Forwards Suppl Updating 790911 Response to IE Bulletin 79-15 Deep Draft Pump Deficiencies. Response to Inquiries 4-6 Not Applicable
ML19262A606
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 10/22/1979
From: Weigand J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IEB-79-15, NUDOCS 7912070137
Download: ML19262A606 (2)


Text

Hursphtdys /Weigand/Derr/ Booker /Wimberley/G3 azar / Crous e/ King / Reed /Kirkebo-S&W/ Richardson

'Pov.tll,-GE/Plettman-OB&T/ Conner-CM&C/Nuc.

  • Rec'ohds-Petro /Nuc. Records-Wilson /NRC Log gc.

/Q GULF STATES UTILITIES COMPATJY PosToFF8CEBOX 2951 = BEAUMONT, TEXAS 77704 AREA C O D E 713 838 6631 October 22, 1979 ,

RBG - 6821 File G9.5 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C. 20555 lN T -QLCy y "lj\1f/py 7 Attn: Director, Division of Reactor Construction Inspection ji i

~ -" L-=ril l ;

e, 1 DCT 2 51979

Dear Sir:

l L )1 River Bend Station - Units 1 & 2 '

J Refer to: RIV Docket Nos. 50-458/I&E Bulletin 79-15 50-459/I&E Bulletin 79-15 In a letter dated September 11, 1979, Gulf States Utilities Company responded to I&E Bulletin 79-15 with the information available at that time and offered to submit a supplement to that letter to conclude our response. The initial letter con-tained responses for Unit 1 to inquiries 1, 2, and 3 which addressed the number of pumps; manufacturers', capacity, and plant application; and overall dimensions of the purnps. This supplement updates the original information as noted in the attached corrected table. Since these pumps are presently stored at our site and are not yet installed, a response to inquiries 4, 5, and 6 on summarizing the startup, testing, and routine maintenance history; operational problems and major repair efforts; and stating the longest interval that each pump has been available for operation without corrective maintenance is not applicable.

At present, a decision on the status of Unit 2 will not be made until late 1980, therefore a response with regard to Unit 2 pumps is not available.

Sincerely, f4 "W%s J. G. Weigand General Manager - Nuclear Projects mbb Attachment

-cc: Director, Region IV 1522 3J' 7912070.

, :D N (IE!!

r m. ,

i ATTACllMEt!T 1 - CORRECTED llPCS ,,

LPCS Ri!R Ho. Pumps / Unit 1 1 3 Mfg. Byron Jackson Byron Jackson Byron Jackson

  1. 0* N 'd Model 28DX18CKXL -/S 200X18.5C:0!L 20DX18. 5CKXL-3 Capacity 1505 GPM 8 2875 ft 5165 CP!! C 2 % ft 5165 GPM 6 293 ft to sizs GPM(B 725 f t 5125 GPM 8 935 fb 1

Plant Application ECCS ECCS ECCS or shutdown cooling Overall Dimension Bowl assembly & -

, 26'0" D v1 assembly &

20'E" Dowl assembly &

20 ' S,,

suction barrel suction barrel r.uction barrel g

" "" I Ction lir.charc S tio, discharr,c n '?o t

1 '8 3/8" 3

]d 1,, , 7 ,,  ;, . 7..

$ Operating Status Not installed Not indtalled Not installed 90 e

99 e