Letter Sequence Meeting |
---|
CAC:001028, (Approved, Closed) EPID:L-2021-LLA-0053, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287, ML20260H376, ML20261H420... further results
|
MONTHYEARML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML19276D3982019-10-0303 October 2019 Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20111A2382020-04-13013 April 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20111A2392020-04-13013 April 2020 Attachment 1: HI-STORM Umax Amendment 4 RAI Supplemental Response (non-proprietary) Project stage: Supplement ML20111A2402020-04-13013 April 2020 Attachment 2: Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages (non-proprietary) Project stage: Other ML20094G4822020-04-15015 April 2020 GEH-Morris QAP Rev 4 Approval Project stage: Other ML20092L1732020-04-17017 April 2020 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 0 Project stage: Approval ML20120A2282020-04-29029 April 2020 Tn Americas LLC, Response to the Request for Additional Information to Application for Certificate of Compliance No. 1042, Amendment No. 2, to NUHOMS Eos System, (Docket No. 72-1042, CAC No. 001028 EPID: L-2019-LLA-0078)- Request for Extens Project stage: Request ML20125A0412020-05-0505 May 2020 Acceptance Review Completed for CoC 1021 (TN-32) Renewal Project stage: Acceptance Review L-20-001, Independent Spent Fuel Storage Installation, Request for Temporary Exemption from 10 CFR Part 73, Appendix B2020-05-13013 May 2020 Independent Spent Fuel Storage Installation, Request for Temporary Exemption from 10 CFR Part 73, Appendix B Project stage: Request 2020-03-06
[Table View] |
|
---|
Category:Meeting Agenda
MONTHYEARML24065A1182024-03-0606 March 2024 Public Meeting with Holtec, Holtec Users Group, and General Licensees Presentation Slides ML24064A0882024-02-15015 February 2024 Revised Meeting Notice with Holtec International to Discuss the NRC Plans on the Path Forward for General Licensees (Gls) Affected by the Continuous Basket Shims (CBS) Basket Design Change ML24052A3982024-02-15015 February 2024 Notice of Public Meeting with Holtec International to Discuss the NRC Plans on the Path Forward for General Licensees (Gls) Affected by the Continuous Basket Shims (CBS) Basket Design Change ML24046A2522024-02-15015 February 2024 Notice of Public Meeting with Holtec International to Discuss the NRC Plans on the Path Forward for General Licensees (Gls) Affected by the Continuous Basket Shims (CBS) Basket Design Change ML24032A1072024-02-0101 February 2024 Notice of Partially Closed Meeting Between the Nuclear Regulatory Commission, Holtec International, Inc., and the Holtec Users Group on EA-23-044 PMNS20221125, Notice of Meeting with Holtec International. LLC to Discuss HI-STORM FW Amendment 102022-10-28028 October 2022 Notice of Meeting with Holtec International. LLC to Discuss HI-STORM FW Amendment 10 ML21105A3702021-04-20020 April 2021 Handout for Pre-Application Meeting with Holtec on HI-STORM FW Amendment No. 7 (April 20, 2021) ML21096A2342021-04-0505 April 2021 Partially Closed Pre-application Meeting for the Holtec International HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 7 PMNS20210234, Closed Meeting with Holtec International (Holtec) and the U.S. Nuclearregulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems2021-02-26026 February 2021 Closed Meeting with Holtec International (Holtec) and the U.S. Nuclearregulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems ML19212A7632019-07-31031 July 2019 8/19/2019 Notice of Partially Closed Pre-Application Meeting Regarding Holtec International'S Plans to Submit a Thermal Topical Report for Allowance of Candidate Heat Load Patterns Without an Amendment Request ML19066A3842019-03-0707 March 2019 Notice of Meeting with Holtec International, Inc. (Holtec) to Discuss Holtec'S Proposed Response to the 2nd Round of Request for Additional Information (ML19011A127) for Certificate of Compliance No. 1032 for HI-STORM Flood/Wind, Amendment 2024-03-06
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24065A1182024-03-0606 March 2024 Public Meeting with Holtec, Holtec Users Group, and General Licensees Presentation Slides ML24036A2812024-02-0808 February 2024 Presentation Slides for Public Meeting with Holtec and Holtec Users Group on EA-23-044 and Path Forward ML21105A3702021-04-20020 April 2021 Handout for Pre-Application Meeting with Holtec on HI-STORM FW Amendment No. 7 (April 20, 2021) 2024-03-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24065A1182024-03-0606 March 2024 Public Meeting with Holtec, Holtec Users Group, and General Licensees Presentation Slides ML24036A2812024-02-0808 February 2024 Presentation Slides for Public Meeting with Holtec and Holtec Users Group on EA-23-044 and Path Forward ML21105A3702021-04-20020 April 2021 Handout for Pre-Application Meeting with Holtec on HI-STORM FW Amendment No. 7 (April 20, 2021) 2024-03-06
[Table view] |
Text
www.holtecinternational.com HI-STORM FW Amendment 7 Pre-Application Meeting April 20, 2021
Agenda Amendment 7 Proposed Changes Reorganization of the CoC with the Graded Approach Design Overview HI-STORM FW Version UVH Design Overview Optional Vent/Drain Port Cover Summary and Schedule Holtec Internationall Page 2
HI-STORM FW Amendment 7 Proposed Changes Reorganization of CoC with the graded approach HI-STORM FW Version UVH Version UVH is a HI-STORM FW overpack with the removal of ventilation ducts.
Optional vent/drain port cover plate design.
Remove PT examination on the post hydrostatic pressure test.
PT not required as part of ASME hydrostatic pressure testing requirements Supports ALARA operations Allow site-specific analysis of fire and burial under debris scenarios.
Use of water without glycol in the HI-TRAC water jacket during operations below 32°F.
A minimum MPC heat load is demonstrated to prevent the water within the HI-TRAC water jacket from freezing.
Holtec Internationall Page 3
HI-STORM FW Amendment 7 Proposed Changes HI-DRIP ancillary system.
An optional ancillary system designed to prevent water within the MPC during short term operations within the HI-TRAC.
Incorporation of design submitted with HI-STORM 100 Amendment 15 submittal.
Addition of BWR fuel assembly class 10x10J Fuel assembly class 10x10J is added to allowable content for storage in the MPC-89 canister.
Fuel type is currently in use by operating reactors and has been previously submitted for approval with the HI-STORM 100 LAR-15.
New fuel type was determined to be bounded by design basis fuel already analyzed in the HI-STORM FW FSAR.
Holtec Internationall Page 4
CoC Reorganization Following the Graded Approach
Background
RIRP-I-16-01 (2017): NEI proposed an outline for improving the storage CoC format and contents on behalf of the industry TN Pilot (submitted 2017 - approved 2020): TN submitted a non-technical amendment to a CoC following the guidance in RIRP NEI Margin White Paper: Recommendation VI-1: CoC holders should amend their CoCs to follow the precedent Holtec CoC 1014 - Amendment 16 and planned CoC 1032
- Amendment 7 Requests include technical changes and a proposed reorganization of the CoC and its appendices Holtec Internationall Page 5
CoC Reorganization Following the Graded Approach NEI Reorganized Outline:
CoC I. Technology II.Design Features Appendix A - Inspections, Tests, and Evaluations Appendix B - Technical Specifications 1.Definitions, Use, and Application 2.Approved Contents 3.LCOs and SRs 4.Administrative Controls Holtec Internationall Page 6
CoC Reorganization Following the Graded Approach This LAR contains proposed technical changes to the existing CoC and its Appendices It also contains the following documents to support the reorganization:
Reorganized CoC and Appendices Reorganization Tables Reorganization Matrix The only items that do not fit into the proposed outline Code alternative tables retained Expanded information included in Appendix A Holtec Internationall Page 7
HI-STORM FW Version UVH Unventilated overpack with high density concrete. This overpack is analyzed and supports loading of MPC-37, MPC-89, and MPC-44.
Removes periodic inspection of vent openings and associated LCOs.
Similar to the approved HI-STORM FW overpack, the Version UVH is of the variable height design.
Evaluation model methodologies are consistent with current HI-STORM FW analyses.
Holtec Internationall Page 8
MPC Vent/Drain Port Cover Plates Optional vent and drain penetrations design to include second port cover plate.
Design meets requirements of ISG-18 Rev. 1.
Field helium leak test not required on optional design.
Justification:
- Confinement Integrity Holtec Internationall Page 9
HI-STORM Amendment 7 Summary CoC Reorganized following the graded approach.
HI-STORM FW Version UVH is an unventilated version of the HI-STORM FW overpack with high density concrete.
Evaluation methodologies follow those currently prior NRC approved models.
Planned Submittal end of April 2021.
Questions and Discussion Holtec Internationall Page 10