Letter Sequence Withholding Request Acceptance |
|---|
CAC:000993, (Approved, Closed) CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2017-LNE-0007, Summary of June 7, 2018, Meeting with U.S. Department of Energy to Discuss the Proposed Responses to the Request for Additional Information Regarding the Renewal of the Three Mile Island Unit 2 ISFSI (Approved, Closed) EPID:L-2017-RNW-0019, Summary of June 7, 2018, Meeting with U.S. Department of Energy to Discuss the Proposed Responses to the Request for Additional Information Regarding the Renewal of the Three Mile Island Unit 2 ISFSI (Approved, Closed) |
Results
Other: ML18101A024, ML18108A052, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18222A351, ML18303A232, ML19112A158, ML19121A263, ML19121A265, ML19121A267, ML19121A268, ML19184A181, ML19184A184, ML19184A186, ML19184A187, ML19204A242, ML19204A244, ML19204A248, ML19204A251, ML19259A012, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML22089A167
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18030A1722018-01-29029 January 2018 Letter to J. P. Zimmerman Request for Additional Information for the Technical Review of the Application for Renewal of the Three Mile Island Unit 2 Independent Spent Fuel Storage Installation License No.: SNM-2508 Project stage: RAI ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI 2018-01-16
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 18, 2019 Mr. John P. Zimmerman Deputy Manager, Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 1955 Fremont Avenue, MS 1222 Idaho Falls, ID 83415
SUBJECT:
U.S. NUCLEAR REGULATORY COMMISSION APPROVAL OF U.S.
DEPARTMENT OF ENERGY REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR THREE MILE ISLAND, UNIT 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION (CAC/EPID NOS.
001028/L-2017-RNW-0019, 000993/L-2017-LNE-0007)
Dear Mr. Zimmerman:
By letter dated November 15, 2018, the U.S. Department of Energy submitted an affidavit dated November 14, 2018, executed by Paul Oleyar, Vice President, TN Americas LLC (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18331A337). You requested that the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
VECTRA Calculation Number 219-02.0403, Revision 0, Top End Dose Rates for TMI-2 Canisters, VECTRA Technologies, Inc., September 25, 1996, ADAMS Accession No. ML18331A328.
TRANSNUCLEAR WEST, Calculation 219-02.0300, Revision 1, Criticality Evaluation for the 10CFR72 INEL/TMI-2 Fuel ISS (NUHOMS-12T), August 17, 1999, ADAMS Accession No. ML18331A329.
VECTRA Calculation Number 219-02.0401, Revision 0, HSM and Cask Dose Rate Calculation, VECTRA Technologies, Inc., September 27, 1996, ADAMS Accession No. ML18331A330.
ORANO CALC-3021832, Revision 0, OS-197 Transfer Cask Shielding Analysis for TMl-2 ISFSI License Renewal, ADAMS Accession No. ML18331A332.
Vectra Technologies Document 219-02-104, Revision 0, TMI-2 Canister Drying and Monitoring, ADAMS Accession No. ML18331A333.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- 1) The information sought to be withheld from public disclosure involves details of the methodology and inputs regarding criticality, shielding and dose rate evaluations, and
J. Zimmerman 2
test specifications related to the design of the NUHOMS technology for storage of dry spent nuclear fuel, which are owned and have been held in confidence by TN Americas LLC.
- 2) The information is of a type customarily held in confidence by TN Americas LLC, and not customarily disclosed to the public. TN Americas LLC has a rational basis for determining the types of information customarily held in confidence by it.
- 3) Public disclosure of the information is likely to cause substantial harm to the competitive position of TN Americas LLC, because the information consists of details of the methodology and analyses related to the design of a dry spent fuel storage system, the application of which provide a competitive economic advantage. The availability of such information to competitors would enable them to modify their product to better compete with TN Americas LLC, take marketing or other actions to improve their product's position or impair the position of TN Americas LLC's product, and avoid developing similar data and analyses in support of their processes, methods or apparatus.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your and TN Americas LLC statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the above listed documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the U.S. Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified of the date of public disclosure, in advance which will be a reasonable time thereafter.
J. Zimmerman 3
If you have any questions regarding this matter, please contact me at (301) 415-7116 or Kristina.Banovac@nrc.gov.
Sincerely,
/RA/
Kristina L. Banovac, Project Manager Renewals and Materials Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.
72-20 License No. SNM-2508 CAC/EPID Nos. 001028/L-2017-RNW-0019 000993/L-2017-LNE-0007 cc:
TMI-2 ISFSI Service List Mr. Paul Oleyar, TN Americas LLC
TMI-2 ISFSI Service List cc:
Mr. Steven Ahrendts DOE Spent Fuel Program Supervisor U.S. Department of Energy Idaho Operations Office 1955 Fremont Ave., MS-1222 Idaho Falls, ID 83415 Mr. Steven Wahnschaffe DOE NRC Programs License Manager U.S. Department of Energy Idaho Operations Office 1955 Fremont Ave., MS-1222 Idaho Falls, ID 83415 Mr. David Bland Program Manager for NRC Licensed Facilities Spectra Tech Inc.
1955 Fremont Ave.
Idaho Falls, ID 83401 Mr. Robert Milazzo Business Manager for NRC Licensed Facilities Spectra Tech Inc.
132 Jefferson Court Oak Ridge, TN 37830 Mr. David R. Einan U.S. EPA Region 10 Hanford/INL Project Office 825 Jadwin Ave., Suite 210 Richland, WA 99352 The Honorable Blaine Edmo Chairman, Fort Hall Business Council Shoshone-Bannock Tribes P. O. Box 306 Fort Hall, ID 83203 Ms. Talia Martin Director, Tribal DOE Program Shoshone-Bannock Tribes P.O. Box 306 Fort Hall, ID 83203 Mr. John Tanner Coalition 21 2175 Tasman Ave Idaho Falls, ID 83404 Snake River Alliance Beatrice Brailsford Nuclear Program Director PO Box 1731 Boise, ID 83701 Mr. Mark Clough INL Oversight Coordinator DEQ State Office 1410 N. Hilton Boise, ID 83706 Chairman INL Committee Idaho Falls Chamber of Commerce 365 River Pkwy Idaho Falls, ID 83402 Mr. Chuck Broscious Environmental Defense Institute P.O. Box 220 Troy, ID 83871-0220 Mr. Bruce LaRule State of Idaho INL Oversight Program 900 N. Skyline Drive, Suite C Idaho Falls, ID 83402 Mr. Herb Bohrer Chair, Citizens Advisory Board c/o Ms. Jordan Davies North Wind 1425 Higham Street Idaho Falls, ID 83402 Chairman INL EM Site Specific Advisory Board c/o Lori MacNamara North Wind Group 1425 Higham St.
Idaho Falls, ID 83402 NRC Liaison State of Idaho INL Oversight Program 900 N. Skyline Drive, Suite C Idaho Falls, ID 83402
ML19262G853 OFFICE NMSS/DSFM NMSS/DSFM NMSS/DSFM NAME KBanovac WWheatley TAhn for MRahimi DATE 9 / 17 /19 9 / 17 /19 9 / 18 /19