Acceptance Review
Jump to navigation
Jump to search
The acceptance review is an early stage (see Property:Project stage) when the NRC takes the initial request and states that enough information exists to perform the full review.
List
Issue date | Site | Title | Project stage | Project | Estimated NRC review hours | |
---|---|---|---|---|---|---|
ML24306A142 | 1 November 2024 | Point Beach | NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Adopt Alternative Seismic Method for 50.69 Categorization of SSCs | Acceptance Review | EPID:L-2024-LLA-0140 | |
ML24304B056 | 30 October 2024 | Monticello | Acceptance of LAR to Revise TS to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements | Acceptance Review | EPID:L-2024-LLA-0135 | |
ML24304A892 | 30 October 2024 | Farley | Acceptance Review - Farley Units 1 and 2 - RG 1.183 Table 3 Footnote 11 Exception UFSAR Change LAR | Acceptance Review | EPID:L-2024-LLA-0136 | |
ML24296A063 | 22 October 2024 | Wolf Creek | NRR E-mail Capture - Acceptance Review Wolf Creek License Amendment and Exemption Requests for a risk-informed Resolution to GSI-191 | Acceptance Review | EPID:L-2024-LLA-0125 | |
ML24297A604 | 22 October 2024 | Farley | Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Admin Oversight | Acceptance Review | EPID:L-2024-LLA-0119 | |
ML24292A028 | 18 October 2024 | Comanche Peak | NRR E-mail Capture - Acceptance Review Comanche Peak Adoption of TSTF-51, TSTF-471, and TSTF-571 | Acceptance Review | EPID:L-2024-LLA-0123 | |
ML24292A031 | 18 October 2024 | 07109341 | Acceptance Letter for the Review of the Model No. Brr Package | Acceptance Review | EPID:L-2023-LLA-0090 | |
ML24291A107 | 16 October 2024 | Columbia | NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements - EPID L-2024-LLA-0132 | Acceptance Review | EPID:L-2024-LLA-0132 | |
ML24289A144 | 15 October 2024 | Grand Gulf River Bend | NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133) | Acceptance Review | EPID:L-2024-LLA-0133 | |
ML24284A197 | 10 October 2024 | Oyster Creek | Cover Letter Oyster Creek, License Termination Plan Acceptance Review | Acceptance Review | ||
ML24282A704 | 8 October 2024 | Byron Braidwood | NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations | Acceptance Review | ||
ML24274A237 | 7 October 2024 | Limerick | – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications | Acceptance Review | EPID:L-2024-LLA-0115 | |
ML24281A159 | 7 October 2024 | Saint Lucie | Acceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel Cycles | Acceptance Review | EPID:L-2024-LLA-0124 | |
ML24281A146 | 4 October 2024 | Kemmerer | Kemmerer Unit 1: Acceptance Review of Us Sfr Owner, Llc’S (Uso), Exemption Request Associated with Construction of the Natriumtm Energy Island | Acceptance Review | EPID:L-2024-LLE-0027 | |
ML24269A208 | 3 October 2024 | 07003103 | Federal Register Notice for Acceptance of Louisiana Energy Services LLC License Amendment Request Raise Enrichment Limit to Less than 10 Weight Percent for Leu+ Production Systems | Acceptance Review | ||
ML24276A113 | 2 October 2024 | Farley | Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Administrative Oversight | Acceptance Review | EPID:L-2024-LLA-0119 | |
ML24281A007 | 2 October 2024 | Sequoyah | NRR E-mail Capture - Acceptance Review Results for the Sequoyah License Amendment Request to Modify the FHA Analysis, Tech Spec TS 3.9.4 and Tech Spec 3.3.6 (L-2024-LLA-0117) | Acceptance Review | EPID:L-2024-LLA-0117 | |
ML24276A149 | 23 September 2024 | Holtec | Acceptance Review of Request for Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System | Acceptance Review | CAC:001028 EPID:L-2023-LLA-0148 | |
ML24263A083 | 19 September 2024 | Wolf Creek | NRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions | Acceptance Review | EPID:L-2024-LLA-0109 | |
ML24262A130 | 18 September 2024 | Comanche Peak | NRR E-mail Capture - Acceptance Review Comanche Peak Multiple Relief Requests for Unit 2 Third Inservice Inspection Interval Due to Impracticality (EPID L-2024-LLR-0053 Through -0058) | Acceptance Review | EPID:L-2024-LLR-0053 EPID:L-2024-LLR-0058 | |
ML24248A259 | 16 September 2024 | 07007029 | Acceptance Letter to Defense Threat Reduction Agency for a License Amendment Re Change of Radiation Safety Officer | Acceptance Review | EPID:L-2024-NFA-0003 | |
ML24254A208 | 10 September 2024 | Quad Cities | NRR E-mail Capture - Quad Cities, Unit Nos. 1 and 2 - Alternative to RV-08, Rev 1, SRV Testing Interval - Acceptance of Requested Licensing Action Re Relief Request Associated with Safety Relief Valve Testing Interval | Acceptance Review | EPID:L-2024-LLR-0060 | |
ML24247A136 | 9 September 2024 | 07105797 | Certificate of Compliance No. 5797 Rev. 24 Acceptance Letter | Acceptance Review | EPID:L-2023-LLA-0156 | |
ML24247A081 | 6 September 2024 | 07109403 | Application for the Model No. Volunteer Package - Acceptance Letter | Acceptance Review | EPID:L-2023-NEW-0007 | |
ML24250A050 | 6 September 2024 | Diablo Canyon | NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Acceptance Review | EPID:L-2024-LLA-0106 | |
ML24250A025 | 6 September 2024 | Wolf Creek | NRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology) | Acceptance Review | EPID:L-2024-LLA-0105 | |
ML24248A263 | 4 September 2024 | Palo Verde | Acceptance Review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Relief Request (RR) No. 71: Re?Submittal of RR?30 | Acceptance Review | ||
ML24248A242 | 4 September 2024 | Saint Lucie | Acceptance Review for St. Lucie, Unit 2 - Relief Request (RR) 14: Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval | Acceptance Review | EPID:L-2024-LLR-0052 | |
ML24248A082 | 3 September 2024 | Turkey Point | NRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059) | Acceptance Review | EPID:L-2024-LLR-0059 | |
ML24242A258 | 3 September 2024 | 07109382 | Amendment Request for Certificate of Compliance No. 9382 for the Model No. Tn Eagle - Acceptance for Review | Acceptance Review | EPID:L-2024-LLA-0028 | |
ML24240A209 | 27 August 2024 | Hope Creek | NRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc Replacement | Acceptance Review | EPID:L-2024-LLR-0049 | |
ML24220A021 | 22 August 2024 | University of Utah | University of Utah - Supplemental Information Needed for Acceptance of the Application for an Exemption Request Re Requalification and License Activities Exemption | Acceptance Review | EPID:L-2024-NLE-0003 | |
ML24234A297 | 21 August 2024 | Oconee | August 21, 2024 - Oconee Nuclear Station, Units 1, 2, and 3 - Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.7.7 | Acceptance Review | EPID:L-2024-LLA-0103 | |
ML24221A075 | 20 August 2024 | 07007033 | Acceptance of Global Laser Enrichment, LLC Exemption to Submit the Environmental Report in Advance of the Safety and Safeguards Analysis Report | Acceptance Review | EPID:L-2024-LLE-0023 | |
ML24233A247 | 20 August 2024 | Dresden | Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations | Acceptance Review | EPID:L-2024-LLE-0012 | |
ML24232A005 | 16 August 2024 | Vogtle | NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 | Acceptance Review | ||
ML24229A043 | 16 August 2024 | Salem | NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding | Acceptance Review | EPID:L-2024-LLE-0024 | |
ML24229A042 | 16 August 2024 | Salem | NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding | Acceptance Review | EPID:L-2024-LLA-0100 | |
ML24222A400 | 14 August 2024 | Technical Specifications Task Force | TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter | Acceptance Review | EPID:L-2024-PMP-0011 | |
ML24226A684 | 13 August 2024 | Point Beach | NRR E-mail Capture - Point Beach, Units 1 and 2 - Acceptance of License Amendment Request to Adopt TSTF-577 | Acceptance Review | EPID:L-2024-LLA-0104 | |
ML24225A006 | 9 August 2024 | Vogtle | NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) | Acceptance Review | EPID:L-2024-LLA-0101 | |
ML24221A008 | 7 August 2024 | Davis Besse | NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications | Acceptance Review | EPID:L-2024-LLA-0093 | |
ML24218A065 | 2 August 2024 | Arkansas Nuclear | NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 | Acceptance Review | EPID:L-2024-LLA-0092 | |
ML24212A223 | 30 July 2024 | Farley | Acceptance Review - License Amendment Request to Adopt TSTF-500, Rev 2 DC Electrical Rewrite (EPID L-2024-LLA-0091) - Email | Acceptance Review | EPID:L-2024-LLA-0091 | |
ML24207A182 | 25 July 2024 | Technical Specifications Task Force | TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter | Acceptance Review | EPID:L-2024-PMP-0007 | |
ML24207A086 | 24 July 2024 | Mcguire McGuire | Relief Request Acceptance Review Results - McGuire Units 1 and 2 Alternatives Component Cooling Pumps, RHR Pumps | Acceptance Review | ||
ML24215A315 | 24 July 2024 | Watts Bar | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources | Acceptance Review | EPID:L-2024-LLA-0086 | |
ML24205A062 | 23 July 2024 | Diablo Canyon | NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay | Acceptance Review | EPID:L-2024-LLR-0043 | |
ML24205A214 | 23 July 2024 | Farley | Acceptance Review - License Amendment Request to Change TS 3.6.5, Containment Air Temperature | Acceptance Review | EPID:L-2024-LLA-0098 | |
ML24199A214 | 17 July 2024 | Point Beach | NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Modify Containment Average Air Temperature Requirements | Acceptance Review | EPID:L-2024-LLA-0088 | |
[list] |