ML20015A452
Letter Sequence Supplement | |
---|---|
Initiation
Administration Questions
Answers Results
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19150A559, ML19182A107, ML20009D008, ML20010D564, ML20015A450, ML20015A451, ML20015A454, ML20028E845, ML20028E846, ML20049A082, ML20052E146, ML20052E154, ML20065N281, ML20071F156, ML20076D696, ML20099A180, ML20104C015, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20136A050, ML20136A051, ML20150A421, ML20155K741, ML20155K743, ML20155K744, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20261H420, ML20269A259, ML20279A577, ML20279A586, ML20289A493, ML20314A190, ML20344A353... further results | |
MONTHYEARML20052D9362018-07-0303 July 2018
[Table View]Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Project stage: Request ML18267A2142018-08-29029 August 2018, 25 September 2018 Package: Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Request ML18267A2112018-09-25025 September 2018 Memorandum to A. Rivera-Varona Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Meeting ML18320A1842018-11-16016 November 2018 Letter to J. Isakson Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI, Part 1 (W/Enclosure 1) Project stage: RAI ML19032A2302019-02-0404 February 2019 Summary of Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the Interim Storage Partner Consolidated Isfs Application for a Facility at Andrews County, Texas (W/Encl. 1&2) Project stage: RAI ML19065A0192019-03-0606 March 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the WCS Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72.1050 - First Request for RAI Part 2 (W/Enclosure 1) Project stage: RAI ML19072A1562019-03-14014 March 2019 Summary of Partially Closed Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the ISP Cisf Application for a Facility at Andrew'S County, Tx (W/Encl. 1&2) Project stage: RAI ML19126A0682019-04-0303 April 2019, 6 May 2019 Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas Project stage: Request ML19105B2172019-04-19019 April 2019 Memorandum to C. Regan Summary of March 20, 2019, Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the Interim Storage Partners Consolidated Isf Application (W/Enclosures 1 and 2) Project stage: RAI ML19120A4282019-04-23023 April 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI (W/Enclosure) Project stage: RAI ML19126A0662019-05-0606 May 2019 Memorandum to C. Regan Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas (W/Enclosure 1 & 2) Project stage: RAI ML20015A4502019-05-31031 May 2019 Sprint Andrews County Disposal Facility, Andrews County, Texas- Railroad Commission of Texas Commercial Processing and Disposal Facility Permit Application Project stage: Other ML19150A5592019-06-0303 June 2019 Letter to J. Isakson Site Audit Plan for Interim Storage Partners Proposed Application for a Site-Specific License of an Away-from-Reactor Independent Spent Fuel Storage Installation Project stage: Other ML19182A1072019-07-0101 July 2019 Letter to J. Isakson Interim Storage Partners Llc'S Application for a Specific ISFSI for the Waste Control Specialists Consolidated Interim Storage Facility for Spent Nuclear Fuel - Revised Review Schedule Project stage: Other ML20015A4512019-08-22022 August 2019 Report No. R1432-01, Acoustical Analysis of ISP Cisf Project stage: Other ML20015A4542019-11-30030 November 2019 Socioeconomic Impacts of the Proposed Spent Nuclear Fuel Consolidated Interim Storage Facility, Andrews County, Texas, Revision 5 Project stage: Other ML19354A7142019-12-20020 December 2019 Approval of Tn America Request for Withholding Information from Public Disclosure for Coc 1029 Renewal Request for Supplemental Information Responses (CAC No. 001028) Project stage: Withholding Request Acceptance ML20015A4522020-01-0606 January 2020 Interim Storage Partners LLC - Submittal of Supplemental Information in Support of RAI, Part 3 - Clarification Related to the Response to RAI AQ-6 Project stage: Supplement ML20009D0082020-01-0606 January 2020 Acknowledgement of NRC Receipt of CoC 1025 (NAC-MPC) Renewal Application Project stage: Other ML20009D0512020-01-0606 January 2020 Notification of NRC Acceptance of the Standardized Advanced NUHOMS CoC 1029 Renewal Application for Review Project stage: Acceptance Review ML20010D5642020-01-10010 January 2020 Proprietary Determination Letter for HI-STAR 100 CoC Renewal Submittals Project stage: Other ML20028E8452020-01-17017 January 2020 Enclosure 1 - Affidavits Project stage: Other ML20028E8462020-01-17017 January 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20031D0562020-01-29029 January 2020 Interim Storage Partners, LLC - Submittal of ISP Updated Draft Responses for Rals NP-8-1, NP-8-2 and Associated SAR Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20034E8352020-02-0303 February 2020 Letter-Materials Request for Additional Information Clarification with Enclosure Project stage: RAI ML20034E9872020-02-11011 February 2020 Meeting Summary - Meeting with Westinghouse Electric Company, LLC, Pre-Application Amendment No. 5 of Storage CoC No. 1026 for the Fuelsolutions Spent Fuel Management System, November 21, 2019 Project stage: Meeting ML20052D9962020-02-14014 February 2020 Interim Storage Partners, LLC - Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML20052E1462020-02-17017 February 2020 Interim Storage Partners, LLC - Submittal of Revision 3 of the Environmental Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20052E1542020-02-17017 February 2020 WCS Consolidated Interim Spent Fuel Storage Facility Environmental Report, Revision 3 - Part 2 of 3 Project stage: Other ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of NRCs Environmental Review Project stage: Supplement ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support NRCs Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other 2019-08-22 |
ML20015A452 | |
Person / Time | |
---|---|
Site: | Consolidated Interim Storage Facility |
Issue date: | 01/06/2020 |
From: | Consolidated Interim Storage Facility |
To: | Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML20015A448 | List: |
References | |
CAC 001028, E-55737, EPID L-2017-NEW-0002 | |
Download: ML20015A452 (1) | |
Similar Documents at Consolidated Interim Storage Facility | |
---|---|
Category:Report
MONTHYEARML24295A0752024-09-10010 September 2024
[Table view]Letter - E.C. Allison to R Lewis, 09-10-2024 (Short Version) ML24260A1162024-09-10010 September 2024 Letter - E.C. Allison to K. Morgan-Butler, 09-10-2024 (Short Version) ML24260A1172024-09-10010 September 2024 Letter - E.C. Allison to C. Roman, 09-10-24 (Short Version) ML24257A0782024-09-10010 September 2024 Letter -E.C. Allison to J Lubinski, 09-10-24 (Full Report Version) ML24257A1782024-09-10010 September 2024 Letter - E.C. Allison to Helton, 09-10-24 (Short Version) ML24257A1792024-09-10010 September 2024 Letter - E.C. Allison to Helton 9-10-24 (Full Report Version) ML24299A2562024-09-0909 September 2024 (External) Holtec Rpt. Final Report v2. 090924 - Sent to R Lewis 09-10-2024 from E.C. Allison (Flashdrive) ML24268A1252024-09-0909 September 2024 (External) Holtec Rpt. Final Report v2. 090924 - Sent to KMorgan-Butler 09-10-2024 from E.C. Allison (Flashdrive) ML24268A1242024-09-0909 September 2024 (External) Holtec Rpt. Final Report v2. 090924 - Sent to C Roman 09-10-2024 from E.C. Allison (Flashdrive) ML24257A1812024-09-0303 September 2024 Letter - E.C. Allison to Helton 9-03-24 (Full Report Version) ML24260A1152024-09-0303 September 2024 Letter - E.C. Allison to K. Morgan-Butler, 09-03-24 (Short Version) ML24268A1272024-09-0303 September 2024 (External) Holtec Rpt. Final Report. 090324 - Sent to Helton 09-03-2024 from E.C. Allison (Flashdrive) ML24268A1262024-09-0303 September 2024 (External) Holtec Rpt. Final Report. 090324 - Sent to KMorgan-Butler 09-03-2024 from E.C. Allison (Flashdrive) ML21188A1012021-09-13013 September 2021 Public Final Safety Evaluation Report, Interim Storage Partners, Materials License SNM-2515, WCS Consolidated Interim Storage Facility ISFSI ML21188A0982021-09-13013 September 2021 License Preamble, Interim Storage Partners, Issuance of Materials License SNM-2515, WCS Consolidated Interim Storage Facility ISFSI ML21258A4022021-09-12012 September 2021 Letter from Michael Ford Re Comments on Final Environmental Impact Statement for Interim Storage Partners License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A4072021-09-10010 September 2021 Letter from Texas Riogrande Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A3982021-09-0303 September 2021 Letter from Lone Star Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21105A7712021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML21105A7592021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML21105A7602021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML21105A7612021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs ML21105A7622021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML21105A7632021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, ML21105A7652021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden ML21105A7852021-04-12012 April 2021 Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public Version ML21105A7972021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML21105A7922021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15 ML21105A7822021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML21105A7802021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2 ML21105A7792021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers ML21105A7772021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year ML21105A7672021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML21105A7642021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML21154A2992021-03-23023 March 2021 Fws Updated List of Threatened and Endangered Species for the Proposed ISP CISF ML21155A1432021-03-15015 March 2021 A Demographic Profile: Combined Area (Andrews County, Tx; Gaines County, Tx; Lea County, Nm) ML21154A2962021-02-19019 February 2021 Profile of Socioeconomic Trends: Combined Area (Andrews County, Tx; Gaines County, Tx; Lea County, Nm) ML21027A1472021-01-27027 January 2021 Supplemental Information Part 2 to Support NRCs Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support NRCs Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML20261H4662020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers ML20261H4222020-09-0202 September 2020 WCS CISF - Affidavit ML20261H4522020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2 ML20261H4542020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML20261H4562020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML20261H4682020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15 ML20261H4672020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML20261H4652020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML20261H4642020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML20261H4632020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3 ML20261H4612020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF 2024-09-09 Category:Technical MONTHYEARML21258A4022021-09-12012 September 2021
[Table view]Letter from Michael Ford Re Comments on Final Environmental Impact Statement for Interim Storage Partners License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A4072021-09-10010 September 2021 Letter from Texas Riogrande Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21258A3982021-09-0303 September 2021 Letter from Lone Star Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners License Application for a Consolidated Interim Storage Facility in Andrews County, Texas ML21105A7852021-04-12012 April 2021 Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public Version ML21105A7592021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML21105A7602021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML21105A7612021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs ML21105A7622021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML21105A7632021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, ML21105A7642021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML21105A7652021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden ML21105A7672021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML21105A7712021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML21105A7772021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year ML21105A7802021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2 ML21105A7822021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML21105A7922021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15 ML21105A7972021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML21105A7792021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers ML21027A1472021-01-27027 January 2021 Supplemental Information Part 2 to Support NRCs Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support NRCs Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML20261H4542020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML20261H4632020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3 ML20261H4522020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2 ML20261H4552020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML20261H4562020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML20261H4572020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year and PMP Water Surface Profiles Profiles, 4 of 5 ML20261H4582020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model or the Calculation of the 500-Year and PMP Water Surface Profiles Antecedent Moisture Condition III, 5 of 5 ML20261H4592020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs ML20261H4222020-09-0202 September 2020 WCS CISF - Affidavit ML20261H4602020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML20261H4612020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML20261H4642020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML20261H4652020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML20261H4662020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers ML20261H4672020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML20261H4682020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15 ML20128J3002020-04-28028 April 2020 Attachment 7: HI-STORM 100 FSAR Proposed Changed Pages ML20128J2992020-04-28028 April 2020 Attachment 6: HI-STORM 100 FSAR Proposed Changed Pages ML20104C0522020-03-31031 March 2020 Attachment 4: Proposed HI-STORM Umax FSAR Supplement I, Revision 3.I ML20101P4062020-03-31031 March 2020 Draft RAI Responses with Associated SAR Change Pages ML20015A4522020-01-0606 January 2020 Interim Storage Partners LLC - Submittal of Supplemental Information in Support of RAI, Part 3 - Clarification Related to the Response to RAI AQ-6 ML20015A4542019-11-30030 November 2019 Socioeconomic Impacts of the Proposed Spent Nuclear Fuel Consolidated Interim Storage Facility, Andrews County, Texas, Revision 5 ML20015A4512019-08-22022 August 2019 Report No. R1432-01, Acoustical Analysis of ISP Cisf ML20015A4502019-05-31031 May 2019 Sprint Andrews County Disposal Facility, Andrews County, Texas- Railroad Commission of Texas Commercial Processing and Disposal Facility Permit Application 2021-09-03 Category:Response to Request for Additional Information (RAI) MONTHYEARML20105A1392020-04-0707 April 2020
[Table view]Enclosure 8 - Referenced Documents ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses ML20104C0502020-03-31031 March 2020 Attachment 2: HI-STORM Umax Amendment Request 3 RAI Responses ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information ML20101P4062020-03-31031 March 2020 Draft RAI Responses with Associated SAR Change Pages ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages ML20031D0562020-01-29029 January 2020 Interim Storage Partners, LLC - Submittal of ISP Updated Draft Responses for Rals NP-8-1, NP-8-2 and Associated SAR Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML20028E8462020-01-17017 January 2020 Enclosure 3 - RAIs and Responses ML20015A4522020-01-0606 January 2020 Interim Storage Partners LLC - Submittal of Supplemental Information in Support of RAI, Part 3 - Clarification Related to the Response to RAI AQ-6 2020-04-07 |
Text
Enclosure 3 to E-55737 Clarification to Response to RAI AQ-6 Page 1 of 1 ISP has identified two items related to the response to RAI AQ-6 for which clarification may be useful to NRC Staff.
- 1. Total NO2 impact (µg/m3) provided in Environmental Report (ER) Table 4.6-1 and Table 4.6-2
==
Description:==
The total NO2 impact provided in Table 4.6-1 and Table 4.6-2 are both 33.17 µg/m3 even though Table 4.6-1 is for Phase 1 activities, and Table 4.6-2 is for Phases 2 - 8 and Operations. Given that the inputs are significantly different for the calculations in each table, it may seem peculiar that both totals are identical.
Clarification: The footnotes indicate in each U.S. National Ambient Air Quality Standards (NAAQS) table that the total impacts are the maximum of activities not expected to take place simultaneously. For the activities associated with Phase 1 (Table 4.6-1), the total is the maximum of 1) Earthwork activities; 2) the sum of Cask and Admin Building construction; and 3) the sum of Spent Nuclear Fuel (SNF) Pad and Protected area construction, since the sum of SNF Pad and Protected Area construction (Activity 3) results in the maximum value of 33.17 µg/m3 reported in Table 4.6-1. Likewise, for activities associated with Phase 2 and Operations (Table 4.6-2), the total is the maximum of simultaneous activities, which again, is the sum of that which is in the SNF Pad and Protected Area construction for a given phase and is, therefore, once again 33.17 µg/m3 reported in Table 4.6-2.
- 2. Basis for National Ambient Air Quality Standards (NAAQS) values
==
Description:==
NAAQS values can be design or maximum values. Given that typically design and maximum values differ, the clarification below provides a discussion about which values were used in ISPs evaluations.
Clarification: Design values were not available to be used as background concentrations from the Environmental Protection Agencys (EPAs) Office of Air Quality Planning and Standards at the time of the evaluation. The EPA releases design values annually for areas that are not in attainment with the NAAQS. Since Andrews County is in attainment with NAAQS, design values are not published. Therefore, background concentrations were evaluated using the most recent ambient air quality data from the closest Texas Commission on Environmental Quality ambient air monitors within the state of Texas.
For sites where the maximum monthly pollutant concentration did not appear to be an outlier as it related to the monthly average, the maximum concentration was used as a background for the evaluation. For sites where the most recent monthly data appeared to have a maximum value that did not align with the monthly average and was likely affected by an emission upset event at a nearby unrelated facility, the monthly average was used so as to represent the most accurate impact as it relates to ambient data.
Since many of these monitors that are referenced are located in areas where there is either a high density of population or industrial activity, this approach would serve as a conservative surrogate for background concentrations relative to the WCS CISF site.