MONTHYEARML18101A0242018-03-31031 March 2018 Rancho Seco ISFSI - License Renewal Application, Revision 0 Project stage: Other ML18108A0522018-04-12012 April 2018 E-mail from W. Reed/Dsfm to D. Tallman/Sacramento Municipal Utility District/Rancho Seco Assets Acknowledgement of Rancho Seco ISFSI Renewal Application Project stage: Other ML18150A0862018-05-29029 May 2018 Letter to D. Tallman Request for Supplemental Information for Acceptance Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosursi and Observations) Project stage: Acceptance Review ML18179A2662018-06-25025 June 2018 Enclosure 10 - California All Purpose Acknowledgment of Smud Affirmation Pursuant to 10 CFR 72.16(b) Project stage: Other ML18179A2582018-06-25025 June 2018 Enclosure 2 - Rsi and Observations and Responses Project stage: Other ML18179A2562018-06-25025 June 2018 Transmittal of Response to Request for Supplemental Information for Acceptance Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spent Fuel Storage Ins Project stage: Response to RAI ML18179A2602018-06-30030 June 2018 Enclosure 4 - Rancho Seco ISFSI License Renewal Application, Revision 1 (Non-Proprietary Version) Project stage: Other ML18201A4552018-07-20020 July 2018 Letter to D. Tallman Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM 2510 - Accepted for Review (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Other ML18215A3702018-08-0303 August 2018 08/03/2018, Conversation Record with D. Shaw (Tn) Discuss Declared Proprietary Information in License Renewal Application (Conversation Held on July 20, 2018) Project stage: Other ML18261A0102018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18261A0222018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18261A0312018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) Project stage: Withholding Request Acceptance ML18285A3812018-09-26026 September 2018 Transmittal of Response to Request for Information for Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spend Fuel Storage Installation Project stage: Response to RAI ML19168A0582019-06-13013 June 2019 Letter to D. Tallman Request for Clarification of Response to Additional Information for the Technical Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosure) Project stage: Approval ML19280B7632019-09-30030 September 2019 Letter to D. Tallman Nuclear Regulatory Commission Approval If Sacramento Municipal Utility District Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI Project stage: Withholding Request Acceptance ML19280B2502019-09-30030 September 2019 Conversation Record with D. Tallman/Smud Discuss California Department of Fish and Wildlife Recommendations for the California Tiger Salamander, Conversation Held on September 24, 2019 Project stage: Other ML20044F6012020-02-24024 February 2020 ISFSI Renewal Proprietary Determination Letter for RAI Clarification Submittal 7-12-19 Project stage: RAI ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20065N2822020-03-0909 March 2020 ISFSI Renewed License Project stage: Other ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other 2018-09-14
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 07200011/20244012024-08-16016 August 2024 Security Baseline Inspection Report 07200011/2024401 ML23137A1442023-05-0303 May 2023 Sacramento Municipal Utility District (Smud) - Submittal of 2022 Annual Financial Report ML23115A1722023-03-27027 March 2023 Sacramento Municipal Utility District (Smud), Rancho Seco Report on Financial Assurance Status ML23040A0582023-01-31031 January 2023 Annual Radiological Environmental Operating Report for the Period of January 1, 2022, Through December 31, 2022 ML22203A0552022-06-30030 June 2022 Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update ML22200A0272022-06-29029 June 2022 Independent Spent Fuel Storage Installation, Final Safety Analysis Report, Revision 10 ML22158A2262022-05-25025 May 2022 Smud, Rancho Seco Independent Spent Fuel Storage Installation Biennial 10 CFR 72.48(d)(2) Report ML22125A0972022-04-20020 April 2022 Independent Spent Fuel Storage Installation - 2021 Annual Financial Report IR 07200011/20214012021-12-14014 December 2021 Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07200011/2021401 ML21342A1882021-12-13013 December 2021 Safety Evaluation Report (SER) for the Sacramento Municipal Utility District (Smud) Rancho Seco Quality Manual Revision 5 ML21230A2692021-08-0202 August 2021 Smud, Revised Rancho Seco Quality Manual Request for Approval ML21195A3262021-06-30030 June 2021 Independent Spent Fuel Storage Installation - 2020 Annual Financial Report ML21050A3212021-05-18018 May 2021 the Nuclear Regulatory Commission'S Analysis of Sacramento Municipal Utility District'S Initial and Updated Decommissioning Funding Plans for Rancho Seco Nuclear Generating Station'S Independent Spent Fuel Storage Installation ML21140A3632021-04-20020 April 2021 Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report for 2020 IR 07200011/20210012021-03-25025 March 2021 Independent Spent Fuel Storage Installation - NRC Inspection Report 07200011/2021-001 ML21131A0962021-03-24024 March 2021 Submittal of Rancho Seco Independent Spent Fuel Storage Installation 10 CFR 73.71 Safeguards Event 55085 60-Day Report ML20342A1942020-09-23023 September 2020 Report of Changes to the Physical Protection Plan (Amendment 9) Transmittal Letter ML20206K9582020-06-29029 June 2020 ISFSI Final Analysis Report, Revision 9 ML20108F5662020-03-31031 March 2020 Report on Financial Assurance Status ML20108F5332020-03-30030 March 2020 Annual Report of Property Insurance Levels ML20066L4962020-03-10010 March 2020 Letter to D. Tallman Final Environmental Assessment for the License Renewal of the U.S. NRC License No.: SNM-2510 for Rancho Seco ISFSI (Dkt No. 72-0011) ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter ML20044F6012020-02-24024 February 2020 ISFSI Renewal Proprietary Determination Letter for RAI Clarification Submittal 7-12-19 ML19280B7632019-09-30030 September 2019 Letter to D. Tallman Nuclear Regulatory Commission Approval If Sacramento Municipal Utility District Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI IR 07200011/20194012019-09-16016 September 2019 Rancho Seco Independent Spent Fuel Storage Installation, Revised Physical Security Requirements for Independent Spent Fuel Storage Installations and Inspection Report 072-00011/2019401 ML19206A5872019-07-25025 July 2019 Independent Spent Fuel Storage Installation, Physical Security Requirements for Independent Spent Fuel Storage Installations and Inspection Report 072-00011/2019401 ML19168A0582019-06-13013 June 2019 Letter to D. Tallman Request for Clarification of Response to Additional Information for the Technical Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosure) ML19070A0722019-06-12012 June 2019 Letter to Transmit Draft Rancho Seco ISFSI EA to State of California (Publically Available) ML19025A0822019-01-10010 January 2019 Rancho Seco Nuclear Generating Station - Report of Changes to the Rancho Seco Quality Assurance Program That Do Not Require Prior NRC Approval ML18341A2792019-01-0909 January 2019 Letter to Chairperson of Buena Vista Rancheria of Me-Wuk Indians of California - Tribal Consultation Letter and Enclosure ML19009A4232019-01-0909 January 2019 Letter to Chairman of Colfax-Todds Valley Consolidated Tribe - Tribal Consultation Letter and Enclosure ML19009A4242019-01-0909 January 2019 Letter to Chairperson of Tsi Akim Maidu Tribe - Tribal Consultation Letter and Enclosure ML19009A4252019-01-0909 January 2019 Letter to Chairperson of Ione Band of Miwok Indians - Tribal Consultation Letter and Enclosure ML19009A4262019-01-0909 January 2019 Letter to Chairperson of the Nashville Enterprise Miwok-Maidu-Nishinam Tribe - Tribal Consultation Letter and Enclosure ML19009A4272019-01-0909 January 2019 Letter to Chairperson of the United Auburn Indian Community of the Auburn Rancheria - Tribal Consultation Letter and Enclosure ML19009A4282019-01-0909 January 2019 Letter to the Chairperson of the Shingle Springs Band of Miwok Indians - Tribal Consultation Letter and Enclosure ML19009A4292019-01-0909 January 2019 Letter to the Chairperson of the Wilton Rancheria - Tribal Consultation Letter and Enclosure ML18324A8222018-12-14014 December 2018 Letter to Mr. Kevin Thomas, Acting Regional Manager; Re., Rancho Seco - California Fish and Wildlife Consultation Letter and Enclosure ML18325A0422018-12-14014 December 2018 California Shpo Consultation Letter to J. Polanco and Enclosure ML18302A1582018-11-28028 November 2018 Revised Letter for Termination of Rancho Seco Nuclear Generating Station Operating License DPR-54 and Indemnity Agreement ML18325A1422018-11-20020 November 2018 Letter to D. Tallman Request for Additional Information for Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0 ML18285A3812018-09-26026 September 2018 Transmittal of Response to Request for Information for Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spend Fuel Storage Installation ML18261A0222018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) ML18261A0102018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) ML18261A0312018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) IR 05000312/20180012018-09-0505 September 2018 Independent Spent Fuel Storage Installation (ISFSI) Inspection Report 05000312/2018001 and 07200011/2018001 ML18201A4552018-07-20020 July 2018 Letter to D. Tallman Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM 2510 - Accepted for Review (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) ML18179A2562018-06-25025 June 2018 Transmittal of Response to Request for Supplemental Information for Acceptance Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spent Fuel Storage Ins ML18150A0862018-05-29029 May 2018 Letter to D. Tallman Request for Supplemental Information for Acceptance Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosursi and Observations) 2024-08-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 13, 2019 Mr. Dan Tallman Manager, Rancho Seco Assets Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station 14440 Twin Cities Road Herald, CA 95638-9799
SUBJECT:
REQUEST FOR CLARIFICATION OF RESPONSE TO ADDITIONAL INFORMATION FOR THE TECHNICAL REVIEW OF THE APPLICATION FOR RENEWAL OF THE RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE NO. SNM-2510 (CAC/EPID NOS. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004)
Dear Mr. Tallman:
By letter dated March 19, 2018, as supplemented on June 25, 2018, and September 26, 2018, the Sacramento Municipal Utility District (SMUD) submitted an application for renewal of the Rancho Seco Independent Spent Fuel Storage Installation, License No. SNM-2510 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18221A281). The U.S. Nuclear Regulatory Commission (NRC) staff sent a request for additional information (RAI) related to the technical review of the renewal application on November 20, 2018, to which you responded on April 22, 2019 (ML19121A262).
The NRC staff reviewed SMUDs RAI responses and held a teleconference with SMUD on June 4, 2019, to discuss the responses provided (see June 4, 2019, meeting summary at ADAMS Accession No. ML19165A246). After the discussion, SMUD requested that NRC send its remaining questions related to the RAI responses in writing. The enclosure to this letter provides the remaining information needed by the NRC staff to complete its technical review of the application. We request that you provide this information by July 12, 2019.
Please reference Docket No. 72-11 and CAC/EPID No. 001028/L-2018-RNW-0005 in future correspondence related to this request. The NRC staff is available to clarify these questions and, if necessary, to meet and discuss your proposed responses.
D. Tallman 2 If you have any questions regarding this matter, please contact me at (301) 415-7213 or Wendy.Reed@nrc.gov.
Sincerely,
/RA/
Wendy A. Reed, Chemist Renewals and Materials Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-11 License No.: SNM-2510 CAC/EPID Nos.: 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004
Enclosures:
RAI clarification request cc: Rancho Seco ISFSI Service List
Rancho Seco ISFSI Service List cc:
Arlen Orchard, Chief Executive Officer Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, CA 95817 1899 Laura Lewis, Chief Legal Officer Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, CA 95817 1899 Steve Lins, Deputy General Counsel Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, CA 95817 1899 Site Document Control Supervisor Rancho Seco 14440 Twin Cities Road Herald, CA 95638 9799 Commissioners' Office California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 5512 Radiation Program Director California Radiologic Health Branch P.O. Box 997414 (MS 7610)
Sacramento, CA 95899 7414 Sacramento County Board of Supervisors 700 H Street, Suite 2450 Sacramento, CA 95814
ML19168A058 OFFICE NMSS/DSFM/RMB NMSS/DSFM/RMB NMSS/DSFM/CSRB NAME WReed DDunn via email WAllen via email DATE 06/06/2019 06/07/2019 06/07/2019 OFFICE NMSS/DSFM/SFLB NMSS/DSFM/CSRB NMSS/DSFM/RMB NAME WWheatley via email TTate via email MRahimi via email DATE 06/13/2019 06/13/2019 06/12/2019 Request for Additional Information Sacramento Municipal Utility District (SMUD)
Docket No. 72-11 License No. SNM-2510 License Renewal This request for clarification of request for additional information (RAI) responses identifies information needed by the NRC staff to complete its technical review of the license renewal application (LRA) and to determine whether the applicant has demonstrated compliance with the regulatory requirements. The requested information is listed by RAI response number.
RAI 2-1 clarification The staff noted the following regarding information provided in the two cross-matrix tables and additional clarification items identified in Table RAI 2-1-3. Table RAI 2-1-3 was provided in response to RAI 2-1.
- 1. Drawings NUH-05-1022-FO1 through NUH-05-1025-FO1 listed in the first note at the end of LRA Table 2-6 have not been provided to the NRC. Please provide the drawings.
- 2. Drawing NUH-05-1053-FC1 Item 2 "Lead Shielding" for the basket assembly is not included in Table 2-6. This SSC seems to be identical to Drawing NUH-05-4004 Item 3 or Drawing NUH-05-1051-FC1 Item 3 "Lead Shielding" for shell assembly in Table RAI 2-1-1. Please clarify.
- 3. Table RAI 2-1-1 lists drawing NUH-05-1031-FF1 Item 4 "Outer Support Plate" which appears to be incorrect. This SSC should be Drawing NUH-05-1031-FF1 Item 3 "Support Plate". Please clarify.
The information requested in RAI 2-1 is needed to determine compliance with 10 CFR 72.24(c) and 72.42(a).
RAI 2-2 clarification Please clarify the following items identified in Table RAI 2-2-2, which was provided in response to RAI 2-2:
Item #34: The descriptions in LRA Sections B.3.1, B.4.1, B.5.1, B.6.1 and B.3.2, B.4.2, B.5.2, and B.6.2 should be consistent. B.4.1 states: The HSM subcomponents subject to aging management review are constructed of the following materials: B.4.2 states: The HSM subcomponents that are subject to aging management are exposed to the following environments:
Since the aging management review is contained in Section 3 of the LRA and Appendix B is the aging management program description, it appears that aging management review in B.4.1 should be aging management as stated in B.4.2. Please clarify.
Item #35: Please clarify if there is a typo in the change to LRA Sections B.4.4. The NRC staff believes it should read "of the aging effects and/or mechanism listed in Section B.4.3".
1 Enclosure 1
Item #38: Please clarify if there is a typo in the change to LRA Sections B.4.5(3). The NRC staff believes it should read "While no aging mechanisms were identified that would cause other conditions.
Item #43: Please clarify if there is a missing word in the change to LRA Sections B.6.5(3). The NRC believes the following sentence should include the word steel. "(4) loss of material due to general, pitting, and crevice corrosion for carbon steel reinforcing bars.
The information requested in RAI 2-2 is needed to determine compliance with 10 CFR 72.24(c) and 72.42(a).
RAI 2-8 Clarification RAI 2-8 requested, in part, that the licensee provide a justification as to why the guide tubes did not provide a criticality safety function during the extended period of operation. The response to the RAI stated that the guide tubes solely support the structural safety function as shown in LRA Table 2-9, and that this conclusion is solely consistent with the intended safety functions of the components list in Table 4-25 of NUREG-2214, Managing Aging Processes in Storage Report, Draft for Comment (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17289A237).
The NRC bases an ISFSI license renewal on the continuation of the approved design bases through the period of extended operation. After reviewing Section 3.3.4 of the Rancho Seco Final Safety Analysis Report, NRC staff determined that the guide tubes are explicitly modeled in the Rancho Seco criticality safety evaluations. In describing the criticality models, Section 3.3.4.3.1 specifically identifies that a minimum thickness was employed to model the guide tubes. In addition, Section 3.3.4.3.1 also identifies that KENO input files for the criticality calculations can be found in Appendix 6.6.2 of the MP187 Part 71 safety analysis report. NRC staff reviewed these KENO input files and found the guide tubes explicitly identified.
Consequently, the staff found that the explanation provided in the previous paragraph did not adequately justify the licensees scoping determination because the guide tubes serve a criticality function by displacing water which decreases the neutron multiplication factor (keff).
The NRC requests the licensee supplement their response to RAI 2-8 by providing further justification as to why the guide tubes do not perform a criticality safety function during the extended period of operation. Alternatively, the licensee could modify the scoping of the guide tubes to include a criticality function in addition to the structural function for which the guide tubes are currently shown to scope into the renewal review.
The information requested in RAI 2-8 is needed to determine compliance with 10 CFR 72.42(a).
RAI 3-2 Clarification RAI 3-2 Part (ii) requested that the licensee clarify why radiation-induced SCC is determined to be an aging effect requiring management. In the RAI response, the gamma dose rate at the beginning of storage to the end of the period of extended operation was calculated using a conversion factor based on the density of concrete, as per Calculation 502917-0500 (part of the information submitted per the NRCs request for supplemental information (ADAMS Accession No. ML18179A255) in June 2018.
2
The NRC requests the licensee supplement their response to RAI 3-2 by providing an explanation of why a concrete conversion factor was used to calculate dose rate on the canister surface.
The information requested in RAI B-2 is needed to determine compliance with 10 CFR 72.42(a).
RAI 3-5 Clarification Please clarify if microbiological chemical attack should be deleted from the list under Loss of Material in LRA Section 3.6.5. This response is related to the Response to RAI B-1.
The information requested in RAI 3-5 is needed to determine compliance with 10 CFR 72.42(a).
RAI B-2(1) Clarification RAI B-2 (part 1) asked the licensee to address certain inconsistencies detailed in the HSM Aging Management Program (AMP). In the response, SMUD concluded ...that the 10-year inspection frequency referred to in American Concrete Institute (ACI) 349.3R for inaccessible areas and controlled interior environments is appropriate for the inspection frequency of the exterior of the HSM and basemat based on the lack of an aggressive environment and the physical conditions of the HSM and basemat structures.
The NRC notes that the 10 year inspection frequency in ACI 349.3R is for interior environments.
Since the HSMs are stored in an exterior environment, the NRC is requesting that SMUD supplement their response to RAI B-2(1) by providing justification as to why a 10-year inspection interval is appropriate for the HSM AMP.
The information requested in RAI B-2 is needed to determine compliance with 10 CFR 72.24(e) and 72.42(a).
RAI B-4 Clarification Please clarify if LRA Sections 2.3.1, 2.4.3, 3.7.1, 3.7.5.2 need to be revised. The response to the RAI stated that these sections have been revised; however, they have not. This response is related to the Response to RAI B-5(3).
Please clarify whether Section C.2.4.4 for inspection of offsite shipment should be changed to for inspection or offsite shipment.
The information requested in B-4 is needed to determine compliance with 10 CFR 72.42(a).