ML24029A038
Letter Sequence Meeting | |
---|---|
CAC:001028, (Approved, Closed) EPID:L-2024-LLA-0002, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement (Approved, Closed) | |
Initiation
Administration Questions
Answers
Results
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20049A082, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20121A272, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287... further results | |
MONTHYEARML19276D3982019-10-0303 October 2019
[Table View]Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20111A2402020-04-13013 April 2020 Attachment 2: Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages (non-proprietary) Project stage: Other ML20111A2382020-04-13013 April 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20111A2392020-04-13013 April 2020 Attachment 1: HI-STORM Umax Amendment 4 RAI Supplemental Response (non-proprietary) Project stage: Supplement ML20094G4822020-04-15015 April 2020 GEH-Morris QAP Rev 4 Approval Project stage: Other ML20092L1732020-04-17017 April 2020 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 0 Project stage: Approval ML20120A2282020-04-29029 April 2020 Tn Americas LLC, Response to the Request for Additional Information to Application for Certificate of Compliance No. 1042, Amendment No. 2, to NUHOMS Eos System, (Docket No. 72-1042, CAC No. 001028 EPID: L-2019-LLA-0078)- Request for Extens Project stage: Request ML20121A2722020-04-30030 April 2020 Request to Extend the Due Date for Submitting the GEH Morris Operation License Renewal Application Project stage: Other 2020-03-05 |
ML24029A038 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 01/31/2024 |
From: | Kivi J Xcel Energy |
To: | Janice Nguyen Division of Fuel Management |
References | |
CAC 001028, EPID L-2024-LLA-0002 | |
Download: ML24029A038 (1) | |
Similar Documents at Prairie Island | |
---|---|
Category:Meeting Agenda
MONTHYEARML24029A0382024-01-31031 January 2024
[Table view]January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML24008A0132024-01-0808 January 2024 Notice of Public Meeting with Xcel Energy to Discuss the Prairie Island ISFSI Amendment ML23159A2542023-06-0808 June 2023 Pre-application Meeting with Xcel Energy to Discuss the Amendment Application for the Prairie Island ISFSI PMNS20230663, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-0202 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides PMNS20230262, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-04-12012 April 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220096, Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island)2022-02-0707 February 2022 Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) PMNS20211339, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System2021-10-15015 October 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request PMNS20210949, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-07-21021 July 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request PMNS20210528, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-05-0505 May 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20280A6092020-10-0606 October 2020 Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19074A1312019-03-11011 March 2019 Revised Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19070A2412019-03-11011 March 2019 Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19045A6682019-02-14014 February 2019 Notice of Meeting with Xcel Energy to Discuss a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island Independent Spent Fuel Storage Installation ML15183A3992015-07-0101 July 2015 Ltr. 07/01/15 Point Beach U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15114A0432015-04-23023 April 2015 PI 2014 PIR and EOC Meeting Notice ML14169A5862014-06-13013 June 2014 Operator License Workshop Invitation ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12326A9702012-11-21021 November 2012 Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 W/ Encl 1 (Attendees) and Encl 2 (Agenda) ML12318A0572012-11-13013 November 2012 12/6/2012 - Rescheduled Notice of Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2 ML12306A3222012-11-0101 November 2012 Notice of Forthcoming Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2 ML12249A2702012-09-11011 September 2012 Notice of Forthcoming Pre-Application Meeting with Xcel Energy, Inc. Concerning Prairie Island Nuclear Generating Plant ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1208703892012-03-30030 March 2012 Notice of Pre-Application Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2, to Discuss Licensee'S Proposed NFPA 805, Performance Based Standard for Fire Protection for Light Weight Reactor ... ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1121505252011-08-0404 August 2011 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Extended Power Uprate License Amendment Request ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1113703982011-05-20020 May 2011 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generation Plant, Units 1 and 2, to Discuss Proposed Technical Specification and Licensing Basis Changes to Diesel Fuel Oil System ML1104702792011-02-16016 February 2011 Notice of Forthcoming Meeting with Licensee for Prairie Island Nuclear Generating Plant, Unit 1 to Discuss License Amendment Request to Revise Surveillance Requirement Footnote in Technical Specification 3.8.1, AC Sources - Operating. ML1100502702011-01-0505 January 2011 Notice of Closed Pre-Application Meeting NSPM Staff to Discuss Proposed Physical Security Plan Changes That Will Be Submitted for NRC Review and Approval Via License Amendment Request ML1032603272010-11-24024 November 2010 Notice of Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Spent Fuel Pool Criticality and Extended Power Uprate ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1022200872010-08-10010 August 2010 Forthcoming Meeting with Northern States Power Company - Minnesota (Nspm), to Discuss the Prairie Island Nuclear Generating Plant Steam Generator Margin-to-Overfill Analysis as It Relates to Pingp'S License Amendment Request to Adopt... ML1009707112010-04-0808 April 2010 Revised Notice of Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Extended Power Uprate License Amendment Request ML1008205732010-03-26026 March 2010 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generating Plant, Units 1 and 2 to Discuss Extended Power Uprate License Amendment Request ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting ML0933102842009-12-0101 December 2009 Notice of Meeting with Prairie Island to Address Substantive Cross-Cutting Issues in the Area of Human Performance - Slides ML0930900052009-11-0909 November 2009 Agenda - 568th ACRS Meeting, December 3-5, 2009 2024-01-08 Category:Meeting Briefing Package/Handouts MONTHYEARML24029A0382024-01-31031 January 2024
[Table view]January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21221A0202021-08-11011 August 2021 Nis Pr Bypass Test Panel License Amendment Request ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14058A1732014-02-19019 February 2014 Diesel Generator Steady State Voltage and Frequency Limits - Prairie Island Nuclear Generating Plant Meeting February 19, 2014 ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A4652012-09-27027 September 2012 Meeting September 27, 2012 - Handouts ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant ML1034701142010-12-14014 December 2010 Excel Energy Slides for Public Meeting 12/14/2010 to Discuss Human Performance Issues ML1027802642010-10-0404 October 2010 Session 4 - Heather Westra Presentation at October 4, 2010, Public Meeting on Groundwater Protection ML1023805712010-08-25025 August 2010 Meeting Presentation Alternative Source Term Steam Generator Tube Rupture Margin to Overfill Evaluation - Prairie Island Nuclear Generating Plant ML1014502432010-05-26026 May 2010 Responses to Questions from the Prairie Island Indian Community Concerning Issues Related to Prairie Island Nuclear Generating Plant ML1012604192010-05-20020 May 2010 Meeting Presentation Prairie Island Annual Assessment Meeting - Reactor Oversight Program - 2009 ML1012503422010-05-0505 May 2010 Regulatory Conference Slides ML1015801072010-04-28028 April 2010 2R26 Outage, SG Tube Inspection Telecon Slides ML1010604782010-04-15015 April 2010 April 15, 2010, Meeting Slides - Pre-Application Meeting for Prairie Island Ngp Extended Power Uprate ML0932901282009-12-0101 December 2009 Licensee Slides for Public Meeting ML0931003422009-11-0303 November 2009 HAB Drill Conference Call 2024-01-31 Category:Slides and Viewgraphs MONTHYEARML24029A0382024-01-31031 January 2024
[Table view]January 31, 2024, Pre-application Meeting Presentation - Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions ML23168A0032023-06-20020 June 2023 Handout for 6/23/2023 Pre-Application Public Meeting with Prairie Island Nuclear Generating Plant to Revise ISFSI TS 4.4 for TN-40HT Casks ML23156A2602023-06-0505 June 2023 2022 Prairie Island End-of-Cycle Meeting Presentation ML23102A1752023-04-14014 April 2023 April 14, 2023 TS 3.7.8 LAR Pre-Submittal Meeting Slides ML22130A5852022-05-10010 May 2022 2021 Monticello and Prairie Island Nuclear Generating Plant End-of-Cycle Meeting Presentation ML22048B1812022-02-18018 February 2022 Pre-Application Meeting for Prairie Island TS 5.6.6, PTLR, LAR ML21166A3792021-06-15015 June 2021 Units 1 and 2 2020 End-of-Cycle Meeting Presentation ML21124A0652021-05-0606 May 2021 Xcel Energy Presentation for May 6, 2021 Public Meeting to Discuss 24-Month Cycles at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21032A2632021-02-0303 February 2021 Slides for Public Meeting with Xcel Energy to Discuss a Planned Amendment to Combine the Emergency Plans and Create a Common Emergency Offsite Facility for Monticello and Prairie Island ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML20212L8622020-07-29029 July 2020 2019 Monticello and Prairie Island EOC Presentation from Webinar ML20098F0682020-04-0909 April 2020 Preapplication Teleconference Presentation: License Amendment Request to Adopt TSTF-569 ML20057D3082020-02-18018 February 2020 Slides Potential License Amendment to Remove Note from LCO 3.4.12 and LCO 3.4.13 ML19268A0422019-09-26026 September 2019 Pre-Application Meeting License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19210D4512019-07-22022 July 2019 Abeyance Seal Preapplication Meeting Slides ML19071A2782019-03-0707 March 2019 Enclosure 3: Meeting Slides (Summary of February 28, 2019, Public Meeting with Xcel Energy to Discuss Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI (W/Enclosures 1 and 2)) ML18162A0262018-06-12012 June 2018 License Amendment Request to Reclassify Certain Fuel Handling Equipment ML18051A1752018-02-20020 February 2018 Pre-Application Meeting License Amendment for TSTF-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Xcel Energy 2/20/2018 ML17240A3382017-08-30030 August 2017 Non-Safety Related Digital Feedwater and Amsac/Dss Control Systems Replacement Project Presentation ML17198A2632017-07-17017 July 2017 Pre-Application Meeting ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices ML17066A3732017-03-0909 March 2017 Spent Fuel Pool Criticality Technical Specification Changes Round 2 Request for Additional Information Public Meeting: March 9, 2017 ML17037D1172017-02-0707 February 2017 License Amendment Requests for Change in Emergency Plan Staff Augmentation Response Times Pre-Submittal Meeting for Prairie Island Nuclear Generating Plant Monticello Nuclear Generating Plant: February 7, 2017 ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16280A0352016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 1 of 3 ML16280A0372016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 2 of 3 ML16280A0422016-09-29029 September 2016 Flood Hazard Reevaluation Report - Response to Requested Information (CAC Nos. MF7710 and MF7711) - Figure 3 of 3 ML15140A3342015-05-13013 May 2015 Public Meeting 05132015 Licensee Slides Only ML15127A6562015-05-0707 May 2015 PI EOC Mtg NRC Slides ML15105A0372015-04-14014 April 2015 Xcel Energy Slide Presentation to Support Pre-Application Meeting on April 14, 2015, to Discuss Nuclear Fuel Design Transition to Include Integral Fuel Burnable Absorber (Ifba) at the Prairie Island Nuclear Generating Plant ML14323B0222014-11-19019 November 2014 Regcon, November 19-20, 2014: 03-Info-Session-2 Ronald Johnson - Tribal Perspective on Continued Storage ML14162A5202014-06-11011 June 2014 Slides: Prairie Island Independent Spent Fuel Storage Installation - License Renewal Application - Discussion of Requests for Additional Information, for June 16, 2014, Public Meeting ML14153A0242014-05-16016 May 2014 Xcel Energy'S Presentation Slides Supporting a May 16, 2014, Public Meeting to Discuss the Flood Hazard Reevaluation Schedule for the Monticello and Prairie Island Nuclear Generating Plants ML14084A3242014-03-21021 March 2014 M140321: Slides - Presented by Multiple Participants at Commission Briefing on Waste Confidence Rulemaking ML13210A2012013-07-29029 July 2013 2012 End-of-Cycle Slides - Licensee ML13210A2002013-07-11011 July 2013 2012 End-of-Cycle Slides ML13056A0262013-02-25025 February 2013 Regulatory Conference Slide Presentation ML12340A5402012-12-0606 December 2012 Reactor Core Cooling & Heat Removal FLEX Strategy - Phase 1 ML12326A9712012-11-21021 November 2012 Encl 3 (Handouts - Public) to Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 ML12277A1762012-10-0404 October 2012 Steam Generator Replacement Presentation ML12275A3782012-09-27027 September 2012 Xcel Energy Prairie Island Nuclear Generating Plant Meeting Presentation, Diesel Generator Voltage and Frequency Limits. ML12205A2172012-07-23023 July 2012 NRC 2011 End-of-Cycle Slides ML12205A2202012-07-17017 July 2012 Licensee 2012 End-of-Cycle Slides ML12115A3112012-04-24024 April 2012 Meeting Slides: 04/24/2012 Meeting with Xcel Energy NFPA 805 Presubmittal - Prairie Island Nuclear Generating Plant ML1207904792012-03-14014 March 2012 March 14, 2012 Telecon Slides ML1122803892011-08-18018 August 2011 Pre-Application Meeting for Prairie Island Nuclear Generating Plant (Ping) Extended Power Uprate (EPU) ML1119903462011-07-28028 July 2011 Meeting Presentation, Prairie Island Nuclear Generating Plant - Failure to Maintain the Train a and B Direct Current Electrical Power Subsystems Operable ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp ML1110200652011-04-14014 April 2011 NRC Slides for EOC Meeting ML1106600792011-03-0303 March 2011 March 3, 2011 Meeting Handouts - Revise Footnote in TS 3.8.1, Prairie Island Nuclear Generating Plant 2024-01-31 |
Text
Prairie Island ISFSI License Amendment Request to Add Grace to License Conditions 1.31.2024
Agenda
- Purpose
- Background
- Proposed Licensing Action
- Schedule
- Closing Remarks 2
Purpose The purpose of this meeting is to discuss proposed License Amendment for Prairie Island Independent Spent Fuel Storage Installation (ISFSI) to revise the License to change License Conditions 23(a), 24(A)(2), and 24(B)(2).
3
Background
License Conditions 23(a), 24(A)(2), and 24(B)(2) currently include no allowance for a grace period. Additionally, the inspection interval descriptions use terms like not to exceed every quarter or not to exceed three months which is not consistent with the typical surveillance frequency in Technical Specifications of 92 days.
4
Proposed Licensing Action License Condition Changes NSPM Proposed mark up 5
Schedule NSPM plans to submit the LAR by February 24, 2024, and request NRC approval 12 months from acceptance with an implementation period of 90 days.
6