ML20207P882

From kanterella
Jump to navigation Jump to search
Requests That Distribution of Encl Info Re 870225 Emergency Planning Exercise Scenario Be Limited to Listed Individuals. W/O Encl
ML20207P882
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/09/1987
From: Booker J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
RBG-25207, NUDOCS 8701200366
Download: ML20207P882 (2)


Text

,-

. X) l GULF STATES UTILITIES COMPANY RIVER BENO STATION POST OFFICE BOX 220 ST FRANCISVILLE. LOutStANA 70775 AREA CODE 504 635-6094 346-8651 January 9, 1987 RBG - 2 5 2 07 File Nos. G9.5, G9.20.6 U. S. Nuclear Regulatory Cmmission Document Control Desk Washington, D.C.

20555

Dear Sir:

River Bend Station - Unit 1 Docket No. 50-458 In accordance with your letter dated February 9, 1984, Gulf States Utilities Capany (GSU) is subnitting the February 25, 1987, Bnergency Planning exercise scenario.

'Ihe scenario package contains exercise objectives, observer information, narrative sunmary, onsite and offsite messages including expected player actions and radiological information.

GSU requests that distribution of the attached information be limited to only those Nuclear Regulatory Cmmission evaluators observing the exercise.

This will maintain the confidentiality of the February 25, 1987 exercise scenario. For this reason, only the following individuals are being provided the scenario attachment:

Mr. J. D. Jamison (2 copies)

Battelle-PNL 2955 cmrga Washington Way Richland, Washington 99352 Mr. E. L. Jordan, Director Division of Bnergency Preparedness and Engineering Response Office of Inspection & Enforcement U. S. Nuclear Regulatory Ca missian Washington, D.C.

20555 Mr. Nemen Terc (2 copies)

Bnergency Preparedness Analyst, Regional 'Ibam Ieader U. S. Nuclear Regulatory Cm mission

[OY[

Region IV I fl 611 Ryan Drive, Suite 1000 Arlington, TX 76011 8701200366 870109 L

fDR ADOCK 05000458 PDR

After the exercise, distribution may be disseminated to the appropriate individuals and the designated Public Document Roczns.

Any modifications to this scenario will be provided to the NRC observers at the February 24 controller / evaluator briefing.

Sincerely, hhet k J. E. Bcaker Manager-River Bend Oversight River Bend Nuclear Group JEB/

do Attachment cc:

U. S. Nuclear Regulatory Ccanission (2 copies)-without attaehments Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Senior Resident Inspector-without attachments U. S.' Nuclear Regulatory Ccenission P. O. Box 1051 St. Francisville, IA 70775 f

i e

I 1

_m.

_.-_..m.--....m.

,, -