Enclosurequest for Additional Information (Letter to B. Nick Request for Additional Information Regarding Dairyland Power Cooperative'S Decommissioning Funding Plan Update for La Crosse Boiling Water Reactor ISFSI)
ML18067A086
Person / Time
Site: 07100046
Issue date: 03/08/2018
From: Pamela Longmire
Spent Fuel Licensing Branch
To: Nick B
Dairyland Power Cooperative
Longmire P
Shared Package
ML18067A084 List:
References
CAC 001028, EPID L-2017-FPR-0037
Download: ML18067A086 (1)


Text

REQUEST FOR ADDITIONAL INFORMATION REGARDING DAIRYLAND POWER COOPERATIVES DECOMMISSIONING FUNDING PLAN UPDATE FOR LA CROSSE BOILING WATER REACTOR INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-46 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

Background

By letter dated March 14, 2016, Dairyland Power Cooperative (DPC) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, a decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at La Crosse Boiling Water Reactor (Agencywide Documents Access and Management System Accession No. ML16102A101). The NRC staff reviewed DPCs DFP update for the ISFSI and believes DPCs submittal was not sufficient to meet the intent of the requirement in 72.30(c). The DFP update does not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.

RAI 1

For the ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

Enclosure