Acceptance Review

From kanterella
Jump to navigation Jump to search

The acceptance review is an early stage (see Property:Project stage) when the NRC takes the initial request and states that enough information exists to perform the full review.

List

 Issue dateSiteTitleProject stageProjectEstimated NRC review hours
ML26030A04330 January 2026Duane ArnoldAcceptance of License Amendment Request to Revise the Physical Security Plan to Support Resumption of Power Operations (EPID L-2025-LLA-0205)Acceptance Review
ML26030A14530 January 2026Diablo CanyonAcceptance Review: Diablo Canyon Request to Update Spent Fuel Pool and New Fuel Storage Vault Criticality Safety Analysis (EPID: L-2025-LLA-0201)Acceptance Review
ML26030A15928 January 2026MillstoneUnit 2 – Acceptance of Requested Licensing Action Re Adoption of TSTF-601 Shield Building Completion Time After Refueling (EPID L-2025-LLA-0202)Acceptance Review
ML26030A15628 January 2026MillstoneUnit 3 – Acceptance of Requested Licensing Action Re Adoption of TSTF-601 Shield Building Completion Time After Refueling (EPID L-2025-LLA-0204)Acceptance Review
ML26027A37127 January 2026Nine Mile PointNuclear Station, Unit 2 - Acceptance Review Determination GVRR-8 Alternative Related to Excess Flow Check Valve Test Frequency (EPID: L-2025-LLR-0097)Acceptance Review
ML26028A17827 January 2026CookNuclear Plant, Units 1 and 2 – Acceptance of Relief Requests in Support of the Sixth Inservice Testing Interval (EPID: L-2026-LLR-0000, L-2026-LLR-0001)Acceptance Review
ML26029A07827 January 2026Mcguire
Catawba
McGuire
Duke Fleet Acceptance of Requested Licensing Action: McGuire Catawba LAR for Rod Ejection Analysis Methodology to RG 1.236, June 2020Acceptance Review
ML26027A24426 January 2026Palo VerdeNuclear Generating Station Unit 1, Acceptance of Requested Licensing Action Relief Request 75 - Proposed Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval. (EPID L-2025-LLR-0087)Acceptance Review
ML26027A28126 January 2026Comanche PeakNuclear Power Plant (CPNPP) Acceptance of Requested Licensing Action to Revise Technical Specifications to Allow the Use of Optimized ZIRLO Fuel Rod Cladding MaterialAcceptance Review
ML26023A12223 January 2026PerryNuclear Power Plant, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-576, Revision 3 (EPID No. L-2026-LLA-0004)Acceptance Review
ML26026A15523 January 2026Dresden
Peach Bottom
Clinton
Quad Cities
LaSalle
Constellation Energy Generation, LLC - Fleet Request - Acceptance Review - Eliminate Automatic MSIV Closure on High Temperature (EPID L-2026-LLA-0001)Acceptance Review
ML26026A20623 January 2026Comanche PeakAcceptance Review of Vistras Application to Adopt TSTF-547, Clarification of Rod Position RequirementsAcceptance Review
ML25258A02522 January 202605200009Federal Register Notice - Acceptance of Entergy Operations, Inc. Renewal Application for Grand Gulf Site Early Site Permit (ESP-002)Acceptance Review
ML26023A01922 January 2026Saint LucieAcceptance Review for FPL LAR: St. Lucie Unit 1 Licensing Basis Changes for 24-Month Fuel Cycles (EPID L-2025-LLA-0188)Acceptance Review
ML25258A02421 January 202605200009Acceptance of Entergy Operations, Inc. Renewal Application for Grand Gulf Site Early Site Permit (ESP-002)Acceptance Review
ML26020A26421 January 202607007011Acceptance of U.S. Department of Energy Spent Nuclear Fuel Route Application U.S. Nuclear Regulatory Commission Route No. 192BAcceptance Review
ML26022A11421 January 2026Diablo CanyonAcceptance Review: Diablo Canyon Request to Utilize Adopt Fuel for Improved Fuel Performance (EPID: L-2025-LLA-0191)Acceptance Review
ML26013A02815 January 2026Hatch
Vogtle
Farley
SNC Fleet - Extension to Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request for Changes to Emergency Action Level Schemes to Adopt NEI 99-01, Revision 7 (EPID L-2025-LLA-0157)Acceptance Review
ML26015A10714 January 2026VogtleUnits 3 and 4 - Acceptance Review - Vogtle 3 and 4 - LAR to Revise Technical Specification 3.4.10, Reactor Coolant System (RCS) Specific Activity (EPID L-2025-LLA-0198)Acceptance Review
ML26014A18813 January 2026Watts BarAcceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - LAR to Revise TS 3.7.3 (EPID L-2025-LLA-0193)Acceptance Review
ML26013A08612 January 2026Wolf CreekWolf Creek Generating Station - Acceptance Review: Wolf Creek 10 CFR 50.55a Request to Use a Provision of a Later Edition of ASME OM Code for Motor Operated Valve Testing (EPID: L-2025-LLR-0093)Acceptance Review
ML26009A1299 January 2026VogtleFyi - Acceptance Review - Vogtle 3 and 4 - LAR to Change TS 3.3.9 and TS 3.3.1 9 (Epdi L-2025-LLA-0197)Acceptance Review
ML26008A2868 January 202607200020Acceptance of Department of Energy, Idaho Cleanup Project License Amendment Request to Update the Licensee Designation of Authority Title for the Three Mile Island Unit 2 Independent Spent Fuel Storage InstallationAcceptance Review
ML26008A0427 January 2026Byron
Braidwood
Constellation Energy Generation, LLC - Braidwood and Byron Request - Acceptance of License Amendment Request to Revise the Quadrant Power Tilt Ratio Technical Specification (EPID L-2025-LLA-0194)Acceptance Review
ML26005A2155 January 2026SusquehannaSusquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Revise TS to Adopt TSTF-599 (EPID L-2025-LLA-0186)Acceptance Review
ML25356A36522 December 2025HatchNRR E-mail Capture - Fyi - Acceptance Review - Hatch 1 and 2 - LAR to Adopt TSTF-576 Revise Safety/Relief Valve Requirements (L-2025-LLA-0190)Acceptance Review
ML25356A52819 December 2025Millstone
Surry
North Anna
Acceptance Review for Fleet Report DOM-NAF-4 and VC Summer LAR to Implement Report (L-2025-LLT-0000 & L-2025-LLA-0178)Acceptance Review
ML25352A26018 December 2025Calvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
Acceptance Review: Exemption Request- NDT Excess Earnings for Non-Radiological Decommissioning (10 CFR 50.82(a)(8)) (EPID L-2025-LLE-0028)Acceptance Review
ML25329A30016 December 2025Hi STAR 330 Acceptance Review Audit Meeting SummaryAcceptance Review
ML25350C08516 December 2025BraidwoodConstellation Energy Generation, LLC - Braidwood - Acceptance of License Amendment Request to Extend Completion Date of License Renewal Commitment (EPID L-2025-LLA-0170)Acceptance Review
ML25351A15116 December 2025Saint LucieAcceptance Review for FPL LAR - St. Lucie Unit 1 - Fuel Methodology Changes in Support of Transition to 24-Month Fuel Cycles (L-2024-LLA-0152)Acceptance Review
ML25353A57015 December 2025LimerickNRC Acceptance Review for Limerick LLRT LAR (L-2025-LLA-0167) and Updated Schedule for ILRT LAR (L-2025-LLA-0126)Acceptance Review
ML25352A17415 December 2025Duane ArnoldDAEC - Acceptance Review Regarding Operating Licensing and Technical Specification LAR to Support Resumption of Power Operations (EPID L-2025-LLA-0180)Acceptance Review
ML25352A12715 December 2025SalemNRC Acceptance Review Results for Salem LAR S25-01 (EPID L-2025-LLA-0154)Acceptance Review
ML25350C09115 December 2025LimerickNRC Acceptance Review of Limerick Proposed Alternative GVRR-12 (EPID L-2025-LLR-0090)Acceptance Review
ML25350B05315 December 2025SalemNuclear Generating Station, Units 1 and 2 - NRC Acceptance Review Results for Salem LAR S22-06 (L-2025-LLA-0169)Acceptance Review
ML25350A10815 December 2025SalemNRC Revised Acceptance Review Schedule for Salem LAR S25-02 (EPID L-2025-LLA-0112)Acceptance Review
ML25346A09912 December 2025Davis BesseNuclear Power Station, Unit 1 - Acceptance Review for Davis-Besse Use of Neutron Instrumentation AmendmentAcceptance Review
ML25345A3919 December 2025CraneCrane Clean Energy Center - Acceptance of License Amendment Request to Revise the Emergency Plan to Support Resumption of Power Operations (EPID L-2025-LLA-0162)Acceptance Review
ML25343A1949 December 2025CatawbaCatawba, Units 1 and 2 - Acceptance of Two Requested Licensing Actions Amendments to Adopt TSTF-505/TSTF-591 and 50.69 (Epids L-2025-LLA-0155 and L-2025-LLA-0156)Acceptance Review
ML25342A0439 December 2025Vallecitos Nuclear Center
07000754
Vallecitos
Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance LetterAcceptance Review
ML25344A0238 December 2025OconeeUnits 1, 2 and 3 - Acceptance of Requested Licensing Action Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits (EPID L-2025-LLA-0164)Acceptance Review
ML25342A2978 December 2025University of Missouri-ColumbiaNRR E-mail Capture - University of Missouri - Columbia Research Reactor (MURR) License Amendment Request Acceptance ReviewAcceptance Review
ML25339A0135 December 2025SummerNuclear Station, Unit No. 1 - Acceptance Review for VC Summer SG Water Level License Amendment Request (EPID L-2025-LLA-0168)Acceptance Review
ML25342A0195 December 2025Byron
Braidwood
Constellation Energy Generation, LLC - Braidwood and Byron Request - Acceptance of License Amendment Request to Revise Limiting Conditions Supporting Transitioning to Framatome Gaia Fuel (EPID No. L-2025-LLA-0172)Acceptance Review
ML25338A2094 December 2025FarleyNuclear Plant, Units 1 and 2 - Acceptance Review for Diesel Generator Frequency & Voltage LAR (EPID L-2025-LLA-0153)Acceptance Review
ML25338A2552 December 2025Mcguire
McGuire
Updated Acceptance Review Hours and Schedule Ref: McGuire Relief Request Acceptance Review Results; McGuire Unit 2 ISI Class 1 and 2 Components ImpracticalityAcceptance Review
ML25337A0142 December 2025ColumbiaAcceptance Review - Columbia Proposed Change to Technical Specification to Correct Error Introduced During Wordperfect Conversion (EPID L-2025-LLA-0171)Acceptance Review
ML25337A1132 December 2025CraneChristopher M. Crane Clean Energy Center - Acceptance of License Amendment Request to Revise the Security Plan to Support Resumption of Power OperationsAcceptance Review
ML25329A08325 November 202505000128NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change Technical Specifications Section 6.2 and 6.2.1 Acceptance ReviewAcceptance Review
[list]