International HI-STORM FW Amendment 7 Responses to Requests for Supplemental Information
ML21288A522
Person / Time
Site: 07201032
Issue date: 10/15/2021
From: Elisio D
Holtec
To: Yen-Ju Chen
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Division of Fuel Management
Shared Package
ML21288A521 List:
References
5018091, CAC 001028, CoC No. 1032, EPID L2021-LLA-0053
Download: ML21288A522 (4)


Text

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 October 15, 2021 Yen-Ju Chen, Sr. Project Manager Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-1032, Certificate of Compliance (CoC) No. 1032 CAC No. 001028, EPID No. L-2021-LLA-0053

Subject:

HI-STORM FW Amendment 7 Responses to Requests for Supplemental Information

Reference:

[1] Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System (Docket No. 72-1032, CAC No. 001028, EPID: L-2021-LLA-0053) Request for Supplemental Information, letter from Y. Chen (NRC) to D. Elisio (Holtec) dated August 25, 2021. ADAMS Accession No. ML21203A049.

[2] Schedule for Responses to HI-STORM FW Amd. 7 Requests for Supplemental Information, letter from D. Elisio (Holtec) to Y. Chen (NRC) dated September 8, 2021. ADAMS Accession No. ML21251A550.

[3] HI-STORM FW Amendment 7 Request, letter from B. Seawright (Holtec) to Y.

Chen (NRC) dated May 6, 2021. ADAMS Accession No. ML21126A267.

Dear Ms. Chen:

By letter dated August 25, 2021 [1], the NRC staff requested that additional technical information be provided in order for the staff to begin the technical review of Amendment 7 for the HI-STORM FW Certificate of Compliance No. 1032. The letter also requests additional information related to the Amendment 7 proposed reorganization of the Certificate of Compliance. The additional information needed is based on feedback provided by the NRC staff in the July 27, 2021, public meeting on the graded approach proposed in the application for HI-STORM 100 Amendment 16.

Holtec understood the need for supplemental information and expressed our plan to submit that information by October 15, 2021, in a letter dated September 8, 2021 [2].

Document ID 5018091 Page 1 of 4

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Holtecs responses to the NRC staff RSIs and supporting information are in the enclosures to this letter. The responses to the RSIs are provided in Attachment 1, with Attachment 2 being a non-proprietary copy. The changes to the proposed CoC Appendix B following the currently approved format of CoC-1032 as a result of the RSIs are provided in Attachment 4. Changes to the FSAR as a result of the RSIs are included in Attachments 5 and 6 for both proprietary and non-proprietary versions, respectively. All proposed changes in Attachments 4 through 6 based on the RSI responses are highlighted in yellow to facilitate the NRC staffs review. Attachment 7 contains the revised licensing drawings supporting the RSI responses. Attachments 8 through 10 contain supporting proprietary documents for the changes made with regards to the RSI responses and the changes made to the licensing bases.

This letter also submits a few minor additional changes related to updating the CoC Appendix B Table 2.1-3 that were not part of the original HI-STORM FW LAR 1032-7 [3]. The reason and justification for this additional proposed change are captured in Attachment 3 Updated Summary of Proposed Changes. The markups associated with this additional proposed change are shown in Attachments 4 through 6 and Attachment 18 contains supporting proprietary documents.

Attachments 11 through 17 contain the supplemental information requested related to the proposed reorganization of the CoC. Attachments 11 through 13 are the reorganized CoC and its Appendices. The mark-ups in these Attachments reflect text changes to the original format CoC proposed in Attachments 2 through 4 of the HI-STORM FW LAR 1032-7 [3] and in Attachment 4 to this letter. Attachment 14 is a matrix showing a high-level perspective of where the information in the original CoC and its Appendices can be found in the reorganized documents.

Attachments 15 through 17 provide the evaluations following the graded approach process described in RIRP-I-16-01. These evaluations support decisions made about where the parts of the original CoC and its Appendices are moved to in the reorganized documents and which parts can be removed or reduced.

Since some attachments to this letter contain Holtec proprietary information, an affidavit requesting this information be withheld in accordance with 10CFR2.390 is included as Attachment 19.

Document ID 5018091 Page 2 of 4

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 HOLTEC INTERNATIONAL Fax(856)797-0909 If you have any questions or require any additional information, please contact me at 856-797-0900 ext. 3326.

Sincerely, Denise Elisio Licensing Engineer, Holtec International cc: (via email)

John McKirgan (USNRC)

Kimberly Manzione (Holtec)

Attachments: : HI-STORM FW Amendment 7 RSI Responses (proprietary) : HI-STORM FW Amendment 7 RSI Responses (non-proprietary) : Updated Summary of Proposed Changes (non-proprietary) : HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, changed pages (non-proprietary) : HI-STORM FW FSAR Proposed Revision lOA, changed pages (proprietary) : HI-STORM FW FSAR Proposed Revision lOA, changed pages (non-proprietary) : Changes to the Proposed Licensing Drawings (proprietary) : Revised Redundant Port Cover Closure Summary (proprietary) : Appendix N to Holtec Report HI-2094400, Thermal Evaluation of HI-STORM FW (Revision 3 7) (proprietary) 0: Appendices A and B to Holtec Report HI-2200191, Thermal Analysis ofHI-STORM FW UVH System (Revision 2) (proprietary) 1: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization 2: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix A Reorganization 3: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B Reorganization 4: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization Matrix Document ID 5018091 Page 3 of4

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 HOL INTERNATIONAL TEC Fax (856) 797-0909 5: HI-STORM FW Amendment 7 Certificate of Compliance Reorganization Evaluation Form 6: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix A Reorganization Evaluation Form 7: HI-STORM FW Amendment 7 Certificate of Compliance, Appendix B Reorganization Evaluation Form 8: Appendices D, H, and N to Holtec Report HI-2094432, Criticality Evaluation of the HI-STORM FW System (Revision 18) (proprietary) 9: Affidavit in Accordance with 10CFR2.390 Document ID 5018091 Page 4 of 4