Letter Sequence Response to RAI |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2021-LLR-0069, Proposed Alternative to the ASME Code, NG-4230 Tack Welds, Docket 72-1004, CoC 1004, for Recent Amendments (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI 2018-01-11
[Table View] |
Tn Americas, LLC - Response to Request for Additional Information - Proposed Alternative to the ASME Code, NG-4230 Tack Welds for Renewed Certificate of Compliance No. CoC 1004, Amendment Nos. 13, 14, 15, 16 and 17| ML21323A057 |
| Person / Time |
|---|
| Site: |
07201004 |
|---|
| Issue date: |
11/19/2021 |
|---|
| From: |
Narayanan P Orano TN Americas, TN Americas LLC |
|---|
| To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards |
|---|
| References |
|---|
| CAC 001028, E-59930, EPID L-2021-LLR-0069 |
| Download: ML21323A057 (7) |
|
Text
Orano TN 7160 Riverwood Drive Suite 200 Columbia, MD 21046 USA Tel: 410-910-6900 Fax: 434-260-8480 November 19, 2021 E-59930 U. S. Nuclear Regulatory Commission Director of the Office of Nuclear Material Safety and Safeguards Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852
Subject:
Response to Request for Additional Information - Proposed Alternative to the ASME Code, NG-4230 Tack Welds for Renewed Certificate of Compliance No. CoC 1004, Amendment Nos. 13, 14, 15, 16 and 17 (Docket No. 72-1004, CAC No. 001028, EPID:L-2021-LLR-0069)
Reference:
Letter from Christian Jacobs (NRC) to Prakash Narayanan (TN Americas LLC), Proposed Alternative to the ASME Code, NG-4230 Tack Welds for Renewed Certificate of Compliance No. CoC 1004, Amendment Nos. 13, 14, 15, 16 and 17 (Docket No. 72-1004, CAC No. 001028, EPID:L-2021-LLR-0069) - Request for Additional Information, dated November 3, 2021 TN Americas LLC (TN) hereby submits our response to the Request for Additional Information (RAI) forwarded by the letter referenced above. Enclosure 1, herein, provides the responses to the RAI. Enclosure 2 provides an updated proposed code alternative table entry as a result of our RAI responses.
Should you have any questions regarding this submittal, please do not hesitate to contact Mr. Douglas Yates at 434-832-3101 or me at 410-910-6859.
Sincerely, Prakash Narayanan Chief Technical Officer cc:
Christian Jacobs (NRC-DFM)
- RAIs and Responses : Proposed Code Alternative Table Entry
RAIs and Responses to E-59930 Page 1 of 5 Materials RAIs:
RAI-1
Provide additional information on how the mockup coupons will adequately represent the production welding set-up and how the applicant will account for variation in tack weld profiles, root opening, and defect orientation.
The applicant states that tack welds are used during fit-up and alignment of the welded components of the R45 transition rails and use of tack welds is standard practice for keeping parts closely together while completing the first pass or the root pass of a production weld. The NRC staff is unclear how the length of the Procedure Qualification Record (PQR) mockup coupons with respect to length of the actual transition rail component will adequately represent production welding (i.e., number of tack welds, size of tack welds, and gap between the tack welds.)
The applicant states that three coupons will be produced for each joint geometry to account for variations in joint design and a tack will be broken to prepare the coupon for PQR. Since the tacks weld are made manually, there will be variation in the tack welds from welder to welder. In addition, there will be variations in the defect orientations. The staff is unclear how the applicant will account for these variations in their mockup coupons.
The applicant states that an additional PQR shall be prepared in accordance with ASME Section IX with coupons that were produced with three broken tack welds per coupon at fit-up.
The staff is unclear about the intent of this PQR and its applicability.
This information is needed to determine if it meets the requirements of Part 72 of Title 10 of the Code of Federal Regulations (10 CFR) 72.236(b) and 72.158.
Response to RAI-1:
The intent of introducing defective tack welds in PQR coupons is to demonstrate that the mechanical strength of the welding process continues to be acceptable by destructively testing the coupons per American Society of Mechanical Engineers (ASME)Section IX requirements.
TN Americas LLC (TN) does not see the need to complete a mockup that is the full length of the R45 transition rail, as there is no practical means to destructively test a full length R45 transition rail. For this reason, TN is proposing to mechanically test coupons.
The NRC is correct that variation exists from welder to welder, and the tack welds will have some variation. However, TN believes that simulating a fully broken tack weld will provide the bounding defect for the welding process to repair during the root pass. The welding process must demonstrate that it has sufficient depth of penetration to re-fuse through the entire tack, and thus any variation in how each welders tack weld may contain defects will not challenge the demonstration.
TN is proposing to use the standard qualification requirements from ASME Section IX for establishing the testing requirements of the coupons with broken tack welds. The intent of these PQRs is to establish and qualify the controlling parameters of the Welding Procedure Specification (WPS) that ensure the acceptable mechanical properties are met during production welding.
RAIs and Responses to E-59930 Page 2 of 5 Impact:
No change as a result of this RAI.
RAIs and Responses to E-59930 Page 3 of 5
RAI-2
Please provide additional information on the process of addressing defective tack welds for removal or repair.
The applicant states that defective tack welds shall either be removed or repaired in the process of fit-up and alignment. The staff is unclear if repairs are done by manual tack welding independent of the automated welding or mechanized welding process.
In addition, the staff is unclear how the defective tack welds are tracked for removal or repair, and the process that is followed to address the defective tack welds before the component is deemed ready for the root/first pass using an automated/mechanized welding process. A defect found by a qualified visual inspector is generally tracked and reexamined post removal and/or repair. Such repairs may be documented, and that area of the weld should be scrutinized with additional nondestructive examination (NDE) after the final weld is completed.
This information is needed to determine if it meets the requirements of 10 CFR 72.236(b) and 72.158.
Response to RAI-2:
In the context of this request for R45 transition rails, currently the tack welds are made by a manual process only. TN believes that any future fabricators of the R45 transition rails would also use a manual process for tack welding the parts together. The ASME code does not prohibit tack welding by an automated or mechanized welding system, but from a practicality standpoint tack welding is typically performed by a manual process.
Travelers (work instructions) for the manufacturing of the R45 transition rails have an operation for a qualified inspector to perform the visual test (VT) of the tack welds prior to the start of the root pass by the operator. The qualified inspector is required to issue a VT report to document the results of the inspection. The inspector generates a nonconformance report (NCR) for defective tack welds and the condition is processed in accordance with TNs control of nonconforming condition procedures. The weld operator is not permitted to start the root pass until the NCR is closed and the inspector has closed the preceding operation of the traveler.
Impact:
No change as a result of this RAI.
RAIs and Responses to E-59930 Page 4 of 5
RAI-3
Please provide additional details for the acceptance criteria for the visual examination to be performed by the welder and or welding supervisor. In addition, please provide additional details on how the visual inspection of the welds will be documented.
The applicant proposed alternative allows a non-qualified inspector (welder or weld supervisor) to check the tack welds for defects. However, it is unclear what acceptance criteria will be used for this visual examination. In addition, it is unclear if inspection of the welds will be documented to verify quality.
This information is needed to determine if it meets the requirements of 10 CFR 72.236(b),
72.158, and 72.168.
Response to RAI-3:
The acceptance criteria used by the welder and/or welding supervisor would be the same.
Paragraph NG-4231.1 requires tack welds to be visually examined in accordance with NG-5261 and defective tack welds to be removed. Paragraph NG-5361 provides acceptance standards (a) and (b) shown below.
(a)
Weld reinforcement, underfill, undercut, and overlap shall not exceed the allowable limits of this Subsection.
(b)
The examined surface shall be free of abrupt irregularities.
The acceptance of the tack welds by the welder and/or welding supervisor shall be documented by the completion of an operation in the manufacturing traveler. No visual testing (VT) report will be generated.
Impact:
The Proposed Code Alternative Table Entry has been updated as a result of this RAI. The first sentence in the 2nd paragraph of the last column has been clarified regarding omitting the use of a qualified inspector. Additional requirements item 1 was also revised to refer to NG-4231.1.
RAIs and Responses to E-59930 Page 5 of 5
RAI-4
Please provide additional information to add clarity for the applicability for NB-4123 and NB-4423.
Applicants request for a code alternative pertains to subsection NG. In Subsection NG, NG-4123 and NG-4423 are similar to NB-4123 and NB-4423 respectably. The staff is unclear the applicability of the reference to NB-4123 and NB-4423.
This information is needed to determine if it meets the requirements of 10 CFR 72.236(b).
Response to RAI-4:
TNs intent of citing NB-4123 and NB-4423 was to show that portions of the ASME code have already eliminated the need for qualified inspectors performing VT examinations of tack welds.
The paragraphs have no applicability to the R45 transition rails, as the R45 transition rails are classified as NG components. The information was provided to justify the code alternative only.
Impact:
No change as a result of this RAI.
to E-59930 Proposed Code Alternative Table Entry Reference ASME Code Section/Article Code Requirement Alternatives, Justification and Compensatory Measures NG-4231.1 Tack welds used to secure alignment shall either be removed completely, when they have served their purpose, or their stopping and starting ends shall be properly prepared by grinding or other suitable means so that they may be satisfactorily incorporated into the final weld. Tacks welds shall be made by qualified welders using qualified welding procedures.
When tack welds are to become part of finished weld, they shall be visually examined in accordance with NG-5261 and defective tack welds shall be removed Along with the option to full comply with NG-4231.1, if practicable, the proposed alternative option to Paragraph NG-4231.1 is as follows:
The use of a qualified inspector to perform the VT examination required by NG-4231.1 may be omitted for the welds of R45 Transition Rails of the NUHOMS 61BTH Type 2 DSC when the following additional requirements are met:
- 1.
The welder or weld supervisor shall check the tack welds for defects per NG-4231.1 and shall either remove or repair the defective tack welds in the process of fit-up and alignment.
- 2.
The welding procedure specification (WPS) and procedure qualification record (PQR) of the production welds shall contain the following additional qualification requirements for each joint geometry:
A. Three coupons shall be prepared that simulate the joint geometry that will be used in production. A tack weld shall be completed and broken.
B. The weld shall be completed with parameters that result in the minimum weld filler deposition rate allowed by the WPS.
C. The coupons shall be cross-sectioned, etched, and verified under magnification that the weld has satisfactorily incorporated the tack weld and the defect has been removed.
- 3.
An additional PQR shall be prepared in accordance with ASME Section IX with coupons that were produced with three broken tack welds per coupon at fit-up. The coupons shall pass all applicable testing requirements of ASME Section IX.
- 4.
Production welds shall be made by either an automated welding or mechanized welding process. Only the tack weld may be completed by a manual process.