Confirms Telcon W/R Everett Re Required 6-month Delay in Submittal of Addl Info Re Environ Assessment of Culvert Crossing Alligator Bayou.Will Submit Hydrology Study & Mitigating Action Plan by 790201
ML19305A250
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 12/15/1978
From: Humphreys L
GULF STATES UTILITIES CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19305A249 List:
References
RBG-5970, NUDOCS 7903080542
Download: ML19305A250 (1)


Text

/ e . ,

e

  • g22

--- - - . - - ---s --

POST OPPiCE BOX 2951 . 8EAUMONT. TE XA S 77704 A R EA CODE 7 1 3 838- 6631 December 15, 1978 RBG - 5970 File No. G9.5 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Cormission, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Dear Mr. Seidle:

River Bend Station Units 1 & 2 Docket Hos. 50 h56 and 50 h59 Allicator Bayou Crossinc This letter is to confirm a conversation between Mr. W. J. Reed of Gulf States Utilities and Mr. R. Everett of your staff regarding a six week delay in the submittal of information with respect to the Gulf States Utilities on-going environmental assessment of the culvert crossing over Alligator Bayou. As a result of additional time required for verification of the hydrology model and the need to explore in more detail various mitigating action alternatives, the additional hydrology study and a mitigating action plan requested by the Nuclear Regulatory Commission in Audit Report 78-Oh will be submitted by February 1, 1979 Sincerely, L. L. Humphreys Senior Vice President Energy Development 79030809t>