ML18138A110

From kanterella
Jump to navigation Jump to search

Enclosurequest for Additional Information (Letter to E. D. Schrull Request for Additional Information Regarding Tennessee Valley Authority'S Decommissioning Funding Plan Update for Browns Ferry and Sequoyah Isfsis)
ML18138A110
Person / Time
Site: Browns Ferry, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/17/2018
From: Pamela Longmire
Spent Fuel Licensing Branch
To: Schrull E
Tennessee Valley Authority
Longmire P
Shared Package
ML18138A109 List:
References
CAC 001028, EPID L-2017-FPR-0009, EPID L-2017-FPR-0064
Download: ML18138A110 (1)


Text

REQUEST FOR ADDITIONAL INFORMATION REGARDING TENNESSE VALLEY AUTHORITYS DECOMMISSIONING FUND PLAN UPDATE FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 AND SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

Background

By letter dated December 17, 2015, Tennessee Valley Authority (TVA) submitted, for U.S.

Nuclear Regulatory Commission (NRC) staff review and approval, a DFP update for the independent spent fuel storage installation (ISFSI) at Browns Ferry Nuclear Plant, Units 1, 2, and 3 and Sequoyah Nuclear Plant, Units 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15352A046). The NRC staff reviewed TVAs DFP update and believes TVAs submittal was not sufficient to meet the intent of the requirement in 72.30(c). The DFP update does not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.

Request for Additional Information 1 (RAI)

Provide a revised DFP that includes the effect on decommissioning costs of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

Enclosure