RBG-21450, Forwards Supplemental Commitment Dates Re Significant Deficiencies Identified in Insp Rept 50-458/84-35,per Util & 850614,19 & 28 Telcons.List Contains Revised Projected Completion Dates for Fuel Load

From kanterella
Jump to navigation Jump to search
Forwards Supplemental Commitment Dates Re Significant Deficiencies Identified in Insp Rept 50-458/84-35,per Util & 850614,19 & 28 Telcons.List Contains Revised Projected Completion Dates for Fuel Load
ML20235X090
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/28/1985
From: Booker J
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
RBG-21450, NUDOCS 8710190201
Download: ML20235X090 (2)


Text

._ _ ____ _ -___-

\.

A-GULF STATES UTILITIES COMPANY fuVER DEND STATION POST OFFICE BOX 220 St FRANCISVILLE. LOUT $1ANA 70775 AREA CODE 604 636-6094 346 8651 June 28, 1985 -

/ 'g l g RBG- 21450 b._..,_, _~~~~'~ kh"1" /

File Code G9.5 G9.20.6.22 -~~~-~~--.~_.,_

G15.4.1 Mr. Robert D. Martin, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspectf.on and Enforcement 611 Ryan Plaza, Suite 1000 Arlington, TX 76011

Dear Mr. Martin:

River Bend Station-Unit 1 Refer to: Region IV Docket No. 50-458/ Report 84-35 The enclosed list of Significant Deficiencies, identified in Inspection Report 84-35, contains revised projected completion dates submitted in GSU's letter dated May 17, 1985 (RBG-21034). The revised completion dates were identified to the NRC Region IV Office during telephone conversatir a beld em . June 14,19 and 28,1985. The projected completion dates support both tuel load and ascension above five percent of rated power.

Sincerely, g

J. E. Booker Manager-Engineering,

$e E3 cn Nuclear Fuels & Licensing River Bend Nuclear Group J $

C"3 JEB/h 0/ C/ df

> Cto Enclosure 0 9

cc: Mr. E. L. Jordan, Director

)

Division of Emergency Preparedness & Engineering Response '

Office of Inspection and Enforcement ,

U. S. Nuclear Regulatory Commission 8#

Washington, D.C. 20555 t\

p CM 8710190201 850628 PDR ADOCK 05000458 CJV s a PDR Q Oh

1

ft. I. >

)

l Gulf States Utilities Company. . I River Bend Station Emergency Planning Supplemental Connitment Dates on Significant Deficiencies

.' Deficiency No. Subject- .Date j 458/8435-05 Augmentation' Drill -August 16- o

. 458/8435-24 TSC Records Room Document Update Completed (June.14) 3 458/8435-25 (1) Turnover to.GSU Ventilation System Completed 1

'in TSC (June 7)

(2) Turnover to GSU Continuous Air Monitors July 12

{

(3) Appropriate Procedures for Operation 1 of Air Monitors July 12  !

458/8435-44 (1). Turnover.to GSU Fire Detection System . Completed (June 14)

River Water Make-up Structure for.

Fire Detection System August 16

.(2) Turnover to GSU Main Control Room Instrumentation used in Classifying Emergencies July 25 458/8435-46 Prompt Notification System Testing- Completed

'(May 29) 458/8435-73 Addition of Speakers to Gaitronics System . August 16

'.458/8435-84 Turnover and Testing of Security System August 16 458/8435-85 Accountability Drill . August 16' 458/8435-102 Transient Public Information Distribution August 16 l