Acceptance Review

From kanterella
Jump to navigation Jump to search

The acceptance review is an early stage (see Property:Project stage) when the NRC takes the initial request and states that enough information exists to perform the full review.

List

 Issue dateSiteTitleProject stageProjectEstimated NRC review hours
ML25350B59117 December 2025WestinghouseU.S. NRC Acceptance Letter for Westinghouse Topical Report WCAP-16996-P/NP, Revision 1, Supplement 2, Revision 0, Extension of Full Spectrum LOCA (Fsloca) Evaluation Methodology to Combustion Engineering (CE) Pressurized Water Reactors (PwrAcceptance ReviewEPID:L-2025-TOP-0035
ML25342A0439 December 2025Vallecitos Nuclear Center
07000754
Vallecitos
Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance LetterAcceptance ReviewEPID:L-2024-LLE-0029
ML25343A1949 December 2025CatawbaAcceptance of Two Requested Licensing Actions Amendments to Adopt TSTF-505/TSTF-591 and 50.69 (Epids L-2025-LLA-0155 and L-2025-LLA-0156)Acceptance ReviewEPID:L-2025-LLA-0155
ML25345A3919 December 2025CraneCrane Clean Energy Center - Acceptance of License Amendment Request to Revise the Emergency Plan to Support Resumption of Power OperationsAcceptance ReviewEPID:L-2025-LLA-0162
ML25342A0148 December 2025WestinghouseU.S. NRC Acceptance Letter for Westinghouse Electric Company Topical Report WCAP-18965-P/NP, Revision 0, Qualification of PHOENIX5 and POLCA8 for the Nuclear Design of Boiling Water ReactorsAcceptance ReviewEPID:L-2025-TOP-0032
ML25342A2978 December 2025University of Missouri-ColumbiaNRR E-mail Capture - University of Missouri - Columbia Research Reactor (MURR) License Amendment Request Acceptance ReviewAcceptance ReviewEPID:L-2025-NFA-0012
ML25344A0238 December 2025OconeeAcceptance of Requested Licensing Action Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) LimitsAcceptance ReviewEPID:L-2025-LLA-0164
ML25342A0195 December 2025Byron
Braidwood
Constellation Energy Generation, LLC - Braidwood and Byron Request - Acceptance of License Amendment Request to Revise Limiting Conditions Supporting Transitioning to Framatome Gaia FuelAcceptance ReviewEPID:L-2025-LLA-0172
ML25339A0325 December 2025Mcguire
Catawba
Brunswick
Robinson
McGuire
Duke Fleet - Acceptance of Requested Licensing Action Amendment to Use Online Monitoring MethodologyAcceptance ReviewEPID:L-2025-LLA-0165
ML25339A0135 December 2025SummerAcceptance Review for VC Summer SG Water Level License Amendment RequestAcceptance ReviewEPID:L-2025-LLA-0168
ML25338A2094 December 2025FarleyAcceptance Review for Diesel Generator Frequency & Voltage LARAcceptance ReviewEPID:L-2025-LLA-0153
ML25337A0142 December 2025ColumbiaAcceptance Review - Columbia Proposed Change to Technical Specification to Correct Error Introduced During Wordperfect ConversionAcceptance ReviewEPID:L-2025-LLA-0171
ML25337A1132 December 2025CraneChristopher M. Crane Clean Energy Center - Acceptance of License Amendment Request to Revise the Security Plan to Support Resumption of Power OperationsAcceptance ReviewEPID:L-2025-LLA-0161
ML25338A2552 December 2025Mcguire
McGuire
Updated Acceptance Review Hours and Schedule Ref: McGuire Relief Request Acceptance Review Results; McGuire Unit 2 ISI Class 1 and 2 Components ImpracticalityAcceptance Review
ML25336A0031 December 2025BraidwoodConstellation Energy Generation, LLC - Braidwood - Revised Acceptance of Amendment to Incorporate Diurnal CurveAcceptance ReviewEPID:L-2024-LLA-0172
ML25329A08325 November 202505000128NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change Technical Specifications Section 6.2 and 6.2.1 Acceptance ReviewAcceptance Review
ML25329A08025 November 2025Texas A&M UniversityNRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change to Technical Specification 3.5 Acceptance ReviewAcceptance Review
ML25329A08225 November 2025Texas A&M UniversityNRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change to Technical Specification 6.4.3 Acceptance ReviewAcceptance Review
ML25329A08425 November 202505000128NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change to License Conditions for Transfer of Byproduct Material Acceptance ReviewAcceptance Review
ML25330A19525 November 2025Calvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
Constellation Energy Generation, LLC - Fleet Request - Revised Acceptance of Proposed Alternative for Reactor Vessel Close Stud ExaminationsAcceptance ReviewEPID:L-2025-LLR-0060
ML25328A13524 November 2025FarleyNRR E-mail Capture - Acceptance Review for Farley Nuclear Plant, Units 1 & 2 TS 3.3.1 and 3.3.2 Allowable Value LAR (L-2025-LLA-0145)Acceptance ReviewEPID:L-2025-LLA-0145
ML25330A19424 November 2025Calvert Cliffs
Dresden
Peach Bottom
Nine Mile Point
Byron
Braidwood
Limerick
Ginna
Clinton
Quad Cities
FitzPatrick
LaSalle
Constellation Energy Generation, LLC - Fleet Request - Acceptance Review - Later Edition Quality Assurance ProgramAcceptance ReviewEPID:L-2025-LLR-0088
ML25325A08821 November 2025Fort Calhoun– Supplemental Information Needed for Acceptance of Requested Licensing Action Final Status Survey Report for Phase 2 of the Final Status Survey Plan - L-2025-LLN-0012Acceptance ReviewEPID:L-2025-LLN-0012
ML25325A10221 November 2025Big Rock PointAcceptance of Requested Licensing Action Application for Order Consenting to Direct Transfer of Big Rock Point Site - L-2025-LLM-0002Acceptance ReviewEPID:L-2025-LLM-0002
ML25339A11618 November 2025Oconee
Robinson
McGuire
Change in Issuance Date - Acceptance Review for the Exemption Request from 10 CFR 50.55a(a)(3)(ii) for Code CaseN-921Acceptance Review
ML25321A00117 November 2025FitzPatrickAcceptance Review Determination LAR to Revise the Allowable Value for RWCU System Primary Containment IsolationAcceptance ReviewEPID:L-2025-LLA-0149
ML25308A0014 November 202505200051
05200052
05200053
05200054
DHS Consultation Acceptance of Fermi America Operating License ApplicationAcceptance Review
ML25155B82730 September 2025Acceptance for Use of NEI 08-09, Revision 7, Cyber Security Plan for Nuclear Power ReactorsAcceptance Review
ML25317A62130 September 2025Calvert Cliffs– Acceptance of Requested Licensing Action Proposed Alternative for Implementation of Extended Reactor Vessel Inservice Inspection IntervalsAcceptance ReviewEPID:L-2025-LLR-0083
ML25322A17530 September 2025WaterfordAcceptance Review of License Amendment Request to Revise Waterford, Unit 3, Technical Specification Section 5.0, Design FeaturesAcceptance ReviewEPID:L-2025-LLA-0146
ML25273A28630 September 202599902069Kairos Power Pre-App Doc - Acceptance Review of Kairos Power LLC 10 CFR Part 55 Exemption Requests for NON-POWER Kairos Power Fluoride SALT-COOLED, High Temperature ReactorsAcceptance ReviewEPID:L-2025-LLE-0021
ML25269A07129 September 2025Diablo CanyonAcceptance of Requested Licensing Action Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 7, Development of Emergency Action Levels for Non-Passive ReactorsAcceptance ReviewEPID:L-2025-LLA-0139
ML25272A17929 September 2025Palo VerdeAcceptance of Requested Licensing Action Relief Request 74 - Proposed Alternative for Steam Generator and Pressurizer Pressure Retaining Welds for PVNGS Units 1, 2, and 3Acceptance ReviewEPID:L-2025-LLR-0084
ML25269A15426 September 2025HatchNRR E-mail Capture - Acceptance Review - Hatch Alternative Request RR-P-10 Adopt Code Case OMN-32Acceptance ReviewEPID:L-2025-LLR-0082
ML25261A14426 September 2025WestinghouseAcceptance for Technical Review: Westinghouse Electric Company License Amendment Request Regarding Fundamental Nuclear Material Control Plan for the Columbia Fuel Fabrication FacilityAcceptance ReviewEPID:L-2025-MCA-0000
ML25269A15326 September 2025HatchNRR E-mail Capture - Acceptance Review - Hatch Alternative Request to ISTC-3700 _ RR-V-5Acceptance ReviewEPID:L-2025-LLR-0081
ML25273A17726 September 2025Browns FerryAcceptance Review Results Regarding Request to Revise ISP Schedule for Browns Ferry Nuclear Plant, Unit 2Acceptance ReviewEPID:L-2025-LLL-0014
ML25269A07326 September 2025Prairie IslandEmail - Prairie Island 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specifications to Adopt TSTF-554Acceptance ReviewEPID:L-2025-LLA-0142
ML25272A12825 September 2025Acceptance for Review of Uusa License Amendment Request to Exempt Requirement for a Criticality Accident Alarm System (LAR 25-03)Acceptance Review
[list]