ML23068A420
ML23068A420 | |
Person / Time | |
---|---|
Site: | Holtec |
Issue date: | 06/29/2023 |
From: | Storage and Transportation Licensing Branch |
To: | Holtec |
Shared Package | |
ML23068A384 | List:
|
References | |
CAC 001028, EPID L-2020-RNW-0007 | |
Download: ML23068A420 (1) | |
Text
RENEWED CERTIFICATE OF COMPLIANCE NO. 1014
APPENDIX A-100U
TECHNICAL SPECIFICATIONS
FOR THE HI-STORM 100 CASK SYSTEM
(MODEL NO. 100U ADDITION)
AMENDMENT NO. 9, REVISION 1 TABLE OF CONTENTS
1.0 USE AND APPLICATION............................................................................... 1.1-1 1.1 Definitions............................................................................................ 1.1-1 1.2 Logical Connectors.............................................................................. 1.1-1 1.3 Completion Times................................................................................ 1.1-1 1.4 Frequency............................................................................................ 1.1-1
2.0 NOT USED..................................................................................................... 2.0-1
3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY............... 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY............................. 3.0-2
3.1 SFSC INTEGRITY............................................................................ 3.1.1-1 3.1.1 Multi-Purpose Canister (MPC)............................................... 3.1.1-1 3.1.2 SFSC Heat Removal System................................................. 3.1.2-1 3.1.3 MPC Cavity Reflooding.......................................................... 3.1.3-1 3.1.4 Deleted................................................................................... 3.1.4-1 3.1.5 Impressed Current Cathodic Protection System (ICCPS)...... 3.1.5-1
3.2 SFSC RADIATION PROTECTION................................................... 3.2.1-1 3.2.1 Not Used................................................................................ 3.2.1-1 3.2.2 TRANSFER CASK Surface Contamination............................ 3.2.2-1 3.2.3 Not Used................................................................................ 3.2.3-1
3.3 SFSC CRITICALITY CONTROL....................................................... 3.3.1-1 3.3.1 Boron Concentration.............................................................. 3.3.1-1
Table 3-1 MPC Cavity Drying Limits.................................................................... 3.4-1 Table 3-2 MPC Helium Backfill Limits.................................................................. 3.4-2
4.0 NOT USED..................................................................................................... 4.0-1
5.0 ADMINISTRATIVE CONTROLS AND PROGRAMS...................................... 5.0-1 5.1 Not Used.............................................................................................. 5.0-1 5.2 Not Used.............................................................................................. 5.0-1 5.3 Not Used.............................................................................................. 5.0-1 5.4 Radioactive Effluent Control Program.................................................. 5.0-1 5.5 Cask Transport Evaluation Program.................................................... 5.0-2 5.6 Not Used.............................................................................................. 5.0-4 5.7 Radiation Protection Program.............................................................. 5.0-5 5.8 Aging Management Program............................................................... 5.0-8
Table 5-1 TRANSFER CASK Lifting Requirements............................................. 5.0-3
Certificate of Compliance No. 1014 i Appendix A-100U Frequency 1.4 1.0 USE AND APPLICATION
1.1 Definitions
Refer to Definitions in Appendix A.
1.2 Logical Connectors
Refer to Logical Connectors in Appendix A
1.3 Completion Times
Refer to Logical Connectors in Appendix A
1.4 Frequency
Refer to Frequency in Appendix A
Certificate of Compliance No. 1014 Appendix A-100U 1.1-1 2.0
2.0
This section is intentionally left blank
Certificate of Compliance No. 1014 Appendix A-100U 2.0-1 LCOApplicability 3.0
3.0 LIMITING CONDITIONS FOR OPERATION (LCO ) APPLICABILITY
LCO 3.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 Not applicable.
LCO 3.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of an SFSC.
LCO 3.0.5 Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing.
Certificate of Compliance No. 1014 Appendix A-100U 3.0-1 LCOApplicability 3.0
3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY
SR 3.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.
SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.
For Frequencies specified as once, the above interval extension does not apply. If a Completion Time requires periodic performance on a once per... basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications.
SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
(continued)
Certificate of Compliance No. 1014 Appendix A-100U 3.0-2 LCOApplicability 3.0
3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY
SR 3.0.3 When the Surveillance is performed within the delay period and the (continued) Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
SR 3.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCO's Surveillances have been met within their specified Frequency. This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with Actions or that are related to the unloading of an SFSC.
Certificate of Compliance No. 1014 3.0-3 Appendix A-100U Multi-Purpose Canister (MPC) 3.1.1
3.1 SFSC INTEGRITY
3.1.1 Multi-Purpose Canister (MPC)
LCO 3.1.1 The MPC shall be dry and helium filled.
Table 3-1 provides decay heat and burnup limits for forced helium dehydration (FHD) and vacuum drying. FHD is not subject to time limits. Vacuum drying is subject to the following time limits, from the end of bulk water removal until the start of helium backfill:
MPC Total Decay Heat (Q) Vacuum Drying Time Limit Q < 26 kW None 26 kW < Q <30 kW 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> Q > 30 kW Not Permitted (see Table 3-1)
APPLICABILITY: During TRANSPORT OPERATIONS and STORAGE OPERATIONS.
ACTIONS
NOTES---------------------------------------------- -----------
Separate Condition entry is allowed for each MPC.
CONDITION REQUIRED ACTIONCOMPLETION TIME
A. MPC cavity vacuumA.1 Perform an engineering 7 days drying pressure or evaluation to determine the demoisturizer exit gas quantity of moisture left in temperature limit notthe MPC.
met. AND
A.2 Develop and initiate 30 days corrective actions necessary to return the MPC to compliance with Table 3-1.
B. MPC cavity vacuumB.1 Backfill the MPC cavity with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> drying acceptance helium to a pressure of at criteria not met during least 0.5 atm.
allowable time.
Certificate of Compliance No. 1014 3.1.1-1 Appendix A-100U Multi-Purpose Canister (MPC) 3.1.1
CONDITION REQUIRED ACTIONCOMPLETION TIME
C. MPC helium backfill limitC.1 Perform an engineering72 hours not met. evaluation to determine the impact of helium differential.
AND C.2.1 Develop and initiate 14 days corrective actions necessary to return the MPC to an analyzed condition by adding helium to or removing helium from the MPC.
C.2.2 Develop and initiate corrective actions necessary to demonstrate through analysis, using the models and methods from the HI-STORM FSAR, that all limits for cask components and contents will be met.
D. MPC helium leak rateD.1 Perform an engineering24 hours limit for vent and drain evaluation to determine the port cover plate welds impact of increased helium not met. leak rate on heat removal capability and offsite dose.
AND
D.2 Develop and initiate7 days corrective actions necessary to return the MPC to compliance with SR 3.1.1.3.
Certificate of Compliance No. 1014 3.1.1-2 Appendix A-100U Multi-Purpose Canister (MPC) 3.1.1
CONDITION REQUIRED ACTIONCOMPLETION TIME
E. Required Actions andE.1 Remove all fuel assemblies30 days associated Completion from the SFSC.
Times not met.
SURVEILLANCE REQUIREMENTS
SURVEILLANCE FREQUENCY
SR 3.1.1.1 Verify that the MPC cavity has been dried in Once, prior to accordance with the applicable limits in Table TRANSPORT 3-1, within the specified vacuum drying time limits OPERATIONS as applicable.
SR 3.1.1.2 Verify MPC helium backfill quantity is within the Once, prior to limit specified in Table 3-2 for the applicable MPC TRANSPORT model. Re-performance of this surveillance is not OPERATIONS required upon successful completion of Action C.2.2.
SR 3.1.1.3 Verify that the helium leak rate through the MPC Once, prior to vent and drain port confinement welds meets the TRANSPORT leaktight criteria of ANSI N14.5-1997. OPERATIONS
Certificate of Compliance No. 1014 3.1.1-3 Appendix A-100U SFSC Heat Removal System 3.1.2
3.1 SFSC INTEGRITY
3.1.2 SFSC Heat Removal System
LCO 3.1.2 The SFSC Heat Removal System shall be operable
NOTE--------------------------------------------------
The SFSC Heat Removal System is operable when 50% or more of the inlet and outlet vent areas are unblocked and available for flow or when air temperature requirements are met.
APPLICABILITY: During STORAGE OPERATIONS.
ACTIONS
NOTE--------------------------------------------------
Separate Condition entry allowed for each SFSC
CONDITION REQUIRED ACTIONCOMPLETION TIME
A. SFSC Heat RemovalA.1 Remove blockage. N/A System operable, but partially (<50%) blocked.
B. SFSC Heat RemovalB.1 Restore SFSC Heat8 hours System inoperable. Removal System to operable status.
Certificate of Compliance No. 1014 3.1.2-1 Appendix A-100U SFSC Heat Removal System 3.1.2
SURVEILLANCE REQUIREMENTS
CONDITION REQUIRED ACTIONCOMPLETION TIME
C. Required Action B.1 andC.1 Measure SFSC dose ratesImmediately and associated Completion in accordance with the once per 12 Time not met. Radiation Protection hours thereafter Program.
AND C.2.1 Restore SFSC Heat 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Removal System to operable status.
OR C.2.2 Transfer the MPC into a 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> TRANSFER CASK.
SURVEILLANCE FREQUENCY
SR 3.1.2 Verify all VVM inlets and outlets are free of 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> blockage from solid debris or floodwater.
For VVMs with installed temperature monitoring 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> equipment, verify that the difference between the average VVM air outlet temperature and ISFSI ambient temperature is 85 oF for VVMs containing PWR MPCs and 93oF for VVMs containing BWR MPCs.
Certificate of Compliance No. 1014 3.1.2-2 Appendix A-100U Fuel Cool-Down 3.1.3
3.1 SFSC INTEGRITY
3.1.3 MPC Cavity Reflooding
LCO 3.1.3 The MPC cavity pressure shall be < 100 psig
NOTE--------------------------------------------------------
The LCO is only applicable to wet UNLOADING OPERATIONS.
APPLICABILITY: UNLOADING OPERATIONS prior to and during re-flooding.
ACTIONS
NOTE--------------------------------------------------------
Separate Condition entry is allowed for each MPC.
CONDITION REQUIRED ACTIONCOMPLETION TIME B. MPC cavity pressure Immediately not within limit. A.1 Stop re-flooding operationsuntil MPC cavity pressure is within limit.
AND
A.2 Ensure MPC vent port is notImmediately closed or blocked.
SURVEILLANCE REQUIREMENTS
SURVEILLANCE FREQUENCY
SR 3.1.3.1 Ensure via analysis or direct measurement that Once, prior to MPC cavity pressure is within limit. MPC re-flooding operations.
AND
Once every 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> thereafter when using direct measurement.
Certificate of Compliance No. 1014 3.1.3-1 Appendix A-100U Impressed Current Cathodic Protection System (ICCPS) 3.1.5
3.1 SFSC INTEGRITY
3.1.4 Deleted
LCO 3.1.4 Deleted
Certificate of Compliance No. 1014 3.1.4-1 Appendix A 3.1 SFSC INTEGRITY
3.1.5 Impressed Current Cathodic Protection System (ICCPS)
LCO 3.1.5 The ICCPS shall be maintained operative
APPLICABILITY: During STORAGE OPERATIONS for any ISFSI that uses an ICCPS for corrosion mitigation.
NOTE--------------------------------------------------
Separate condition entry is allowed for each ICCPS at a particular ISFSI site.
ACTIONS
CONDITION REQUIRED ACTIONCOMPLETION TIME C. ICCPS inoperable afterA.1 Restore ICCPS to initial startup period. operable status 6 months OR A.2 Perform engineering 1 year evaluation to determine that the affected VVMs will maintain adequate integrity for at least 4 more years.
B. ICCPS 70% operableB.1 Perform engineering1 year status not met. evaluation to determine that the affected VVMs will maintain adequate integrity for at least 3 more years.
OR B.2 Perform repairs necessary3 years to re-establish integrity of the affected VVMs C. Required Actions andC.1 Transfer MPCs from3 years associated Completion affected VVMs to Times not met. unaffected VVMs or other approved overpacks.
Certificate of Compliance No. 1014 3.1.5-1 Appendix A-100U SURVEILLANCE REQUIREMENTS
SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify the ICCPS is operable 1 year after installation Once within 1 of the first VVM and remains operable after initial year startup. The ICCPS may be shutdown temporarily as necessary for power outages, repair or preventive AND maintenance and testing, or system modifications after which the system should be returned to operable status as soon as practicable. This Every 1 month surveillance requirement is suspended for one year thereafter after action A.2 has been met SR 3.1.5.2 Verify the ICCPS has been operable for at least Once within 10 70% of the time after initial startup. The verification years shall not be performed prior to 8 years from the time of initial startup. If the integrity of the VVM has AND previously been re-established per ACTION B.2, then the initial startup period may be reset. This surveillance is no longer applicable upon initiation of Every 5 years ACTION C.1. thereafter
Certificate of Compliance No. 1014 3.1.5-2 Appendix A-100U Not Used 3.2.1
3.2 SFSC RADIATION PROTECTION.
3.2.1 Not Used.
LCO 3.2.1 Not Used.
Certificate of Compliance No. 1014 3.2.1-1 Appendix A-100U TRANSFER CASK Surface Contamination 3.2.2
3.2 SFSC RADIATION PROTECTION.
3.2.2 TRANSFER CASK Surface Contamination.
LCO 3.2.2 Removable contamination on the exterior surfaces of the TRANSFER CASK and accessible portions of the MPC shall each not exceed:
- a. 1000 dpm/100 cm2 from beta and gamma sources
- b. 20 dpm/100 cm2 from alpha sources.
APPLICABILITY: During TRANSPORT OPERATIONS.
ACTIONS
NOTE--------------------------------------------------------
Separate Condition entry is allowed for each TRANSFER CASK.
CONDITION REQUIRED ACTIONCOMPLETION TIME
A. TRANSFER CASK orA.1 Restore removable surface7 days MPC removable surface contamination to within contamination limits not limits.
met.
SURVEILLANCE REQUIREMENTS
SURVEILLANCE FREQUENCY
SR 3.2.2.1 Verify that the removable contamination on the Once, prior to exterior surfaces of the TRANSFER CASK and TRANSPORT accessible portions of the MPC containing fuel is OPERATIONS within limits.
Certificate of Compliance No. 1014 Appendix A-100U 3.2.2-1 Not Used 3.2.3
3.2 SFSC RADIATION PROTECTION.
3.2.3 Not Used.
LCO 3.2.3 Not Used.
Certificate of Compliance No. 1014 3.2.3-1 Appendix A-100U Boron Concentration 3.3.1
3.3 SFSC CRITICALITY CONTROL
3.3.1 Boron Concentration LCO 3.3.1 As required by CoC Appendix B-100U, T able 2.1-2, the concentration of boron in the water in the MPC shall meet the following limits for the applicable MPC model and the most limiting fuel assembly array/class and classification to be stored in the MPC:
- a. MPC-24 with one or more fuel assemblies having an initial enrichment greater than the value in Table 2.1-2 for no soluble boron credit and < 5.0 wt% 235U: > 400 ppmb
- b. MPC-24E with one or more fuel assemblies having an initial enrichment greater than the value in Table 2.1-2 for no soluble boron credit and < 5.0 wt% 235U: > 300 ppmb
- c. Not Used.
- d. Not Used.
- e. Not Used.
- f. MPC-32: Minimum soluble boron concentration as required by the table below.
All INTACT FUEL ASSEMBLIES Array/Class Maximum Initial Maximum Initial Enrichment Enrichment 5.0
< 4.1 wt% 235U wt% 235U (ppmb) (ppmb) 14x14A/B/C/D/E 1,300 1,900 15x15A/B/C/G 1,800 2,500 15x15D/E/F/H 1,900 2,600 16x16A 1,400 2,000 17x17A/B/C 1,900 2,600
For maximum initial enrichments between 4.1 wt% and 5.0 wt% 235U, the minimum soluble boron concentration may be determined by linear interpolation between the minimum soluble boron concentrations at 4.1 wt% and 5.0 wt%.
Certificate of Compliance No. 1014 3.3.1-1 Appendix A-100U Boron Concentration
3.3.1 APPLICABILITY
During PWR fuel LOADING OPERATIONS with fuel and water in the MPC AND
During PWR fuel UNLOADING OPERATIONS with fuel and water in the MPC.
ACTIONS
NOTE----------------------------------------------------
Separate Condition entry is allowed for each MPC.
CONDITION REQUIRED ACTIONCOMPLETION TIME
A. Boron concentration notA.1 Suspend LOADINGImmediately within limit. OPERATIONS or UNLOADING OPERATIONS.
AND
A.2 Suspend positive reactivityImmediately additions.
AND
A.3 Initiate action to restoreImmediately boron concentration to within limit.
SURVEILLANCE REQUIREMENTS
SURVEILLANCE FREQUENCY
NOTE------------------------------------ Once, within 4 This surveillance is only required to be performed if the MPC is hours prior to submerged in water or if water is to be added to, or recirculated entering the through the MPC. Applicability of
this LCO.
SR 3.3.1.1 Verify boron concentration is within the AND applicable limit using two independent measurements. Once per 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> thereafter.
Certificate of Compliance No. 1014 3.3.1-2 Appendix A-100U MPC Helium Backfill Limits Table 3-2
Table 3-1 MPC Cavity Drying Limits for All MPC Types
Fuel Burnup Method of Moisture (MWD/MTU) MPC Heat Load Q (kW) Removal (Notes 1 and 2)
All Assemblies < 45,000 < 30 VDS or FHD All Assemblies < 45,000 > 30 FHD One or more assemblies > FHD 45,000 < 36.9 Notes:
- 1. VDS means a vacuum drying system. The acceptance criterion when using a VDS is the MPC cavity pressure shall be < 3 torr for > 30 minutes.
- 2. FHD means a forced helium dehydration system. The acceptance criterion when using an FHD System is the gas temperature exiting the demoisturizer shall be
< 21oF for > 30 minutes or the gas dew point exiting the MPC shall be < 22.9oF for > 30 minutes.
- 3. Vacuum drying of the MPC must be performed with the annular gap between the MPC and the HI-TRAC filled with water.
Certificate of Compliance No. 1014 3.4-1 Appendix A-100U MPC Helium Backfill Limits Table 3-2
Table 3-2 MPC Helium Backfill Limits1
MPC MODEL LIMIT MPC-24/24E
- i. Cask Heat Load < 27.77 kW (MPC-24) 0.1212 +/-10% g-moles/l or < 28.17 kW (MPC-24E) OR
> 29.3 psig and < 48.5 psig
ii. Cask Heat Load >27.77 kW (MPC-24) > 45.5 psig and < 48.5 psig or > 28.17 kW (MPC-24E)
MPC-32
- i. Cask Heat Load < 28.74 kW > 29.3 psig and < 48.5 psig
ii. Cask Heat Load >28.74 kW > 45.5 psig and < 48.5 psig
MPC-68
- i. Cask Heat Load < 28.19 kW 0.1218 +/-10% g-moles/l OR
> 29.3 psig and < 48.5 psig
ii. Cask Heat Load > 28.19 kW > 45.5 psig and < 48.5 psig
1 Helium used for backfill of MPC shall have a purity of > 99.995%. Pressure range is at a reference temperature of 70oF
Certificate of Compliance No. 1014 Appendix A-100U 3.4-2 4.0
4.0
This section is intentionally left blank
Certificate of Compliance No. 1014 4.0-1 Appendix A-100U Programs 5.0
5.0 ADMINISTRATIVE CONTROLS AND PROGRAMS
The following programs shall be established, implemented and maintained.
5.1 Not Used.
5.2 Not Used.
5.3 Not Used.
5.4 Radioactive Effluent Control Program This program implements the requirements of 10 CFR 72.44(d).
- a. The HI-STORM 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required.
Specification 3.1.1, Multi-Purpose Canister (MPC), provides assurance that there are not radioactive effluents from the SFSC.
- b. This program includes an environmental monitoring program. Each general license user may incorporate SFSC operations into their environmental monitoring programs for 10 CFR Part 50 operations.
- c. An annual report shall be submitted pursuant to 10 CFR 72.44(d)(3).
(continued)
Certificate of Compliance No. 1014 5.0-1 Appendix A-100U Programs 5.0
ADMINISTRATIVE CONTROLS AND PROGRAMS
5.5 Cask Transport Evaluation Program
This program provides a means for evaluating various transport configurations and transport route conditions to ensure that the design basis drop limits are met.
For lifting of the loaded TRANSFER CASK using devices which are integral to a structure governed by 10 CFR Part 50 regulations, 10 CFR 50 requirements apply. This program is not applicable when the TRANSFER CASK is in the FUEL BUILDING or is being handled by a device providing support from underneath (i.e., on a rail car, heavy haul trailer, air pads, etc...) or is being handled by a device designed in accordance with the increased safety factors of ANSI N14.6 and having redundant drop protection.
Pursuant to 10 CFR 72.212, this program shall evaluate the site-specific transport route conditions.
- a. For the TRANSFER CASK, the following requirements apply:
- 1. The lift height above the transport route surface(s) shall not exceed the limits in Table 5-1 except as provided for in Specification 5.5.a.2. Also, if applying the limits in Table 5-1, the program shall ensure that the transport route conditions (i.e., surface hardness and pad thickness) are equivalent to or less limiting than either Set A or Set B in HI-STORM FSAR Table 2.2.9.
- 2. The program may determine lift heights by analysis based on the site-specific conditions to ensure that the impact loading due to design basis drop events does not exceed 45 gs at the top of the MPC fuel basket. These alternative analyses shall be commensurate with the drop analyses described in the Final Safety Analysis Report for the HI-STORM 100 Cask System. The program shall ensure that these alternative analyses are documented and controlled.
(continued)
Certificate of Compliance No. 1014 Appendix A-100U 5.0-2 Programs 5.0
ADMINISTRATIVE CONTROLS AND PROGRAMS
5.5 Cask Transport Evaluation Program (continued)
- 3. The TRANSFER CASK, when loaded with spent fuel, may be lifted to any height necessary during TRANSPORT OPERATIONS provided the lifting device is designed in accordance with ANSI N14.6 and has redundant drop protection features.
- 4. The TRANSFER CASK and MPC, when loaded with spent fuel, may be lifted to those heights necessary to perform cask handling operations, including MPC TRANSFER, provided the lifts are made with structures and components operated, fabricated, tested, inspected, and maintained in accordance with the guidelines of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants,as applicable, and has devices that prevent uncontrolled lowering of the load.
Table 5-1
TRANSFER CASK Lifting Requirements
ITEM ORIENTATION LIFTING HEIGHT LIMIT (in.)
TRANSFER CASK Horizontal 42 (Notes 1 and 2)
TRANSFER CASK Vertical None Established (Note 2)
Notes: 1. To be measured from the lowest point on the TRANSFER CASK (i.e., the bottom edge of the cask/lid assemblage)
- 2. See Technical Specification 5.5.a.3 and 4
(continued)
Certificate of Compliance No. 1014 Appendix A-100U 5.0-3 Programs 5.0
ADMINISTRATIVE CONTROLS AND PROGRAMS
5.6 Not Used.
(continued)
Certificate of Compliance No. 1014 5.0-4 Appendix A-100U Programs 5.0
ADMINISTRATIVE CONTROLS AND PROGRAMS
5.7 Radiation Protection Program
5.7.1 Each cask user shall ensure that the Part 50 radiation protection program appropriately addresses dry storage cask loading and unloading, as well as ISFSI operations, including transport of the loaded TRANSFER CASK outside of facilities governed by 10 CFR Part 50. The radiation protection program shall include appropriate controls for direct radiation and contamination, ensuring compliance with applicable regulations, and implementing actions to maintain personnel occupational exposures As Low As Reasonably Achievable (ALARA). The actions and criteria to be included in the program are provided below.
5.7.2 As part of its evaluation pursuant to 10 CFR 72.212(b)(5)(iii), the licensee shall perform an analysis to confirm that the dose limits of 10 CFR 72.104(a) will be satisfied under the actual site conditions and ISFSI configuration, considering the planned number of casks to be deployed and the cask contents.
5.7.3 Based on the analysis performed pursuant to Section 5.7.2, the licensee shall establish individual cask surface dose rate limits for the HI-TRAC TRANSFER CASK and the HI-STORM VVM to be used at the site. Total (neutron plus gamma) dose rate limits shall be established at the following locations:
- a. The top of the TRANSFER CASK and the VVM.
- b. The side of the TRANSFER CASK
- c. The outlet vent on the VVM
5.7.4 Notwithstanding the limits established in Section 5.7.3, the measured dose rates on a loaded VVM shall not exceed 30 mrem/hr (gamma+neutron) on the top of the VVM.
5.7.5 The licensee shall measure the TRANSFER CASK and VVM surface neutron and gamma dose rates as described in Section 5.7.8 for comparison against the limits established in Section 5.7.3 or Section 5.7.4, whichever are lower.
(continued)
Certificate of Compliance No. 1014 5.0-5 Appendix A-100U Programs 5.0
ADMINISTRATIVE CONTROLS AND PROGRAMS
5.7 Radiation Protection Program (contd)
5.7.6 If the measured surface dose rates exceed the lower of the two limits established in Section 5.7.3 or Section 5.7.4, the licensee shall:
- a. Administratively verify that the correct contents were loaded in the correct fuel storage cell locations.
- b. Perform a written evaluation to verify whether a VVM at the ISFSI containing the as-loaded MPC will cause the dose limits of 10 CFR 72.104 to be exceeded.
- c. Perform a written evaluation within 30 days to determine why the surface dose rate limits were exceeded.
5.7.7 If the evaluation performed pursuant to Section 5.7.6 shows that the dose limits of 10 CFR 72.104 will be exceeded, the MPC shall not be placed into storage or the MPC shall be removed from storage until appropriate corrective action is taken to ensure the dose limits are not exceeded.
5.7.8 TRANSFER CASK and VVM surface dose rates shall be measured at approximately the following locations:
- a. A minimum of four (4) dose rate measurements shall be taken on the side of the TRANSFER CASK approximately at the cask mid-height plane. The measurement locations shall be approximately 90 degrees apart around the circumference of the cask. Dose rates shall be measured between the radial ribs of the water jacket.
- b. A minimum of four (4) TRANSFER CASK top lid dose rates shall be measured at locations approximately half way between the edge of the hole in the top lid and the outer edge of the top lid, 90 degrees apart around the circumference of the top lid.
- c. A minimum of four (4) dose rate measurements shall be taken on the top of the VVM. These measurements shall be taken approximately 90 degrees apart around the circumference of the lid, approximately 18 inches radially inward from the edge of the lid.
(continued)
Certificate of Compliance No. 1014 5.0-6 Appendix A-100U Programs 5.0
ADMINISTRATIVE CONTROLS AND PROGRAMS
5.7 Radiation Protection Program (contd)
- d. A minimum of four (4) dose rate measurements shall be taken adjacent to the outlet vent screen of the VVM, approximately 90 degrees apart.
5.7.9 The Radiation Protection Space (RPS) is a prismatic subgrade buffer zone surrounding a loaded VVM. The RPS boundary is located at a minimum of fourteen (14) feet from the centerline of a loaded VVM located on the periphery of an operating ISFSI, and at a minimum of twenty-one (21) feet from the centerline of a loaded VVM not lo cated on the periphery. The RPS boundary shall not be encroached upon during any site construction activity.
The jurisdictional boundary of the RPS extends from the top surface of the foundation pad to the top of the VVM interface pad and the top surface pad.
The ISFSI design shall ensure that there is no significant loss of shielding in the RPS due to a credible accident or an extreme environment event during construction involving excavation adjacent to the RPS boundary.
Certificate of Compliance No. 1014 5.0-7 Appendix A-100U Programs 5.0
ADMINISTRATIVE CONTROLS AND PROGRAMS
5.8 Aging Management Program (AMP)
Each general licensee shall have a program to establish, implement, and maintain written procedures for each applicable AMP described in the FSAR.
The program shall include provisions for changing AMP elements, as necessary, and within the limitations of the approved design bases to address new information on aging effects based on ins pection findings and/or indus try operating experience. Each procedure shall contain a reference to the specific aspect of the AMP element implemented by that procedure, and that reference shall be maintained ev en if the procedure is modified.
The general l icensee shall est ablish and implement these written pr ocedures prior to enteri ng the per iod of ext ended oper ation or no later than 365 day s after the effective date of t he renewal of the CoC, w hichever i s l ater. The general licensee shall maintain these written procedures for as l ong as the general licensee continues to operate H I-STORM 100 Cask S ystems i n service for longer than 20 ye ars.
Each general l icensee shall per form t ollgate assessments as desc ribed in Chapter 9 of the FSAR.
Certificate of Compliance No. 1014 5.0-8 Renewed Amendment No. 9 Revision 1 Appendix A-100U