Responds to NRC Re Violations Noted in Insp Rept 50-458/87-11.Corrective Actions:Temporary Change Notice 87-0343 Issued to Correct STP-511-8208 to Agree W/Offsite Dose Calculation Manual Methodology
ML20234F046
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/30/1987
From: Deddens J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RBG-26187, NUDOCS 8707080085
Download: ML20234F046 (4)


Text

!

o )

GULF STATES UTILITIES COMPANY RIVER BEND SY ATION POST OFFICE BOX 220 5.f FRANCISVit.LE, LOUISlANA 70775 j

AREA CODE 504 635 6094 346 B651 I

l June 30 1987 RBG 26f87 File No. G9.5, G15.4.1 U. S. Nuclear Regulatory Commission-Document Control Desk Washington, D. C. 20555 Gentlemen:

River Bend Station - Unit 1 Refer to: Region IV {

Docket No. 50-458/ Report 87-11 . _ _ l This letter responds to the Notice of Violation contained in NRC Inspection Report No. 50-458/87-11. The inspection was' performed by Dr. J. B. Nicholas during the period April 13-17, 1987 of activities authorized by NRC Operating License NPF-47 for River Bend Station. (

Gulf States Utilities Company's (GSU) response to Notice of Violation 8711-01, " Failure to Use Offsite Dose Calculation Manual (ODCM) Methodology to Project: Doses", is provided in the enclosed attachment pursuant to 10CFR2.201. This completes GSU's i l response to this item. l Sincerely, J. C. Deddens Senior Vice President River Bend Nuclear Group JCD/ER / /JWC/ehs Attachments cc: U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drivo, Suite 1000 Arlington, TX 76011 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 1051 St. Francisville, LA 70775 8707080085 070630 PDR G

ADDCK 05000458 PDR

[o/

INITfD STMES T NERICA NUCMAR RBOLHA'IORY CDMISSICN STME & IDUISIANA

  • PARISH T MEST FELICIANA
  • 1 In the Matter of
  • Docket Nos. 50-458 1 GHF STMES IFFILITIES CIMPANY
  • l l (River Bend Station, Unit 1)

A wInhv1T J. C. Deddens, being duly sworn, states that he is a Senior Vice President of Gulf States Utilities Canpany; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory

.I Cm mission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.

/k < bed J. C'. Deddens l 1

1 Subscribed and ssorn to before me, a Notary Public in and for the State and and Parish above named, this day of /7C , 19 J 44 . .O /

gJoan W. Middlebrooks

Notary Public in and for West Feliciana Parish, louisiana My Camtission is for Life.

I l

ATTACHMENT RESPONSE TO NOTICE OF VIOLATION 50-458/8711-01 LEVEL V I

REFERENCE Notice of Violation - J. E. Gagliardo le'ter to J. C. Deddens, dated May

^

t 29, 1987. -

FAILURE TO USE ODCM METHODOLOGY TO PROTECT DOSES s Technical Specification 3/4.11.1.3 states that doses due to liquid l releases to unrestricted areas shall be projected in accordance with the )

methodology and parameters in the ODCM. This requirement is implemented by the use of Surveillance Test Procedure (STP)-511-8208. {

Contrary to the above, the NRC inspector determined on April 15, 1987, that the calculations performed using the format in STP-511-8208 during the period July 1986 through March 1987, did not agree with the methodologies specified in the ODCM.

This is a Severity Level V violation.

REASON FOR THE VIOLATION:

Personnel error was determined to be the reason for this oversight. A change to STP-511-8208 was drafted in conjunction with the ODCM revision but not issued for revision and approval. Personnel in Radiological Engineering did not follow up on the change to ensure it was incorporated.

CORRECTIVE STEPS WHICH HAVE BEE 7 TAKEN AND THE RESULTS ACHIEVED:

Temporary Change Notice (TCN) Number 87-0343 was submitted on 4/16/87 and approved on 4/21/87 to correct STP-511-8208 to agree with the ODCM methodology.

Comparisons of the two calculational methods were performed for the period since the ODCM method was changed. Using the less conservative STP methodology, entrance into the Technical Specification 3/4.11,1.3 action statement was required in July and October 1986. Using the ODCM methodology, two additional months - November 1986 and January 1987, required entrance into the action statement. A review of radioactive releases during these months indicated that all releases were treated via the radioactive waste treatment system prior to their discharge as required under Technical Specification 3/4.11.1.3.

CORRECTIVE STEPS WHICH HAVE BEEN TAKEN TO AVOID TURTHER VIOLATIC,NS The ODCM/ Procedure revision log (Attachment I to RSP-008) will be revised to incorporate a sign-off by the Radiological Engineering Supervisor or his designee to review, for applicability, any change (s) to lower tier implementing procedures with regard to ODCM revisions. This should assure revisions and changes are implemented as appropriate.

1

DATE VHEN FULL COMPLIANCE WILL BE ACHIEVED STP-511-8208 has been revised (TCN 87-0343) and approved on 4/21/87.

The RBS dose projection procedures are in compliance with the current ODCM methodology.

The ODCM/ Procedure revision log vill be revised by August 14, 1987, l