Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARRBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed1990-09-10010 September 1990 Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range1990-08-30030 August 1990 Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range RBG-33460, Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.211990-08-28028 August 1990 Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21 RBG-33496, Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment1990-08-28028 August 1990 Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment RBG-33450, Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-9003011990-08-28028 August 1990 Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301 RBG-33424, Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 9009291990-08-22022 August 1990 Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929 RBG-33372, Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified1990-08-10010 August 1990 Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified RBG-33310, Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages1990-08-0101 August 1990 Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting1990-07-30030 July 1990 Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting RBG-33294, Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank1990-07-26026 July 1990 Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-161990-07-13013 July 1990 Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16 RBG-33150, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed1990-07-0202 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed RBG-33143, Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 19901990-06-29029 June 1990 Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990 RBG-33132, Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs1990-06-28028 June 1990 Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs RBG-33120, Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads1990-06-26026 June 1990 Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads RBG-33114, Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon1990-06-26026 June 1990 Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License1990-06-26026 June 1990 Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License RBG-33100, Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 19901990-06-22022 June 1990 Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990 ML20043G2211990-06-14014 June 1990 Responds to 900509 Request for Addl Info Re 900209 Response to Violations Noted in Insp Rept 50-458/89-41.Procedure Being Developed to Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys ML20043G8191990-06-12012 June 1990 Forwards Rev 5A to Pump Valve Inservice Testing Plan,For Review.Rev Provides Addl Info & Clarification for Requests for Relief Noted in Rev 5 ML20043E6531990-06-0606 June 1990 Forwards Addl Info Re 880930 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09 Requirements Re Preplanned Use of Addl Operating Flexibility ML20043F9801990-06-0606 June 1990 Forwards Response to NRC 890731 Request for Addl Info Re Util 890731 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09.Justifications for Use of Proposed Tech Spec 3.0.4 Will Be Submitted Separately ML20043D5591990-06-0101 June 1990 Provides Status of Actions Re Insp Rept 50-458/89-45 Which Dealt W/Dual Coil Solenoid Operated Valves Used to Control MSIVs ML20043D5421990-06-0101 June 1990 Forwards Addendum to River Bend Station - Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. ML20043D5401990-06-0101 June 1990 Provides Update to 900125 & 0315 Responses to Insp Rept 50-458/89-200.Util in Process of Performing Retrofit Review of in-stock Items Purchased Between 850101-900101 ML20043D2371990-05-31031 May 1990 Provides Suppl to 890929 Response to Violations Noted in Insp Rept 50-458/89-31.Safety Tagging Administrative Procedure Being Revised to Make Clearance Program Easier to Understand & Follow ML20043C8011990-05-29029 May 1990 Forwards Rev 12 to Physical Security Plan.Rev Reflects Current Activities of Plant Security Programs.Rev Withheld (Ref 10CFR73.21.) ML20043B4231990-05-21021 May 1990 Forwards Rept Re Investigation Involving Unsatisfactory Performance Test Result by Dhhs Certified Lab Under Contract to Util to Perform Drug Screen Testing Under 10CFR26, Fitness-For-Duty Program. ML20043A4271990-05-14014 May 1990 Forwards Authorization of Util Board of Directors for Tf Plunkett & Wh Odell to Sign Ltrs to NRC Transmitting Amends to OL or Responses to Insp Repts ML20042G7031990-05-0909 May 1990 Responds to NRC 900405 Ltr Re Weaknesses Noted in Insp Rept 50-458/90-06 on 900220-23.Corrective Action:Software in Simulator Changed to Duplicate Software in Control Room & More Training Time on Computers Given to Operators ML20042F9741990-05-0707 May 1990 Responds to Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Electrical Power Removed from Valves,Safety Assessment of Spurious Opening Performed & QA Performed on Energized Valves ML20042G2521990-05-0404 May 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' ML20042E3781990-04-0606 April 1990 Responds to Violations Noted in Ofc of Investigations Rept 4-88-027,per Enforcement Action 90-043.Corrective Actions: Util Auditing self-screening Contractor Programs to Assure Compliance & Audit Will Be Evaluated for Acceptability ML20042D8351990-03-30030 March 1990 Submits Supplemental Info Re Util Response to Station Blackout Rule & Advises That Results of Plant Evaluations Demonstrate Ability to Cope W/Station Blackout for Proposed 4 H Duration W/O Reliance on Ac Power Sources ML20042E3501990-03-30030 March 1990 Forwards Evaluation of Unsatisfactory Performance by Dhhs Certified Lab Performing Drug Testing ML20012F1571990-03-28028 March 1990 Requests Extension Until 900601 to Submit Changes to Facility Tech Specs Re Leak Detection & Inservice Insp Program,Per Generic Ltr 88-01 ML20012F1551990-03-28028 March 1990 Suppls 890411 Response to Violations Noted in Insp Rept 50-458/86-04.Operations QC Instructed QC Planners & Lead Inspector to Include Hold Point of Electrical Maint Work Request for Category I Electrical Equipment Panels ML20042D7041990-03-21021 March 1990 Forwards Results of Ultrasonic Testing Conducted on N4A-2 Feedwater nozzle-to-safe End Weld During mid-cycle Outage at Plant.Circumferential Indication Identified in Buttered Area on Safe End Side of Weld During Second Refueling Outage ML20012E0001990-03-20020 March 1990 Forwards Marsh & Mclennan 900313 Ltr Containing Summary of Property Insurance Coverage for Facility,Per 10CFR50.54(w)(2) ML20012C7901990-03-16016 March 1990 Forwards Response to Violations Noted in Insp Rept 50-458/89-39.Response Withheld (Ref 10CFR73.21) ML20012C9931990-03-15015 March 1990 Forwards Duke Engineering & Svcs,Inc 900105 Ltr to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting ML20012C7881990-03-15015 March 1990 Provides Updated Status for Corrective Actions Being Taken for Discrepancies Identified in Insp Rept 50-458/89-200. Thirty-six Items identified.Twenty-eight Items Completed. Three of Eight Remaining Items Require Evaluation of Stock ML20012C0381990-03-0909 March 1990 Advises That Senior Reactor Operator License 43188-1 & Reactor Operator License 42087-2 for a Middlebrooks & DG Looney,Respectively,Expired on 900105 & 900201 ML20012A4431990-03-0101 March 1990 Requests Addl Clarification to Prepare Response to Generic Ltr 90-01 Re Survey of Time Spent by Key Nuclear Power Plant Managers in Responding to Various Operational Insps & Audits ML20012B3001990-03-0101 March 1990 Forwards Fitness for Duty Program Rept 90-F-02 Re Investigation of Unsatisfactory Performance Test Result by Certified Lab Under Contract to Util to Perform Drug Screen Testing,Per 10CFR26 ML20012A9161990-02-28028 February 1990 Forwards Response to Inspector Followup Item Noted in Insp Rept 50-458/89-42 on 891113-17.Corrective Actions:Rev to Procedure EDP-AA-10 Re Issuance of Training Matrix on Semiannual Basis Will Be Issued to Remove 2-yr Rereading ML20011E8431990-02-0909 February 1990 Responds to Violations Noted in Insp Rept 50-458/89-40. Corrective Actions:All Prestaged Matl Removed from Containment & Radiation Protection Personnel Cautioned on Placement of Matl on 95-ft Elevation of Containment ML20011E6741990-02-0909 February 1990 Responds to Violation Noted in Insp Rept 50-458/89-41 on 891101-15.Corrective Actions:Procedure Which Would Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys Being Developed ML20011E1531990-01-29029 January 1990 Provides Currently Identified Outage & nonoutage-related Activities to Update NRC of Util Licensing Activities in Order of Priority ML20006C0061990-01-25025 January 1990 Forwards Notification of Nuclear Liability Insurance Coverage for Facility 1990-09-10
[Table view] |
Text
, ,. ~4
. GULF STATES UTILITIES COMPANY
-ese :,nicsse<23- . e s a s .i o s r ss2s7-: 2 AasA cc: E 7 :, 3 939 663:
March 7, 1980 R3G - 7321 File lio. G9.5 Mr. '4.H. Regan, Chief
,U.S. Nuclear Regulatory Co==ission Environ = ental Project 3 ranch Division of Site Safety and Environ = ental Analysis
'4ashington, D.C. 20555
Dear Mr. Regan:
River Bend Station - Unit 1 Docket No. 50 kS8 At the request of your staff, GSU is providing the following additional infor=ation on the planned transmission route traversing the Port Hudson Battlefield area:
- 1) revised Table 1
- 2) Attach =ent I
- 3) revised Attach =ent II h) revised Exhibit A
- 5) land use map with revisions (provided directly to your reviewer
- 6) infor=ation on residential growth in the vicinity.
This info:=ation supple =ents that trans=itted under a letter to you dated Nove=ber 30, 1979 Please contact us if we can be of any further assistance.
Sincerely, J.G. 'deigand M
Operations and Technical Systems JG'4/v"4C/=b I
Attachments [
{
8o03170 k b
ii -
TO Lcu Sykoski March 7, 1960 .
Frc= James Cock, Environnental Analyst Gulf States Utilities Co.
Subject AREA IAST OF PCRT HUDSON 3ATTLEFIELD I have included certain infer =ation which we hope vill be of help in establishing that this area is a "greving residential area".
In checking the =icrofil files of the East Esten Rouge Public
'4crks repart=ent , Building Fer=it and Inspection Livision, ve were able to establf r.h these statistics for new single fa=ily dwellings lo-cated in this area for each of the last five years.
1975 1976 1977 1978 1979 3h ho 52 63 29 The towns of Zachary, LA and 3aker, LA are situated in such proximity to this area that they are expected to continue exerting residential expansion into this region. Selow are population figures which were available for certain years in the incorporated areas of these towns.
They were offered by the Zachary Cha=ber of Cc==erce and the Baker Mayor's Office respectively.
ZACHARY, LOUISIANA 1970 1979 h,88k 7,120 SAKER, LOUISIANA 1970 1973 1976 1980 6,281 9,757 11,3ko 12,500 (Estimate) 9
. 1 Attach. II Fevised 2-25-80 ROUTES CONSIDERED TO AVCID 2 E FORT HUDSON BATTLEFI M NATIONAL HISTCRIC LANOMA?l:
Purucse Subsequent to the preparation and for=al presentation to the Nuclear Regulatory Cc==ission of Gulf States Utilities Cc=pany's Environ =enal Report-Construction Per=it Stage covering the River Bend Site and associated rights-of-way, there was an area included in the National Register of Historic Places designated as the Port Hudsca 3attlefield which enco= passes a portien of the proposed 230 kV line routes to Port Hudsen and Jaguar (Line Route "C"). GSU was aware of the potential for historical significance of the Battlefield area during the time of our original route selection and had, in fact, vorked with the State of Louisiana prior to this time in the routing of the original right-of-way in the late 1960's.
Relocations and adjust =ents were =ade at that time to avoid any conflicts ed to provide for a ec=patible relationship of our right-of-way with the proposed State facilities.
In the original Enviren= ental Report in Section 10.9.2.1 there is a reference to the effect that alternatives to the 230 kV transmission lines to Port Hudsen and Jaguar substations and connecticns to the existing 230 kV lines "have not been extensively investigated since the ec=bination of existing and new corridors through rural, suburban and urban areas is well established and any deviation vould increase the environ = ental i= pacts."
~
Alternates were certairly investigated at the ti=e, but not formally addressed because the adverse environ = ental i=pcets (land clearing require =ents, water and road crossings, residential proxi=ity, etc. ) were apparent. However, because of the i= pact of the Battlefield designatien,
s ve feel it i= perative to now for= ally address the alternates (See Exhibit A for map) irregardless of the above and notwithstandicg the ecenc=ic consequences of these =enies already ec==itted in the purchase of h25 of the pr'oposed right-of-way, engineering studies and design verk cc=pleted, and of equipment already placed en order.
Pronosed Reute A physical description and an enviren= ental descriptica of Proposed Route "C" can be found in Section 3.9 of the Enviren= ental Report.
A longitudinal description of this proposed transmission line corridor as it traverses the Port Hudson Battlefield area parallel and adjacent to an exist-ing transmission line corridor describing those various land categcries is as follows:
Beginning at the intersection of the transmission line corridor
. with the most northerly line of the Port Hudsen Battlefield area; Thence in a southeasterly direction 200 feet crossing Bottc= land Forest to a point in the northerly bank of Thc=pson Creek; Thence continuing southeast h00 feet crossing Thompscn Creek to a point in the south line of said creek; thence 3100 feet crossing Botte= land Forest; thence 1505 feet crcssing pasture land; thence 1960 feet crossing Upland Forest; Thence 3330 feet crossing Upland Forest, with a 1770 foot pcrtion t the existing transmission corridor adjoining a State Park, to in angle point in the proposed and existing line corridor; Thence easterly 325 feet crossing Upland Forest; Thence continuing easterly 2700 feet crossing residential areas; thence 2290 feet crossing pasture land; thence 150 feet crossing -
residential land, with a 2870 foot portien of the existing trans-
=ission line corridor, as covered in the preceding four course, e.djacent to the sa=e State Park, to an angle point; Thence southerly 1230 feet crossing residential and/or ec==ercial properties; Thence centinuing southerly 1785 feet crossing ec==ercial lands; thence 1020 feet crossing residential properties; thence 25ho feet crossing pasture land; thence 950 feet across industrial lands and to a termination point in the southerly line of Port Hudsen Battle-field.
For tabulation purposes a total footage across each of the various
' land areas traversed is as follcvs:
Sotte= land Forest 3300 feet Upland Forest 5615 feet Rivers LOO feet Pasture 6335 feet Residential 3870 feet Residential and Cc==ercial 1230 feet Cc==ercial 1785 feet Industrial 950 feet TOTAL 23.h85 feet Of this total h6h0 feet of the existing right-of-way corridor actually adjoins the State Park. The proposed trans=ission line route vill be parallel to but separated fran the State Park by the existing lines corridor.
Alternate Route No. 1 Eescription An alternate to avoid the battlefield area is described as below:
3eginning at a point on the original proposed route designat'ed as Point A on the attached Exhibit "A",1.9 =iles south and scuthwest of the River 7end switch yard at the intersectica with existing Gulf State
- rover lines and pipelines right-of-way:
THENCE Northeasterly,1 =ile, more or less , with sa=e existing ~
right-of-way to an angle point; THENCE Easterly, k =iles, = ore or less, crossing Thc=pson Creek and paralleling an existing Illinois-Central Railroad right-of-way, a portion of the way to an angle point; THINCE Southerly, 219 =iles , = ore or less , to an angle point ;
THENCE Southwesterly, 2.7 =iles, =cre or less, to an intersection with the original proposed right-of-way; THENCE Easterly, .08 =iles along the original proposed right-of-way to Port Hudson Substation for a total length of 10.7 miles, and as is = ore particularly shown on the attached Exhibit "A".
L.
On these sections of Alternate No. 1, parallel and lijacent to the original preposed right-of-way, an additienal 96 feet cf right-of-way would be required. All the remaining portion of Alternate Nc.1 vculd require a new right-of-way 113 feet in viith.
Enviren= ental Costs The =ajor portion of Alternate No.1 lying east of louisiana State Highway No. 61 is presently in a residential trend area developing because of the Zachary-Baten Rouge influence. A new right-of-way across such an area vould surely present severe proble=s. This sa=e residential trend would indicate higher land values because of the s= aller areas being sold resultin8 in greater difficulty in obtaining rights-of-way. Twenty-eight percent of the alternate route vould be parallel or utilize the =ultiple right-of-way lana use principal, whereas, one hundred percent of the proposed route is a multiple use. The additicnal overall length of the Alternate No.1 (1.0 miles) as cc= pared to that of the proposed route would of course necessitate that amount of additional land being encu=bered. A lesser amount of timber would have to be re=oved frc= the alternate route as cespared to the proposed route, however, this is primarily because of the residential trend of the alternate surrounding land and the previous re=cval of the trees to allow and provide for this develop =ent.
"te alternate route vould require the cressing of one =ajor waterway which is the sa=e as the proposed route and veuld have seven road crossings as cc= pared to five en the preposed route. The additional road crossings for the alternate are again because cf the residential trend in the area and the access therefore required.
This alternalt could be ccustructed and =aintained in a manner similar to that of the proposed route and no new access reads vculd be required.
Alternate Route No. 2 Description This alternate route is described as follevs:
3eginning at a point en the original proposed route designate:1 as Point A on the attached Exhibit "A":
THCICE Southwesterly, 2.9 =11es , more or less , parallel and adjacent to an existing transmission and pipeline right-of-way to an angle point; TERICE Southerly, 2 =iles, more or less, with same existing transmission line right-of-way to an angle point; T'dENCE 'desterly, .1 =ile, more or less , with sa=e existing transmission line right-of-way to an angle point;
'IEENCE Southerly, 2.2 miles, : ore or less, with same existing trans=ission line right-of-way to an angle point ;
THENCE Southeasterly,1.h =iles, more or less, with same existing electric trans=ission line right-of-way and a railroad right-of-way to an angle point; THENCE Northeasterly, k.1 miles, more or less, crossing the Mississippi River to an angle point on the eastern or left decending bank; TEDICE Easterly, 2.7 miles, = ore or less, to the Port Hudson Substation Station for a total length of 15.h =iles, and as more particularly shcvn on attached Exhibit "A".
Those portions of Alternate No. 2 parallel and adjacent to that existing electric transtission line right-of-way would require an additional 68 feet of new right-of-ve . The re=aining portions cf Alternate No. 2 vould require the purchase of a new right-of-way 113 feet in vidth.
Environmental Costs The land use along this alternate vould approx 1=ately be the sa=e as the proposed since it is predc=inantly cultivated or pasture areas and ti=ber land. However, because of the rural residential development along the seven roadways crossed the i= pact en property values could possibly be greater as explained in Alternate No. 2. Sixty-four percent of the seccnd
alternate vould take advantage of a multiple use of right-of-way. This alternate route vould require 5.7 miles more length as conpared to the proposed route pri=arily due to crossings required of the SEssissippi River. Approxi=ately the sc=e a=cuut of ti=ber would be required to be re=cved en this alternate as cenpared to the proposed route.
Four =ajer watervay crossings vould be required en this alternate route as cc= pared to cne on the proposed route. Two of these vould be Mississippi River crossings. The northernmost of the Mississippi River crossings would be parallel and adjacent to an existing transmissien line right-of-way crossing with towers of ec= parable height. In the event of a structure failure or so=e major catastrophe affecting either crossing tower the result could be the loss of both. Either of these consequences could have serious i= pact upon the service reliability to the GSU trans=ission syste=
in the Baten Rouge area.
This alternate vould be constructed and =aintained in a =anner similar to that of the proposed and no new access roads would be required.
Conclusion In'our opinien, after evaluating the alternates routes presented herein (See Exhibit 3), the sa=e conditions still exist as when the route was originally prepcsed, and when considering the =itigating =easures to be ,
taken by Gulf States (See Exhibit C) along the proposed route its desirability is further enhanced when weighing all enviren= ental considerations.
d2
~
0 d
4 M
sen
_TA DIY.1.
COST DESCRIPTION - ALTENNATIVES A B C D E F ALTLEN.\TIVES PROPOSED ALT. 1 ALT. 2 ALT. 3 A LT. 4 A I.T . 5 lacremental canstruction Costs Basa $2.146,113 $19,125,271 $44,107.784 $438,545 $5,794.313 os os.wironrantal Report k-.crence Section 'O.9.1 N. A. N. A. N. A. N. A. N. A.
Envitannental Costs Unita HACNITUDE MACNITUDE HACNITUDE HAGNITUDE IMCNITUDE HAGNITUDE
- 1. Land Use (1:ank alternatives in terms of
.rao u n t ui conf lic t with present anJ Same as Same as Same as Sawe as planned land use) Base Proposed Proposed Proposed Creater Proposed
- 2. Property values (Kank alternativen in terms of Same as Same as Same as averags property valua along route) Base Proposed Proposed Proposed Creater Cucater
- 3. .%a .itiple Use (Rank alternative rou;es in terms of All of pro-tuvisiuncJ mesitiple use of land posed route pre-capted by rights of way) multiple right Same as Same as Same as of way use-9.66 Proposed Proposed Proposed 2.9 miles 9.8 miles miles 28% 64%
47~~iength of new 230KV line required H11es 9.66 miles 9.66 miles 9.66 miles 9.66 miles 10.66 miles 15.53 miles
- 5. Number ardt total lengt'a of new accesa and acrvice roads required NONE 2-lh miles 2-lh miles 2-lh miles NONE NONE
- 6. Numlier of road crossings 5 5 5 5 7 7
- 7. Nua.ber'af major wate ways crossings 1 1 1 1 1 4
y I. t
. s 1
e 0 3 s 1 5
. 1 2 O 0 0 0 0 0 0 0 4 9 0 O 0 1
. l T l
l .
4 CL 6 A A H
Es t
i 4
ll
) 4 2
i . 0 0 O 0 0 0 0 0 0 0 3 4 0 O 0 1 N T f L 3 A A H
y E
D l
i 3 T 5 g I 4 0 0 O 0 0 0 0 0 0 4 2 3 0 O 0 N T ,
C L 4 6 A A H
E D
U 2 T 5 T I . 0 0 O 0 0 0 0 0 0 4 2 3 0 O 0 3 N T.
'N C l 4 6 O A A C H S
E V
a T .
A E _
N D R U 1 E T 5 T I . 0 0 O 0 0 0 0 0 0 4 2 3 0 O 0 3 1 L N C T.
A 1 4 6 A A E.I - H B
AN TOIT t' I
R C
S E E D D D U E T S T I O 5 S N P 0 0 O 0 0 0 0 0 0 4 2 3 0 O 0 3 O C O .
C A R 4 6 )
H P d e
)sys
) ) fo s s s ir t e ) e cc i
n l d l e i e i pr U H s H se
( s (
o ,bm r su c aN s
e(
r a a e
s r l r
t a a
- n c e s e f i h no - m o t t at w u d i o r nos n l s r o e
&r a t r
- r a ol a c i l e H i e o fl sor f r ou sf ay e e A o
, c s meeo'd i t l e i n s a s t a d s e g "s d y sh vB e t a t e e a v d s wna -
nt i g S e sa r r e i i g rn eew t r u r aI k A e s r t i pr a i rl i e f d s A e b t s A i
,is vr c t gst e n a r n l m l e s et ana R a e n A o a i e p s ns s t s gpa eceI e t l u r o s i T B o s ee t so n w vrs n t e l A i cd t l e si s er os ol -
l i a f a t irB lu n y r s n r ia rc l ed bt yal l i n c a e l e r re C c " nn a l r e h l s o i e o d i t p e et t i a rl ur s d k i n r t t i v l e J he l f n f l f s. at o r l r t e c sr s a e e l t m
- n. oi o s o a a a e e nsluah t i
c e. i o h t l O e t
u r p o
r o ny S I W P N S HP H H S S U (C
- e. hii a e eie n t v 0 2 3 s n
n o
r b h, mn
- ui
- h h si cs g uii X mli ae nng
( i n0 Ll i1 1 2 0
1 3
0 1
4 0
1 5
0 1
6 0
1 7
0, 1
8 0
1 9
0 1
1 0,
1 31 0
1 0, 0 I
'l 0
i - 1, 1 1 w
e .
l d 9 - 0 1
ECONOMIC COMPARISON OF 230 kV LINES 352 AND 354 PORT HUDSON BATTLEFIELD CROSSING ALTERNATIVES A Study For GULF STATES UTILITIES COMPANY DUPLICATE DOCUMENT n d o s d nuo 79/O05b5%-