Acceptance Review
Jump to navigation
Jump to search
The acceptance review is an early stage (see Property:Project stage) when the NRC takes the initial request and states that enough information exists to perform the full review.
List
| Issue date | Site | Title | Project stage | Project | Estimated NRC review hours | |
|---|---|---|---|---|---|---|
| ML25350B591 | 17 December 2025 | Westinghouse | U.S. NRC Acceptance Letter for Westinghouse Topical Report WCAP-16996-P/NP, Revision 1, Supplement 2, Revision 0, Extension of Full Spectrum LOCA (Fsloca) Evaluation Methodology to Combustion Engineering (CE) Pressurized Water Reactors (Pwr | Acceptance Review | EPID:L-2025-TOP-0035 | |
| ML25342A043 | 9 December 2025 | Vallecitos Nuclear Center 07000754 Vallecitos | Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Letter | Acceptance Review | EPID:L-2024-LLE-0029 | |
| ML25343A194 | 9 December 2025 | Catawba | Acceptance of Two Requested Licensing Actions Amendments to Adopt TSTF-505/TSTF-591 and 50.69 (Epids L-2025-LLA-0155 and L-2025-LLA-0156) | Acceptance Review | EPID:L-2025-LLA-0155 | |
| ML25345A391 | 9 December 2025 | Crane | Crane Clean Energy Center - Acceptance of License Amendment Request to Revise the Emergency Plan to Support Resumption of Power Operations | Acceptance Review | EPID:L-2025-LLA-0162 | |
| ML25342A014 | 8 December 2025 | Westinghouse | U.S. NRC Acceptance Letter for Westinghouse Electric Company Topical Report WCAP-18965-P/NP, Revision 0, Qualification of PHOENIX5 and POLCA8 for the Nuclear Design of Boiling Water Reactors | Acceptance Review | EPID:L-2025-TOP-0032 | |
| ML25342A297 | 8 December 2025 | University of Missouri-Columbia | NRR E-mail Capture - University of Missouri - Columbia Research Reactor (MURR) License Amendment Request Acceptance Review | Acceptance Review | EPID:L-2025-NFA-0012 | |
| ML25344A023 | 8 December 2025 | Oconee | Acceptance of Requested Licensing Action Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits | Acceptance Review | EPID:L-2025-LLA-0164 | |
| ML25342A019 | 5 December 2025 | Byron Braidwood | Constellation Energy Generation, LLC - Braidwood and Byron Request - Acceptance of License Amendment Request to Revise Limiting Conditions Supporting Transitioning to Framatome Gaia Fuel | Acceptance Review | EPID:L-2025-LLA-0172 | |
| ML25339A032 | 5 December 2025 | Mcguire Catawba Brunswick Robinson McGuire | Duke Fleet - Acceptance of Requested Licensing Action Amendment to Use Online Monitoring Methodology | Acceptance Review | EPID:L-2025-LLA-0165 | |
| ML25339A013 | 5 December 2025 | Summer | Acceptance Review for VC Summer SG Water Level License Amendment Request | Acceptance Review | EPID:L-2025-LLA-0168 | |
| ML25338A209 | 4 December 2025 | Farley | Acceptance Review for Diesel Generator Frequency & Voltage LAR | Acceptance Review | EPID:L-2025-LLA-0153 | |
| ML25337A014 | 2 December 2025 | Columbia | Acceptance Review - Columbia Proposed Change to Technical Specification to Correct Error Introduced During Wordperfect Conversion | Acceptance Review | EPID:L-2025-LLA-0171 | |
| ML25337A113 | 2 December 2025 | Crane | Christopher M. Crane Clean Energy Center - Acceptance of License Amendment Request to Revise the Security Plan to Support Resumption of Power Operations | Acceptance Review | EPID:L-2025-LLA-0161 | |
| ML25338A255 | 2 December 2025 | Mcguire McGuire | Updated Acceptance Review Hours and Schedule Ref: McGuire Relief Request Acceptance Review Results; McGuire Unit 2 ISI Class 1 and 2 Components Impracticality | Acceptance Review | ||
| ML25336A003 | 1 December 2025 | Braidwood | Constellation Energy Generation, LLC - Braidwood - Revised Acceptance of Amendment to Incorporate Diurnal Curve | Acceptance Review | EPID:L-2024-LLA-0172 | |
| ML25329A083 | 25 November 2025 | 05000128 | NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change Technical Specifications Section 6.2 and 6.2.1 Acceptance Review | Acceptance Review | ||
| ML25329A080 | 25 November 2025 | Texas A&M University | NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change to Technical Specification 3.5 Acceptance Review | Acceptance Review | ||
| ML25329A082 | 25 November 2025 | Texas A&M University | NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change to Technical Specification 6.4.3 Acceptance Review | Acceptance Review | ||
| ML25329A084 | 25 November 2025 | 05000128 | NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change to License Conditions for Transfer of Byproduct Material Acceptance Review | Acceptance Review | ||
| ML25330A195 | 25 November 2025 | Calvert Cliffs Dresden Peach Bottom Nine Mile Point Byron Braidwood Limerick Ginna Clinton Quad Cities FitzPatrick LaSalle | Constellation Energy Generation, LLC - Fleet Request - Revised Acceptance of Proposed Alternative for Reactor Vessel Close Stud Examinations | Acceptance Review | EPID:L-2025-LLR-0060 | |
| ML25328A135 | 24 November 2025 | Farley | NRR E-mail Capture - Acceptance Review for Farley Nuclear Plant, Units 1 & 2 TS 3.3.1 and 3.3.2 Allowable Value LAR (L-2025-LLA-0145) | Acceptance Review | EPID:L-2025-LLA-0145 | |
| ML25330A194 | 24 November 2025 | Calvert Cliffs Dresden Peach Bottom Nine Mile Point Byron Braidwood Limerick Ginna Clinton Quad Cities FitzPatrick LaSalle | Constellation Energy Generation, LLC - Fleet Request - Acceptance Review - Later Edition Quality Assurance Program | Acceptance Review | EPID:L-2025-LLR-0088 | |
| ML25325A088 | 21 November 2025 | Fort Calhoun | – Supplemental Information Needed for Acceptance of Requested Licensing Action Final Status Survey Report for Phase 2 of the Final Status Survey Plan - L-2025-LLN-0012 | Acceptance Review | EPID:L-2025-LLN-0012 | |
| ML25325A102 | 21 November 2025 | Big Rock Point | Acceptance of Requested Licensing Action Application for Order Consenting to Direct Transfer of Big Rock Point Site - L-2025-LLM-0002 | Acceptance Review | EPID:L-2025-LLM-0002 | |
| ML25339A116 | 18 November 2025 | Oconee Robinson McGuire | Change in Issuance Date - Acceptance Review for the Exemption Request from 10 CFR 50.55a(a)(3)(ii) for Code CaseN-921 | Acceptance Review | ||
| ML25321A001 | 17 November 2025 | FitzPatrick | Acceptance Review Determination LAR to Revise the Allowable Value for RWCU System Primary Containment Isolation | Acceptance Review | EPID:L-2025-LLA-0149 | |
| ML25308A001 | 4 November 2025 | 05200051 05200052 05200053 05200054 | DHS Consultation Acceptance of Fermi America Operating License Application | Acceptance Review | ||
| ML25155B827 | 30 September 2025 | Acceptance for Use of NEI 08-09, Revision 7, Cyber Security Plan for Nuclear Power Reactors | Acceptance Review | |||
| ML25317A621 | 30 September 2025 | Calvert Cliffs | – Acceptance of Requested Licensing Action Proposed Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals | Acceptance Review | EPID:L-2025-LLR-0083 | |
| ML25322A175 | 30 September 2025 | Waterford | Acceptance Review of License Amendment Request to Revise Waterford, Unit 3, Technical Specification Section 5.0, Design Features | Acceptance Review | EPID:L-2025-LLA-0146 | |
| ML25273A286 | 30 September 2025 | 99902069 | Kairos Power Pre-App Doc - Acceptance Review of Kairos Power LLC 10 CFR Part 55 Exemption Requests for NON-POWER Kairos Power Fluoride SALT-COOLED, High Temperature Reactors | Acceptance Review | EPID:L-2025-LLE-0021 | |
| ML25269A071 | 29 September 2025 | Diablo Canyon | Acceptance of Requested Licensing Action Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 7, Development of Emergency Action Levels for Non-Passive Reactors | Acceptance Review | EPID:L-2025-LLA-0139 | |
| ML25272A179 | 29 September 2025 | Palo Verde | Acceptance of Requested Licensing Action Relief Request 74 - Proposed Alternative for Steam Generator and Pressurizer Pressure Retaining Welds for PVNGS Units 1, 2, and 3 | Acceptance Review | EPID:L-2025-LLR-0084 | |
| ML25269A154 | 26 September 2025 | Hatch | NRR E-mail Capture - Acceptance Review - Hatch Alternative Request RR-P-10 Adopt Code Case OMN-32 | Acceptance Review | EPID:L-2025-LLR-0082 | |
| ML25261A144 | 26 September 2025 | Westinghouse | Acceptance for Technical Review: Westinghouse Electric Company License Amendment Request Regarding Fundamental Nuclear Material Control Plan for the Columbia Fuel Fabrication Facility | Acceptance Review | EPID:L-2025-MCA-0000 | |
| ML25269A153 | 26 September 2025 | Hatch | NRR E-mail Capture - Acceptance Review - Hatch Alternative Request to ISTC-3700 _ RR-V-5 | Acceptance Review | EPID:L-2025-LLR-0081 | |
| ML25273A177 | 26 September 2025 | Browns Ferry | Acceptance Review Results Regarding Request to Revise ISP Schedule for Browns Ferry Nuclear Plant, Unit 2 | Acceptance Review | EPID:L-2025-LLL-0014 | |
| ML25269A073 | 26 September 2025 | Prairie Island | Email - Prairie Island 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specifications to Adopt TSTF-554 | Acceptance Review | EPID:L-2025-LLA-0142 | |
| ML25272A128 | 25 September 2025 | Acceptance for Review of Uusa License Amendment Request to Exempt Requirement for a Criticality Accident Alarm System (LAR 25-03) | Acceptance Review | |||
| [list] | ||||||