Responds to IE Bulletins78-12A & 12B.Forwards Complete Response,Including Info Re Search of Records of Manufacturer for Atypical Weld Matl & Verification & Identification of Weld Filler Matl
ML19256B600
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 06/15/1979
From: Weigand J
GULF STATES UTILITIES CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
G9.5, NUDOCS 7908090527
Download: ML19256B600 (10)


Text

.

. h O

rn t n39W G^ t -

L.sel &: t GULF STATES UTILITIES CORIPRNY p,  : T orreCF aOX 29S1 BEAUMGNT. TFXAS 7 7 7 0 t.

AREA COOC 7 i3 8 3 t3 *> C 3 1 June 15,1979 RBG - 6h90 File G9.5 Mr. Karl V. Seyfrit , Director Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011

Dear Mr. Seyfrit:

River Bend Station, Units 1 & 2 Docket Mos. 50 458 & 50 h59 Our letter of May 25, 1979 indicated to you that a com-plete response to IE bulletins78-12A and 12B could be expected by September 30, 1979 Our examination of this issue is now complete.

As requested in itenc 1 and 2 of Bulletin 78-12, a search of the records of car vessel manufacturer (Chicago Bridge and Iron Nuclear ) has been conducted for atypical weld material on River Bend 1 an/. 2. This information has been supplied to your Mr. G. vl . Reinmuth, of the Reactor Construction Inspec-tion Division in Bethesda, Maryland by W. G. Oehlkers, UCfs Coordinator, CBI Uuclear Company, in his May 1, 1979 letter.

Sec attachment 1 for River Bend Unit 1 and attachment 2 for

}g }g[

River Bend Unit 2. IE Bulletin 78-12A item 2 required the licensee to verify that the information supplied in response to 78-12 is the specific information required for his vessels. This verification has been accomplished as outlined in attachment 3 1 and 2.

7 9 0 8 0 9 0 5Gh'7 ,

Item 3 of 78-12 required identification of weld filler material not conforming to procurement specifications based on verification tests, i.e., mechanical and chemical properties.

You will note in attachments 1 and 2 that no nonconforming material was found for either River Bend 1 or 2. Therefore, item 3 of 78-12 requires no further response.

Item h requested information on the availability of archive weld material for verification purposes. We have been informed that no archive weld material is available from CBI Huclear for the River Bend vessels. We do not feel this archival material is required, due to all material conforming to specification as outlined in attachments 1 and 2.

This concludes our examination and verification effort for veldment material on River Bend Units 1 and 2.

Sincerely,

., N G. Weigand General Manager - Iuclear Projects Attachments JWL/mb i

L

N .?

ATTACHMENT 1 835 299

" " " " ^ " " " " " "

GEN ER AL @ ELECTRIC ENGINEERING GENERAL ELECTRIC COMPANY,175 CURTNER AVE., SAN JOSE, CALIFORMA 95125 DIVISION May 11, 1979 H. D. Powell, Manager River Bend Project General Electric Company 175 Curtner Ave.

San Jose, CA 95125

Subject:

RESPONSE TO NRC IE BULLETIN N0. 78-12,78-12A and 78-128

Reference:

Reactor Pressure Vessel: River Bend I Gentlemen:

In compliance with subject bulletin, General Electric NEBG requested Chicago Bridge and Iron Nuclear Company (CBIN) to conduct a records investi-gation of low alloy, high tensile weld deposits used in all reactor pressure vessels built in their, or their supplier's, facilities.

The purpose of this investigation was to identify any other atypical weld deposit similar to the one described in Bulletin 78-12.

T, response to our request, CBIN has prepared a report and submitted it to t; e NRC, as evidenced by the attached letter dated May 1,1979. The report contains the attached certification dated 4/30/79.

We have reviewed CBIN's repor;. to the NRC and have not found any discrepan-cies. Consequently, we concur with their certification and conclude that it is very unlikely that other, similar conditions (i.e. , atypical weld deposits) exist in any reactor pressure vessel welds.

CBIN, in a separate communication to us, has stated that they do not have any archive material. Consequently, we are requesting that you review your inventory and advise the NRC accordingly (Bulletin 78-12, Item 4).

We recommend that you use this letter and the attached certificction to satisfy the NRC request for verification of the generic search as outlined in IE Bulletin 78-12, Item 2.

Ver 'ruly yo ,

V i j-fr rNerd[-CoiinT Ea~ger . , pJ Quality Control Engineering Vessels, Internals & Heat Exchangers 837 M/C 731 - Ext. 56751 gs

. g . . .. ,

,o May 1, 1979 U. S. Nuclear Regulatory Commission Attn: Mr. G. W. Reinmuth, Assistant Director Muclear Regulatory Committee Reactor ionstruction Inspection Division Bethesda MD 20555 RE: WELD WIRE DATA REPORT REOUIRED BY NUCLEAR REGULATORY BULLETIN 78-12, DATED 9/29/78 AND SUPPLEMENT 78-12A, DATED 22/14/78 Gentlemen:

Enclosed is the CDI Nuclear Co. report required by the referenced NRC Bulletin 78-12. This report covers the following reactor vessel as indicated below:

CDIN C.E. CBIN G.E.

CONTRACT ? PROJECT CONTRACT # PROJECT 72-2046 LaSalle II 73-C119 TVA X17 72-2505 Hope Creek II 73-C120 Allens Creek I 72-2647 Hanford II 73-Cl21 TVA X19

  • 72-C102 Nine Mile II 73-Cl23 TVA X18 73-C108 Perry I 73-Cl25 Skagit I 73-C109 Grand Gulf I 74-Cl27 TVA X20 73-C110 Grand Gulf II 74-C129 River Bend II 73-C112 River Bend I 74-Cl31 TVA X21 73-Cll4 Perry II 74-C132 TVA X22 Should you have any questions, please do not hesitate to call.

Very truly vaurs, g

/

D W. G. Gehlhers b g_

MOA Coordinator ' lf YlGO:pwg g c() }-

  1. 93 1q0 g$$ 3gj

/-

s LCLEAR OMPANY 2700 CH ANNEL AVENUE / MEMPHIS. TENNESSEE 38113 / (901] 947-3111 The documentation and information regoired by NRC Bulletins 78-12 and 78-12A for CBIN CONTRACT #73 -C112 Vessel River. Bend I are contained in the attached report.

Welding consumables were re-reviewea against the original require-ments in accordance with the above listed documents. No deviations '

were found. s. _

Based upon our records, I certify, to the best of my knowledge, this report is correct.

W. G.

Oehlkers h ~)~0*

Date f

NQA Coordinator .

CBI Nuclear Company e

9 A

%' 'I i'*' iP*TilN ^

-;. ,' W _ j

ATTACED19;y g 836 303

"" '"^" """" Y G E N E R A L (') E LE CT R I C ENGINEER!NG GENERAL ELECTRIC COMPANY,175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 DIVISION May 11, 1979

11. D. Powell , flanager River Bend Project General Electric Company 175 Curtner Ave. "

San Jose, CA 95125

Subject:

RESPONSE TO NRC IE BULLETIN NO. 78-12,78-12A and 78-12B

Reference:

Reactor Pressure Vessel: River Bend II Gentlemen:

In compliance with subject bulletin, General Electric NEBG requested Chicago Bridge and Iron Nuclear Company (CBIN) to conduct a records investi-gation of low alloy, high tensile weld deposits used in all reactor pressure vessels built in their, or their supplier's, facilities.

The purpose of this investigation was to identify any other atypical weld deposit similar to the one described in Bulletin 78-12.

In response to our request, CBIN has prepared a report and submitted it to the NRC, as evidenced by the attached letter dated May 1,1979. The report contains the attached certification dated 4/30/79.

We have reviewed CBIN's report to the NRC and have not found any discrepan-cies. Consequently, we concur with their certification and conclude that it is very unlikely that other, similar conditions (i.e., atypical weld -

deposits) exist in any reactor pressure vessel welds.

CBIN, in a separate communication to us, has stated that they do not have any archive material. Consequently, we are requesting that you review your inventory and advise the NRC accordingly (Bulletin 78-12, Item 4).

We recammend that you use this letter and the attached certification to satisfy

- the NRC request for verification of the generic search as outlined in IE Bulletin 78-12, Item 2.

Very truly you .4, 1

.,.  ? /

3,

,;  :/ i ,

Werner Cohrr,~MaWager Quality Control Engineering Vessels, Internals & Heat Exchangers , 4

.b, S M/C 731 - Ext. 56751 830 gs

'..t f May 1, 1979 U. S. Nuclear Regulatory Commission Attn: Mr. G. W. Reinmuth, Assistant Director Duclear Regulatory Committee Reactor Construction Inspection Division Bethesda MD 20555 RE: WELD WIRE DATA REPORT -

REOUIRED BY UUCLEAR REGULATORY BULLETIN 78-12, DATED 9/29/78 AMD SUPPLEMENT 78-12A, DATED 22/14/78 Gentlemen: _

Enclosed is the CDI Nuclear Co. report required by the referenced NRC Bulletin 78-12. This report covers the following reactor vessel as indicated below:

CDIN G.D. CBIN G.E.

COUTRACT # PROJECT COMTRACT A PROJECT 72-2046 LaSalle II 73-C119 TVA X17 72-2505 nope Creek II 73-C120 Allens Creek I 72-2647 Hanford II 73-Cl21 TVA X19 '

72-C102 Mine Mile II 73-C123 TVA X18 73-C108 Perry I 73-Cl25 Skagit I 73-C109 Grand Gulf I 74-Cl27 TVA X20 73-C110 Grand Gulf II 74-Cl29 River Rend II 73-C112 River Bend I 74-C131 TVA X21 73-Cll4 Perry II 74-Cl32 TVA X22 Should you have any questions, please do not hesitate to call.

Very truly yours,

}QS W. G. Gehlkers hh D HOA Coordinator @

7/GO : pwg

'T : 93

/ 1907070%L

.c .

UCLEAR OMPANY 2700 CH ANNEL AVENUE / MEMPHIS. TENNESSEE 38113 / 1901] 947 3111 The documentation and information required by NRC Bulletins 78-12 and 78-12A for CBIN CONTRACT #74-C129 Vessel River Bend II are contained in the attached report.

s Welding consumables were re-reviewed against the original requi ce-ments in accordance with the above listed documents. No deviations were found.

Based upon our records, I certify, to the best of my knowledge, this report is correct.

W.

b G. Oehlkers hO _ hDateh0' 'f f ,

NQA Coordinator CBI Huclear Company J

835 306 0 .

M. *. \ G .h

.