Letter Sequence Other |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2017-LLE-0029, Package: First Request for Additional Information for Review of Exemption Request for Five Nonconforming Dry Shielded Canisters 11 Through 15 (CAC No. 001028, Docket No. 72-58, EPID L-2017-LLE-0029) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request 2018-01-11
[Table View] |
Text
ENCLOSURE 7 PROCEDURE 12751-MNGP-QP-9.201, REVISION 0 VISUAL WELD EXAMINATION 12 pages follow
TriVis NDE Services, LLC A Division of Tri Vis Inc.
Visual Weld Examination Procedure No.: 12751-MNGP-QP-9.201 RO
---~----
PageO
Rev.No.
0 Reviewed Visual Weld Examination Revblon 3umrnmy and Approwil Rnlelon Summary This Is the Initial 1-.. ot ttlla document a e prqect &pecffio PfOC*M8 end i6 based on therequlrelllentsofQP-9.201, ReY8.
03/27/2013 NDE/OC Supa,visorfTiMa-NDE i.evei 111
.;;;; ~~--
J, <Ouallty Assurance"'Manager Approved: t,r Department Man Date 1
1 Visual Weld Examination 1.0 PURPOSE This procedure provides the requirements for direct visual examinations of materials, parts, components, in-process, and final welds on NUHOMS canisters.
2.0 DEFINITIONS 2.1 In-Process Welds -welding performed leading up to the final weld surface (e.g. - tacks, root, etc.) prior to NDE.
2.2 Final Weld Surface - The surface of the final weld after all required surface finishing operations have been completed.
2.3 Work Documents - Include but are not limited to work instructions, procedures, design drawings, and applicable codes.
3.0 REFERENCES
3.1 Applicable Spent Fuel Canister Welding Procedure 3.2 ASME Boiler & Pressure Vessel Code,Section V, Article 9, 1998 Edition w/ Addenda through 1999.
3.3 ASME Boiler & Pressure Vessel Code, Section Ill, Division I, NB 5300, 1998 Edition w/
Addenda through 1999.
3.4 QP-9.200 Written Practice for the Qualification & Certification of Nondestructive Examination (NOE) Personnel.
3.5 VT Qualification Letter dated June 23, 2006 3.6 12751-MNGP-QP-9.202, Color Contrast Liquid Penetrant (PT) Examination Using the Solvent-Removable Method 4.0 GENERAL REQUIREMENTS 4.1 PERSONNEL REQUIREMENTS 4.1.1 TriVis personnel performing NOE shall be qualified and certified in accordance with QP-9.200, Written Practice for the Qualification & Certification of Nondestructive Examination (NOE) Personnel.
4.1.2 Personnel provided to TriVis, as an approved contractor, shall be certified in accordance with the contractor's written practice developed according to SNT-TC-1 A: 1992 or stricter.
4.1.3 Nondestructive examination personnel shall be certified to at least NOE Level II.
4.2 EXAMINATION REQUIREMENTS 4.2.1 Procedure Qualification:
A.
The ASME B&PV Code,Section V, Article 9, identifies the requirements listed below as essential variables:
Change in technique (direct to or from translucent or direct to remote)
Remote visual aids Personal performance requirements (when required)
Lighting intensity (decrease only) 2
Visual Weld Examination B.
Changes to any of these requirements shall require requalification of this procedure by demonstration and the procedure shall be revised.
C.
This procedure was developed from QP-9.201, which was qualified as described in Attachment 1, vr Qualification Letter. Since the initial qualification, none of the essential variables have changed; therefore this procedure is considered a qualified procedure.
4.2.2 Direct Visual Examination:
Direct visual examination may be made when access is sufficient to place the eye within 24 inches of the surface to be examined and at an angle not less than 30 degrees to the surface being examined. Mirrors may be used to assist examinations.
4.2.3 Lighting Requirements:
The specific part, component, weld, or section thereof under immediate examination shall be illuminated with natural or supplemental white light to attain a minimum light intensity of 100 foot candles. The light intensity shall be measured using an appropriate calibrated light meter. Lighting values shall be documented according to Section 8.1 of this procedure.
4.2.4 Measuring Devices:
Machinist scales with 1 /64-inch graduations or other devices of equivalent accuracy may be used for the evaluation of defects. Other measuring devices shall be capable of accuracy to the tolerances of the design specifications.
4.2.5 Cleanliness
Prior to examination, verify the surface to be examined and adjacent areas within at least one (1) inch of the area to be examined is dry and free of dirt, lint, scale, welding slag or flux, spatter, paint, oil, or other extraneous matter that would interfere with the examination.. Either a mechanical method or a solvent method, or both, shall remove paint, oil, rust, grease, scale or other such material.
4.2.6 Base Material Evaluation:
A.
Indications in base materials which are discovered during the process of fabrication or installation shall be dispositioned. Exploration to the extent necessary to determine compliance to work documents shall be governed under the approved weld traveler, approved repair plan, and/or documented engineering disposition.
B.
Indications which may warrant further evaluation are:
Nicks, gouges, dents, or other mechanically or thermally caused surface indications which are suspected to reduce the thickness below the design minimum thickness of the material.
Any evidence of basic material problems such as laps, seams, laminations, or casting defects related to the material manufacturer.
4.2. 7 Base Metal Repairs Base materials which require excavation and NDE examination and /or repair by welding and post weld NDE examination shall be governed under the approved project specific weld traveler, approved repair plan and documented engineering disposition.
3
I Visual Weld Examination 5.0 PROCEDURE 6.0 5.1 EXAMINATION PRIOR TO WELDING:
5.1.1 Joint design, edge preparation and fit up shall be examined in accordance with the applicable Spent Fuel Canister Welding procedure and approved drawings to ensure proper tolerances are achieved and that welded areas are free of defects.
5.1.2 Surfaces for welding shall be dry and free of scale, rust, oil, grease, water, and other foreign material.
5.2 HEAT AFFECTED ZONE (HAZ) AND/OR IN-PROCESS AND FINAL WELD EXAMINATION:
The area of examination includes the weld plus 1 inch on either side of the weld surface.
As a minimum, the weld surface shall be examined for the following (if applicable):
coarse ripples coarse grooves overlap abrupt ridges and valleys cracks porosity lack of fusion lack of penetration undercut ACCEPTANCE CRITERIA 6.1 All welds require final inspection in accordance with this procedure and the applicable Spent Fuel Canister Welding procedure.
6.2 An indication shall be considered relevant if dimensions along its major axis meet or exceeds 1/16 (0.0625) inch.
A.
Weld reinforcement may be measured with any suitable welding inspection gauge.
B.
Weld throat and edge preparation depth may be measured with a depth gauge or similar mechanical gauge for comparison of plate surface to weld depth.
6.3 Weld and HAZ Acceptance Criteria:
A.
Cracks: UNACCEPTABLE.
B Incomplete Fusion: UNACCEPTABLE.
C.
Stop/Start Craters: UNACCEPTABLE.
D.
Linear indications (those indications whose length greater than three times their width): UNACCEPTABLE.
E.
Porosity or rounded indications (those which are circular or elliptical with their length equal to or less than three times their width): UNACCEPTABLE.
F.
Arc strikes and associated blemishes: UNACCEPTABLE.
G.
Weld reinforcement greater than specified in the project weld traveler in the applicable Spent Fuel Canister Welding procedure:
UNACCEPTABLE.
H.
Undersized welds (underfill): UNACCEPTABLE.
I.
Undercut (wash, scalloping or other related non standard terms): shall not exceed 1/32 inch, (0.031) in any direction.
4
Visual Weld Examination 7.0 WELD DEFECT REMOVAL AND REPAIR Weld defect removal and repair shall be performed and documented in accordance with the applicable Spent Fuel Canister Welding procedure.
8.0 DOCUMENTATION 8.1 Record the result of the examination and all pertinent information for performing the examination on the attached VT/PT Examination Report. Other forms may be used provided the required data is documented. Record the following information as applicable 8.2 All non-rejectable and rejectable indications noted during the inspection shall be documented and detailed.
8.3 The form VT/PT Examination Report shall be filled out in its entirety. N/A all that does not apply.
9.0 ATTACHMENTS VT Qualification Letter 10.0 FORMS 12751-MNGP-QP-9.201-01 5
Visual Weld Examination TrlVis Project Number:
VT/PT Examination Report Report Number:
12751 Page 1 of 5 Customer:
Date of Examination:
Contract Number:
Exam Surface:
Component ID:
Drawing Number:
Weld Number(s):
Original Exam: D Re-examination D Light Meter Number:
Device Number:
Calibration Due Date:
Calibration Due Date:
Verify that the light intensity, at the surface of the test Verify that all temperature(s) at the surface(s), to component, is 100 Foot candles (fc) or greater.
be examined, are between 50°F and 325°F.
Measured Intensity:
fc llluminator:
...Note - Temperatures are recorded in "Additional Information".
Examination Method(s)
Penetrant Family:
D Direct Visual Examination Penetrant:
Batch:
Dwell:
Procedure:
Rev. -
Cleaner:
Batch:
Dry:
D Solvent Removable PT Exam.
Developer:
Batch:
Develop: __
Procedure:
Rev. -
- Note - Dwell, Dry and Develop are express in minutes recorded.*
ADDITIONAL INFORMATION EXAMINATION RESULTS SATISFACTORY D UNSATISFACTORY D SECOND EXAMINER N/A D
EXAMINER:
LEVEL (Print Name)
(Signature)
EXAMINER:
LEVEL (Print Name)
(Signature)
Form 12751-MNGP-9.201-01 6
Notes:
Visual Weld Examination TrlVis Project Number:
12751 VT/PT Examination Report Report Number:
PAGE: 2of5 oo 180° Continuation Sheet for ITC Components:
ITC WELD SECTION Form 12751-MNGP-QP-9.201-01 7
Notes:
Visual Weld Examination TriVis Project Number:
12751 VT/PT Examination Report Report Number:
PAGE: 3 of 5 Continuation Sheet for ITC Components:
KEYWAY SECTION Form 12751-MNGP-QP-9.201-01 8
Visual Weld Examination TriVis Project Number:
12751 VT/PT Examination Report Report Number:
PAGE: 4of 5 180° Continuation Sheet for OTC Components:
OTC WELD SECTION Notes:-------------------------------
Form 12751-MNGP-OP*9.201-01 9
Visual Weld Examination TriVis Project Number:
12751 PAGE: 5 of 5 Notes:
VT/PT Examination Report Report Number:
Continuation Sheet for OTC Components:
PLUG WELD SECTION Form 12751-MNGP-QP-9.201-01 10
Visual Weld Examination ATTACHMENT 1 LEAK TESTING SPECIALISTS, INC.
w11,w.l.8il.. Mna;;,k.&DA
)790 Hollher /WC. Sul\\e,0) Orlando, FL 321122
'Phone ('°7) 1]7-64 U l'ax (of07) 737-6416 OffkN la: W--*'°"' UC -l'Oftland, OR - Or-, PL Juno 23, 2006 To: Letter to flle The pwpose of this l4ltter la to document the Pmcedure Qualification as cle.<<;ribed in..e1ion 4.2, paragraph 4.2. J oCTriVla fnc. Vhual procedure, QP-9.201 Revilion l, VJSUAL WELD EXAMINATION OF DRY CASK ASSEMBLY usi"8 the direct visual method.
The qualiflcatlon wu perl'ormecl in IICCOrdance with the above listed procedure, and ASME Section V Article 9, 1998 Edition wilh 1999 & 2000 Addenda'**
Natural llgl,ting aupplemented by a fluhllaht, 12" ruler, 6" acalo with 1/32" and 1/64" incremente, a liahl meter, UICI a surface almilar 10 &hat lo bo oxamlnod WCfO used for this decnoNtntion. Pla~oa the scale oo tho 111r1lico al tbe,_ dbcemible locadon, holdina the flashliahl al approximately 12", and Maintalnins the eye wllhln 24* at an aoale.,-eater than 30°,
both the J/)2" and 1/64" incn,menta w-dearly vlllble.
IJahl Mctcr-(L TS) LM-00 I Uaht intensity @ appraximatdy 12" wu 184 fc.
In conclusion, 1his demonstration qualifiea the adequacy ofTriVis Inc. Visual procedure, QP-9.201, Revision 01.
\\em~~,ned by David Jfeclcsel (LTS)
David Heclue!
Leak Testing Specialists, Inc.
Levelll VT Note: Because this qualification letter is written to the TriVis core document QP-9.201, correlation is I recognized between said document and this project specific document (12751-MNGP-QP-9.201 Rev 0).
11