them in similar fashion.
Sincerely,
/
G. E. Wuller Supervisor-Lice, sing Nuclear Station Engineering GEW:mr 6004 cc:
J. H. Williams, NRC Clinton Project Manager s
H. H. Livermore, NRC Resident Inspector f o H. F. Faulkner, NRC LRG-II Project Manager Illinois Dept. of Nuclear Safety F204060060 820330 PDR REVQP ERGLR