Letter Sequence Other |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2017-LLE-0029, Package: First Request for Additional Information for Review of Exemption Request for Five Nonconforming Dry Shielded Canisters 11 Through 15 (CAC No. 001028, Docket No. 72-58, EPID L-2017-LLE-0029) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI 2018-01-11
[Table View] |
Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel| ML18100A191 |
| Person / Time |
|---|
| Site: |
Monticello  |
|---|
| Issue date: |
01/30/2014 |
|---|
| From: |
Rich Smith Northern States Power Company, Minnesota, Structural Integrity Associates, TriVis |
|---|
| To: |
Becka J Office of Nuclear Material Safety and Safeguards, Xcel Energy |
|---|
| Shared Package |
|---|
| ML18100A173 |
List: |
|---|
| References |
|---|
| CAC 001028, EPID L-2017-LLE-0029, L-MT-18-013 130415.402, Rev 0 |
| Download: ML18100A191 (4) |
|
Text
ENCLOSURE 9 STRUCTURAL INTEGRITY ASSOCIATES, INC. REPORT 130415.402, REVISION 0 REVIEW OF TRIVIS INC. WELDING PROCEDURES USED FOR FIELD WELDS ON THE TRANS NUCLEAR NU HOMS 618TH TYPE 1 & 2 TRANSPORTABLE CANISTER FOR BWR FUEL 3 pages follow
IJ Structural Integrity Associates, Inc.
January 30, 2014 Report No. 1301415.402.RO Quality Program: D Nuclear C2J Commercial Mr. James F. Becka Xcel Energy Project Supervisor-2013 DFS Loading Campaign Monticello Nuclear Generating Plant 2807 W. Country Road 75 Monticello, MN 55362 11515 Vanstory Drive Suite 125 Huntersville, NC 28078 Phone: 704-597-5554 Fax 704-597-0335 www.structint.com rsmith@structint.com
Subject:
Review ofTRNIS INC Welding Procedures used for Field Welds on the Transnuclear NUHOMS 6 lBTH Type 1 & 2 Transportable Canister for BWR Fuel
References:
Dear Jim:
- 1.
Transnuclear Drawing Number NUH61BTH-4008, Sheet 1 of 1, dated 3/23/10
- 2.
Tri Vis Inc. WPS SS-8-A-TN Rev 8 Manual GTA W P8 to P8, dated 4/27/2011
- 3.
TriVis Inc.WPS SS-8-M-TN Rev 10 Automatic GTAW P8 to P8, dated 4/27/20 11
- 4.
TriVis Inc. Procedure Qualification Record N.l Rev. 2, dated 8/4/2010
- 5.
TriVis Inc. Welding Program QP-9.0 Rev 8
- 6.
TriVis Inc. Control of Welding and Brazing Procedure Specifications-W AP-1 R4
- 7.
TriVis Inc. Control of Welding and Welding Operator Qualification-WAP-2 RS
- 8.
TriVis Inc. Welding Administrative Procedure Control of Filler Metal-WAP-3 R4
- 9.
Transnuclear Drawing Number NUH61BTH-300 l Rev 1, Sheet 1 of 3, 3/15/2011
- 10. Transnuclear Drawing Number NUH61BTH-3000 Rev 1, Sheet 1 of 3, 3/15/2011 In accordance with your request for me to review the welding procedures to determine if the welding associated with the closure welds of the subject storage canisters at Monticello Nuclear Generating Plant produced suitable quality welds, I have reviewed the available information to evaluate what can be stated with particular focus on the top cover plate closure welds. I had indicated that a full determination was not possible because neither weld data sheets nor signed weld travelers were available for review to document how the individual welds were performed.
However, I have reviewed the available documentation that addresses 1) the materials welded (References 9 & 10), the welding procedures (References 2 & 3) and supporting PQR (Reference 4), the welding program (Reference 5), the programmatic information describing control of the welding specifications (Reference 6), welding consumables (Reference 8), and the
Toll-Free 877-474-7693 AJcron, OH Albuquerqut, NM Austtn, TX Chal10ltl, NC Cllatla11009a, TN Clllcago, IL 330-899-9753 505-872--0123 512-533-9191 704-597-5554 423-553-1180 81H48-2519
°"""* co Mystic, CT Poughkllpsll, NY san Diego, CA san JOSI, CA stlll COlllgl, PA TO!Vllto, C3Nda 303-792--0077 860-536*3982 845-454-6100 858-455-6350 408-978-8200 814-954-7776 905-829-9817
James F. Becka, Xcel Energy Report No. 1301415.402.RO January 30, 2014 Page 2 of 3 welder/operator qualifications (Reference 7). Reference 1 provides the identification of the field welds, the weld joints and the required inspections.
The above documentation controls the welding of stainless steel to stainless steel joints (both partial penetration and fillet welds). The procedures and documentation is specific to austenitic stainless steel, and in most cases the material is SA 240 Type 304 stainless steel plate and welding consumable is called out as SFA 5.9 ER308 solid wire using gas tungsten arc welding (GTAW). Both manual and machine welding is qualified. Typically, the weld root would be tack welded using manual techniques with the remainder of the weld being applied using machine controls. There are small portions around the circumference of the Top Cover Plate where the closure weld must be manipulated around penetrations that permit evacuating and inerting the canisters.
In addition, there are small closure lids that seal these penetrations.
Manual welding techniques are likely used for these locations.
GTA W is generally known as a high quality process typically having fewer oxides and pores in the weld deposit than is produced with other welding processes such as flux cored, shielded metal arc, gas metal arc, submerged arc, etc. It is recognized that the welding techniques have a significant bearing, but there was nothing found in the welding controls documentation that would suggest the welders and welding operators would have been anything other than competent. In addition, the machine process is repetitive, and unless fusion issues occur due to poor weld bead placement, should produce consistent results. It is also noted that when fusion issues do occur, the extent will typically be significant and readily identified when surface inspections are performed (i.e. liquid dye penetrant, LPT). Even with LPT techniques outside of specifications, fusion issues of this type would develop highly visible dye penetrant indications due to the lengths and the surface breaking nature of fusion defects. Since none of these types of indications were reported, the results suggest that no significant fusion defects would have been produced even with a less than optimum LPT inspection.
The welding consumable used was ER308 stainless steel. This filler metal is characterized as readily weldable with the GTAW process so long as a reasonable inert shielding cover gas is maintained. For these applications 100% welding grade argon is normally used; however, the welding procedure specification only specified use of 100% argon (Reference 3). It was noted that the Procedure Qualification Record (Reference 4) used to support the manual and machine Welding Procedure Specifications specifically identified the use of "Welding Grade" argon.
Additionally, there were no records provided that suggested the inert gas was not maintained.
ER308 filler metal is commonly used to weld Type 304 stainless steel substrates because it contains ample delta ferrite to avoid cracking issues such as hot cracking or ductility dip cracking (microfissures).
The welding characteristics of ER308 filler metal are considered excellent displaying good fluidity and tie-in.
The welding procedures themselves are very detailed and provide sufficient ranges of volts, amps, wire feed rate, and travel speed to weld stainless steel effectively. The manual WPS technique (Reference 2) has a more restricted range of welding currents when compared to the permitted range in the machine procedure WPS (Reference 3).
However, this difference is correct and shows an understanding of the GTA W welding process, because the machine process facilitates the necessary control to balance the wire feed, the travel speed, the current and the arc e
Structural Integrity Associates, Inc.~
James F. Becka, Xcel Energy Report No. 1301415.402.RO January 30, 2014 Page 3 of 3 length (voltage) to achieve a quality weld. Both manual and machine welding procedures prohibit autogenous (no filler wire added) welds and this also will help to minimize microfissures. The requirement to apply a minimum of two weld passes is known to help the welder insure complete root and sidewall fusion for both partial penetration and fillet welds. In fact the large top closure plate weld requires more than two passes to complete the required designed groove weld.
It is impossible to estimate the welding residual stresses that might be produced without the benefit of detailed welding techniques. A good estimate of a typical groove weld is something near yield strength of the substrate material -Type 304 plate or forging material.
The maximum welding interpass temperature is 350°F, and this is used to insure that the cooling rates will be sufficiently fast so as to minimize grain boundary sensitization of the weld heat affected zone. This is a typical requirement for welding austenitic stainless steels and likely will not affect the weld quality one way or the other. It is not stated in the documentation, but intergranular stress corrosion cracking is apparently not a concern for the canisters since low carbon grade stainless steels were not specified. It is noted that modem steelmaking often produces plates and forgings that are dual certified (i.e. meets the tensile strength requirements of regular grade but has the lower carbon content of L-grades). The ER308 welding consumables also are typically dual certified.
In conclusion, the information reviewed above indicates that the GTAW welds in the subject spent fuel canisters can reasonably be expected to be of good quality and free of injurious defects. This expectation is based on the characteristics of the GTA W weld, the excellent controls outlined for the welding program, and the fact that the welds and base materials are austenitic stainless steel.
Also the welding consumables are compatible with the structural materials used in the design. No weld data sheets nor welding travelers were available for evaluation and the inspections applied were found to have used dwell times that were inconsistent with the procedures (at least on canister No. 16), but the welding program controls are well structured and suggest the proper application of a quality welding process - Gas Tungsten Arc Welding (machine).
Best regards, Richard E. Smith, PhD., FA WS Chief Welding Engineer Structural Integrity Associates res e
Structural Integrity Associates, Inc.~