Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59)
ML18094B092
Person / Time
Site: Palisades, Indian Point, Pilgrim, Vermont Yankee, Big Rock Point, FitzPatrick  Entergy icon.png
Issue date: 04/05/2018
From: Pamela Longmire
Spent Fuel Licensing Branch
To: Ford B
Entergy Operations
Longmire P
Shared Package
ML18094B091 List:
References
CAC 001028, EPID No.: L-2017-FPR-0007, EPID No.: L-2017-FPR-0026, EPID No.: L-2017-FPR-0035, EPID No.: L-2017-FPR-0050, EPID No.: L-2017-FPR-0054, EPID No.: L-2017-FPR-0071
Download: ML18094B092 (1)


Text

Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING ENTERGY NUCLEAR OPERATIONS, INC.S DECOMMISSIONING FUNDING PLAN UPDATE FOR BIG ROCK POINT, INDIAN POINT NUCLEAR GENERATING STATIONS UNITS 1, 2, AND 3, PILGRIM NUCLEAR POWER STATION, PALISADES NUCLEAR PLANT, JAMES A. FITZPATRICK NUCLEAR POWER PLANT, AND VERMONT YANKEE NUCLEAR POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS DOCKET NOS. 72-43, 72-51, 72-1044, 72-07, 72-12, 72-59 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

=

Background===

By letter dated December 17, 2015, Entergy Nuclear Operations, Inc. (Entergy) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, decommissioning funding plan updates (DFP Updates) for the independent spent fuel storage installations at Big Rock Point, Indian Point Nuclear Generating Stations Units 1, 2, and 3 (Indian Point 1, 2, and 3), Pilgrim Nuclear Power Station (Pilgrim), Palisades Nuclear Plant (Palisades), James A.

FitzPatrick Nuclear Power Plant (FitzPatrick), and Vermont Yankee Nuclear Power Station (Vermont Yankee). (Agencywide Documents Access and Management System Accession No. ML15351A524). The NRC staff reviewed Entergys DFP updates for each ISFSI and believes Entergys submittal was not sufficient to meet the intent of the requirement in 72.30(c).

Specifically, the DFP updates do not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-(4) have been specifically considered.

RAI 1

For each ISFSI, provide a revised DFP that includes the effect on decommissioning costs of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.