ML20195C237
| ML20195C237 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 04/11/1986 |
| From: | William Cahill GULF STATES UTILITIES CO. |
| To: | Maritn R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20195C231 | List: |
| References | |
| NUDOCS 8605300180 | |
| Download: ML20195C237 (2) | |
Text
ski)
SAFEGUARDS INFORh!ATION GULF STATES UTILITIES COMPANY RIVER Bf ND STAflON POST OFFrCE 80x 220
$T FRANCISVILLE. LOUISIANA 70775 ARE A CODE 504 635 6094 346 8651 April 11, 1986 RBG-23510 File Nos. G9.5, G15.4.1 Mr. Robert D. Martin, Regional Administrator a
g g I
U.S. Nuclear Regulatory Commission 5
Region IV 611 Ryan Plaza Drive, Suite 1000 1
APR I 5 E Arlington, TX 76011
.[
l u
Dear Mr. Martin:
+
_ -..a River Bend Station - Unit 1 Refer to:
Region IV Docket No. 50-458/ Report 86-03 As discussed with Mr.
J.
P. Jaudon of your staff on April 10, 1986, this letter is being provided at this time in response to the Notice of Violation contained in NRC I&E Inspection Report No. 50-458/86-03.
The inspection was performed by Mr.
R.A.
Caldwell during the period January 7-10, 1986 of activities authorized by NRC Operating License NPF-47 for River Bend Station Unit No.
1.
Gulf States Utilities Company's (GSU) response to the Notice of Violation, " Failure to Meet a
Security Plan Requirement",
is provided in the enclosed attachment.
In accordance with 10CFR73.21, information contained in the attachment has been determined to contain safeguards information.
This completes GSU's response to the Notice of Violation.
Sincerely, a
J. Cahill, r.
Senior Vice President River Bend Nuclear Group
.h hM WJC/DLD/ERoy@JHM/je
^
Attachment TilIS LETTER NOT SUBJECT TO h h 00 458 PROTECTIVE REQUIREh!ENTS WilEN c
_. ARATED FR0h! SIATERIAL CONTAINING SAFEGUARDS INFORMATION.
0/g g SAFEGUARDS INFORh!ATION gL
b tiWITED STATES OF AMERICA MUCLEAR REGUIATORT C(StGSS10ll STATE OF IAUISIANA 5
PARISE OF WEST FN11CIANA 5
In the Matter of 9
Docket Nes. 50-458 CULF STATES UTILITIES C60tPANY 5
(River Bend Station.
Unit 1)
's W.
J.
- Cahill, Jr.,
being duly sworn, states that he is a Senior i
Vice President of Gulf Stat.es Utilities Company; that he i.e authorised on the part of said Company to sign and file with the Nuclear Rggulatory Commission the documents attached heretog.and that 411 such documents are true and correct to the best of his knowledge, information and belief.
a W. g Cahill, Jr.
/' ~
Subscribed and sworn t'o before me, a Notary Public in and for the
[)r / !,19 f.
~
State and Parish above named, this day of,
/
r0 Etu h
'Vb E r w W
/Joan W. Middlebrc4km
- j/' Notary Public in.and for West Feliciana Parish, i
l Louisiana My'Conssission is for Life.
l I
w w
p.
p