ML20004B009

From kanterella
Jump to navigation Jump to search
Advises That Response to IE Bulletin 80-21 Will Be Provided Pending Completion of Investigation by NSSS Vendor (Ge). Submittal Estimated for 810602
ML20004B009
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 04/22/1981
From: Draper E
GULF STATES UTILITIES CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-80-21, NUDOCS 8105270103
Download: ML20004B009 (1)


Text

-

GULF STA.TES UTILITIES COMPANY BEAuv0N*

  • g=As-?

4 aOS~ O***CE80x 295i AREA COOE 7.3 9383P43 April 22, 1981 RBG - 10,167 Files G9.5, G9.33.1 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Ccmmission Region IV, Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Dear Mr. Seyfrit:

River Bend Station - Unita 1 & 2 Refer to: RIV Docket Nos. 50-458/I&E Bulletin 80-21 50-459/I&E Bulletin 80-21 The investigation being performed by our NSSS Vendor (G.E.) on I&E Bulletin 80-21 is not yet complete.

It is currently estimated that our final response will be sent by June 2,1981.

at that time all correspondence required for I&E Bulletin 80-21 will be coepleted.

Sincerely, E.L. Draper, Jr.

1 Vice President - Nuclear Technology ELD /RJK/cb cc:

U.S. Nuclear Regulatory Comission Office of Inspection & Enforcement Division of Reactor Construction Inspection Washington, D.C.

20555 b

VO

\\

l 9 1 1 F '/ 7 6 1 0 3

.