ML20126C540
| ML20126C540 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 02/01/1980 |
| From: | Weigand J GULF STATES UTILITIES CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20126C544 | List: |
| References | |
| RBG-7189, NUDOCS 8004040056 | |
| Download: ML20126C540 (1) | |
Text
.
l[0 6
w i
GULF STATES UTILITIES COMPANY POST CFFtCEBOX 2951 BEAUMONT TEXAS 77704 AREA COoE 713 838 6631
[
}
February 1, 1980 RBG -
7189 i
File No. G9.5 i
i Mr. Karl V. Seyfrit, Director U. S. Nuclear Regulatory Commission
[
Region IV 611 Ryan Plaza Drive I
Suite 1000 Arlington, TX 76011
Dear Mr. Seyfrit:
l i
River Bend Station Units 1 & 2 Docket Nos. 50 h58, 50 h59 1
References:
- 1) July 12, 1979 letter Weigand (GSU) to Seyfrit
- 2) September 12, 1979 letter Weigand (GSU) to Seyfrit
- 3) November 12, 1979 letter Weigand (GSU) to Seyfrit In the above referenced letters (1-3), Gulf States Utilities i
has notified and informed the NRC Region IV Office of Inspection
[
and Enforcement of the progress toward resolution of a reportable i
10CFR 50.55(e) deficiency concerning the manufacturing of the containment-to-embedment-plate "T" welds. Attached to this letter e!
are the results of the Stone and Webster (S&W) and Graver Energy l
Systems, Inc. (Graver) assessments of the deficiency.
Gulf States l
Utilities has committed to rework the questionable veld areas as i
the final resolution to this deficiency.
This concludes our res-ponse to this deficiency.
Sincerely, j
N i
7 G. Weiga Vice President Operations and Technical Systems i
JGW/WJR/mb attachment l
i i
ec:
Office of Inspection and Enforcement
[
f 8004040
._