ML23355A081

From kanterella
Jump to navigation Jump to search

International - Withdrawal of HI-STORM FW Multipurpose Canister Storage System Amendment 9
ML23355A081
Person / Time
Site: 07201032
Issue date: 12/21/2023
From: Elisio D
Holtec
To: Yen-Ju Chen
Office of Nuclear Material Safety and Safeguards, Document Control Desk
References
5018112, CAC 001028, EPID L-2022-LLA-0027
Download: ML23355A081 (1)


Text

HOLTEC Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 INTERNATIONAL December 21, 2023 Yen-Ju Chen, Sr. Project Manager Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 CAC No. 001028, EPID No. L* 2022* LLA.0027

Subject:

Withdrawal of Hl*STORM FW Multipurpose Canister Storage System Amendment 9

Reference:

[1]

"HI-STORM FW Amendment 9 Request," letter from D. Elisio (Holtec) to Y.

Chen (NRC) dated February 17, 2022. ADAMS Accession Number ML22048C22 l.

[2]

"HI-STORM FW Multipurpose Canister Storage System Amendment 9 OBS Responses," letter from D. Elisio (Holtec) to Y. Chen (NRC) dated March 13, 2023.

ADAMS Accession Number ML23072A427.

[3]

"Amendment No. 9 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System -

Request for Additional Information," letter from Y. Chen (NRC) to D. Elisio (Holtec) dated October 4, 2023.

ADAMS Accession Number ML23229A515.

[4]

"Schedule for Responses to HI-STORM FW Amd. 9 Requests for Additional Information," letter from D. Elisio (Holtec) to Y. Chen (NRC) dated October 16, 2023.

ADAMS Accession Number ML23289A2 l 3.

Dear Ms. Chen:

Holtec separated the proposed reorganization of the HI-STORM FW CoC changes submitted as part of LAR-7 into a new LAR-9 on February 17, 2022 [ l ]. Subsequently the NRC staff accepted Amendment 9 for review and documented several observations. Holtec submitted observation responses on March 13, 2023 [2]. By letter dated October 4, 2023 [3], NRC staff documented requests for additional information (RAls). Hallee understands that this information is necessary to continue review of Amendment 9 and Holtec conveyed plans to postpone responding to the Amendment 9 RAis until the Amendment 7 CoC is finalized on October 16, 2023 [4].

Document ID 5018112 Page I of 2

HOLTEC INTERNATIONAL Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Holtec herewith withdraws the HI-STORM FW Amendment 9 LAR. Holtec thanks the NRC for their review efforts concerning this LAR. However, at this time, Amendment 9 does not constitute enough value to Holtec or its clients to warrant continued use of NRC/Holtec resources. This letter contains no new commitments and no revised regulatory commitments.

If you have any questions, please contact me at 856-797-0900 ext. 3326.

Sincerely, Denise Elisio Licensing Engineer, Holtec International cc:(via email)

Yoira Diaz-Sanabria (USNRC)

Shana Helton (USNRC)

Kimberly Manzione (Holtec)

Jean Fleming (Holtec)

Document ID 5018112 Page 2 of2