Letter Sequence Supplement |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2022-LLA-0079, Tn America, LLC, Application for Amendment 18 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks, Revision 0 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request 2018-01-11
[Table View] |
Text
Columbia Office 7160 Riverwood Drive Columbia, MD 21046 Tel: (410) 910-6900
@Orano_USA February 16, 2023 E-62087 U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852
Subject:
Supplemental Response to Request for Additional Information -
Application for Amendment 18 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks, Revision 4 (Docket No. 72-1004, CAC No. 001028, EPID: L-2022-LLA-0079)
Reference:
[1] E-61864, Response to Request for Additional Information -
Application for Amendment 18 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks, Revision 2 (Docket No. 72-1004, CAC No. 001028, EPID: L-2022-LLA-0079),
dated January 20, 2023 TN Americas LLC (TN) hereby submits a supplement to Reference [1], above, that provides additional clarifying information in support of TNs use of blended Portland cement meeting the requirements of ASTM C595.
The NRC and TN held a clarification call on February 10, 2023 for the purpose of clarifying TNs UFSAR changes associated with the use of blended Portland cement that correlates to an additional scope item not related to the RAIs as identified in Reference [1]. provides a description of the Amendment 18, Revision 4 changes. provides the UFSAR changed pages associated with Revision 4 to the application for Amendment 18. The changed pages include a footer annotated as 72-1004 Amendment 18, Revision 4, February 2023, with changes indicated by italicized text and revision bars. The changes are further annotated with gray shading or a gray box enclosing an added section, as well as a footer to distinguish the Amendment 18, Revision 4 changes from previous Amendment 18 changes.
Should you have any questions regarding this submittal, please do not hesitate to contact Mr. Douglas Yates at 434-832-3101 or me at 410-910-6859.
Sincerely, Prakash Narayanan Chief Technical Officer
Document Control Desk E-62087 Page 2 of 2 cc:
Chris Allen (NRC), Project Manager, Storage and Transportation Licensing Branch Division of Fuel Management
Enclosures:
- 1. Description of Amendment 18, Revision 4 Changes
- 2. Proposed Amendment 18, Revision 4 Changes to the Standardized NUHOMS System Updated Final Safety Analysis Report to E-62087 Page 1 of 1 DESCRIPTION OF AMENDMENT 18, REVISION 4 CHANGES INTRODUCTION Certain UFSAR pages that support Amendment 18 to the Standardized NUHOMS Certificate of Compliance (CoC) No. 1004 have been modified as described below.
Change No. 1:
Based on the recent clarification call between TN Americas LLC (TN) and the NRC concerning the use of a blended Portland-Limestone cement certified to the requirements of ASTM C595, the following UFSAR changed pages are provided in this submittal to improve information clarity.
Changes have been made to UFSAR Page 4.2-7 to delete the sentence, This applies to all HSM models including HSM-H and HSM-HS unless testing is performed. UFSAR page P.4-25 has been revised to clarify language and improve readability in Section P.4.4.8 with respect to elevated temperature testing.
Change No. 2:
UFSAR Page 4.10-1 has been revised to remove the code year from the newly added reference for ASTM C595. This additional change was not mentioned in the clarification call. This minor edit is necessary because, with respect to ASTM testing and material standards, TN typically uses the latest edition as material suppliers certify their materials to the latest edition. Similarly, testing labs would perform testing to the latest edition of the ASTM. Lastly, active ASTMs are revised frequently with input from the industry.
to E-62087 Proposed Amendment 18, Revision 4 Changes to the Standardized NUHOMS System Updated Final Safety Analysis Report
February 2023 Revision 4 72-1004 Amendment No. 18 Page 4.2-7 During DSC insertion/withdrawal operations, the transfer cask is docked with the HSM docking flange and mechanically secured to embedments provided in the front wall of the HSM. The cask restraints used for this purpose are shown in Figure 4.2-13. The embedments are equally spaced on either side of the HSM access opening. The HSM embedments are designed in accordance with the requirements of ACI 349 Code (4.14).
The transfer cask restraint system is designed for loads which occur during normal DSC transfer operations and during an off-normal jammed DSC event.
The HSM gap between modules is covered with stainless steel wire bird screen to prevent pests or foreign material from entering the HSM. Periodic surveillance constitutes the only required maintenance activity for the NUHOMS ISFSI.
It is expected that during the installation and loading of an HSM array there will be empty modules. Vacant HSMs can occur due to: partial filling of a complete construction phase of HSMs, or a partial filling of a phase of HSMs which will be expanded at a future date. The following issues have been evaluated for both cases:
Normal Operation Issues, Construction Issues, and Accident Condition Issues. During installation of an additional HSM(s), or for other reasons, shield wall(s) may be removed for a period of time. However, compensatory measures shall be considered for radiation shielding and for missile protection, if necessary.
The design flexibility of the HSMs permits a licensee to choose the most economical arrangement of HSMs which best meets plant specific conditions and requirements. This SAR presents a detailed analysis for a single stand-alone module as this is the governing design case for the postulated environmental loads such as earthquake, flooding, and tornado loads. Thermal loads also provide significant loadings for the HSM structural design for the free-standing prefabricated HSM.
A typical reinforcing steel layout for the HSM floor, walls, and roof is shown in Figure 8.1-19. The reinforcement sizing and placement specified is used for HSM array configurations ranging in size from a single stand alone module to a 2x10 array of HSMs or larger. Licensing details, such as concrete joint and reinforcing bar lap splice requirements, are shown on the Appendix E drawings.
The HSM design documented in this SAR is constructed of 5,000 psi (minimum) compressive strength, normal weight (145 pounds per cubic foot minimum density) concrete with Type II Portland cement meeting the requirements of ASTM C150 (4.6) or blended Portland cement meeting the requirements of ASTM C595 [4.8]. Type III cement may be used as long as it meets the chemical and physical requirements for Type II cement specified in ASTM C150. The concrete aggregate meets the specifications of ASTM C33 (4.6). The concrete is reinforced by ASTM A615 or A706 Grade 60 (4.7) deformed bars placed vertically and horizontally at each face of the walls, roof and floor.
All indicated changes on this page are for Enclosure1 Item 1
February 2023 Revision 4 72-1004 Amendment No. 18 Page 4.10-1 4.10 References 4.1 U.S. Government, Licensing Requirements for the Storage of Spent Fuel in an Independent Spent Fuel Storage Installation (ISFSI), Title 10 Code of Federal Regulations, Part 72, Office of the Federal Register, Washington, D.C.
4.2 Deleted.
4.3 Deleted.
4.4 Deleted.
4.5 American Society of Mechanical Engineers, ASME Boiler and Pressure Vessel Code,Section III, Division 1, 1983 Edition, with Winter 1985 Addenda.
4.6 American Society for Testing and Materials, Annual Book of ASTM Standards, Section 4, Volume 04.02, 1990.
4.7 American Society for Testing and Materials, Annual Book of ASTM Standards, Section 1, Volume 01.04, 1990.
4.8 ASTM International, C595/C595M, Standard Specification for Blended Hydraulic Cements.
4.9 American National Standard for Special Lifting Devices for Shipping Containers Weighing 10,000 Pounds (4500 kg) or More for Nuclear Materials, ANSI N14.6-1993, American National Standards Institute, Inc., New York, New York.
4.10 American Concrete Institute, Building Code Requirement for Reinforced Concrete, ACI-318, 1983.
4.11 American Institute of Steel Construction, (AISC), Specification for Structural Steel Buildings, Ninth Edition 1989, Chicago, Illinois.
4.12 American National Standards Institute, American National Standard for Radioactive Materials - Leakage Tests on Packages for Shipment, ANSI N14.5, 1977.
All indicated changes on this page are for Enclosure1 Item 2
February 2023 Revision 4 72-1004 Amendment No. 18 Page P.4-25 P.4.4.7 HSM-H Thermal Model Results P.4.4.7.1 Normal and Off-normal Operating Condition Results Temperature distributions for the normal and off-normal cases are shown in Figure P.4-6 through Figure P.4-13. The maximum component temperatures for the normal and off-normal cases are listed in Table P.4-2, Table P.4-3, and Table P.4-4. Temperature distributions for the single HSM-H which provides maximum temperature gradients in concrete walls, are shown in Figure P.4-16. Note that Figure P.4-16 shows the analysis temperature distribution before any adjustments made based on the results for bounding Case 1 documented in Table P.4-2. As seen from Table P.4-2 and Table P.4-3, the HSM-H concrete and DSC shell temperatures without the fins on the side heat shield for 31.2 kW are bounded by the case with the fins for 40.8 kW decay heat load. Therefore, fins are not required on the side heat shields in the HSM-H, if the total heat load is 31.2 kW or less. This is summarized in Table P.4-43.
P.4.4.7.2 Accident Condition Results Temperature distributions for the blocked vent accident case with 40.8 kW decay heat load at 38.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after blockage of the vents are shown in Figure P.4-14. The maximum component temperatures for the blocked vent accident case are listed in Table P.4-5.
Figure P.4-15 shows the time-temperature history of HSM-H components for this transient.
The maximum component temperatures for these cases are listed in Table P.4-6. Figure P.4-17 provides maximum temperature gradients in concrete walls during accident conditions. Table P.4-5 and Table P.4-6 incorporate the adjustments made to the analytical results as described in P.4.4.8 based on the thermal tests of the HSM-H [4.48]. Note that Figure P.4-14, Figure P.4-15 and Figure P.4-17 show the analysis temperature distributions, before any adjustments made based on the results for bounding Case 1 documented in Table P.4-2.
P.4.4.8 Evaluation of HSM-H Performance The thermal performance of the HSM-H is evaluated under normal, off-normal, and accident conditions of operation as described above and is shown to satisfy all the temperature limits and criteria. The DSC shell temperatures calculated here, are used in the DSC basket and fuel cladding models as a boundary condition in Section P.4.6. The results show that all the basket and fuel cladding material temperature limits are satisfied. The results of the HSM-H temperatures are used in Section P.3 toshow that thermal stresses in the HSM-H are also within these allowables.
The results of the 117 °F ambient blocked vent condition show that the maximum concrete temperature at the end of 38.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (with finned side heat shields, louvered top heat shield, and with slots on plate on top of support rail) and 30.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (with flat stainless steel heat shields and without slots on plate on top of support rail) in the blocked vent accident are 431 °F and 415 °F, respectively. These are above the 350
°F limit given in NUREG 1536 [4.42] for accident conditions. To account for the effect of these higher concrete temperatures on the concrete compressive strengths, the structural analysis of HSM-H concrete components in Section P.3 is based on 10% reduction in concrete material properties. Elevated temperature testing of the concrete mix (cement type, additives, water-cement ratio, aggregates, proportions) is performed to ensure that the required strength is maintained. Portland cements meeting the requirements of ASTM C 150 or ASTM C595 (blended Portland cement) are acceptable for use. The use of any Portland cement concretes will require testing to be performed since the concrete accident temperature exceeds 350 °F. Testing will be performed to demonstrate that the level of strength reduction is less than the 10% reduction that was employed in the calculations, and to ensure that there is no deterioration of the concrete due to higher temperatures.
All indicated changes on this page are for Enclosure1 Item 1