Enclosurequest for Additional Information (Request for Additional Information Regarding Southern California Edisons Decommissioning Funding Plan for San Onofre Nuclear Generating Station ISFSI)
ML18060A148
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/28/2018
From: Pamela Longmire
Spent Fuel Licensing Branch
To: Thomas J. Palmisano
Southern California Edison Co
Longmire P
Shared Package
ML18060A147 List:
References
CAC 001028, EPID L-2017-FPR-0062
Download: ML18060A148 (1)


Text

Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING SOUTHERN CALIFORNIA EDISONS DECOMMISSIONING FUNDING PLAN UPDATE FOR SAN ONOFRE NUCLEAR GENERATING STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-41 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

=

Background===

By letter dated December 14, 2015, Southern California Edison (SCE), on behalf of itself, San Diego Gas and Electric, the City of Anaheim, and the City of Riverside, submitted for U.S.

Nuclear Regulatory Commission (NRC) staff review and approval, a decommissioning funding plan update (DFP Update) for the independent spent fuel storage installation (ISFSI) at San Onofre Nuclear Generating Station (SONGS) (Agencywide Documents Access and Management System Accession No. ML15349A942). The NRC staff reviewed SCEs DFP update for the SONGS ISFSI and believes SCEs submittal was not sufficient to meet the intent of the requirement in 72.30(c). The DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.

RAI 1

For the SONGS ISFSI, provide a revised DFP that includes information on the occurrence, and the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.