Acceptance Review
Jump to navigation
Jump to search
The acceptance review is an early stage (see Property:Project stage) when the NRC takes the initial request and states that enough information exists to perform the full review.
List
| Issue date | Site | Title | Project stage | Project | Estimated NRC review hours | |
|---|---|---|---|---|---|---|
| ML26030A043 | 30 January 2026 | Duane Arnold | Acceptance of License Amendment Request to Revise the Physical Security Plan to Support Resumption of Power Operations (EPID L-2025-LLA-0205) | Acceptance Review | ||
| ML26030A145 | 30 January 2026 | Diablo Canyon | Acceptance Review: Diablo Canyon Request to Update Spent Fuel Pool and New Fuel Storage Vault Criticality Safety Analysis (EPID: L-2025-LLA-0201) | Acceptance Review | ||
| ML26030A159 | 28 January 2026 | Millstone | Unit 2 – Acceptance of Requested Licensing Action Re Adoption of TSTF-601 Shield Building Completion Time After Refueling (EPID L-2025-LLA-0202) | Acceptance Review | ||
| ML26030A156 | 28 January 2026 | Millstone | Unit 3 – Acceptance of Requested Licensing Action Re Adoption of TSTF-601 Shield Building Completion Time After Refueling (EPID L-2025-LLA-0204) | Acceptance Review | ||
| ML26027A371 | 27 January 2026 | Nine Mile Point | Nuclear Station, Unit 2 - Acceptance Review Determination GVRR-8 Alternative Related to Excess Flow Check Valve Test Frequency (EPID: L-2025-LLR-0097) | Acceptance Review | ||
| ML26028A178 | 27 January 2026 | Cook | Nuclear Plant, Units 1 and 2 – Acceptance of Relief Requests in Support of the Sixth Inservice Testing Interval (EPID: L-2026-LLR-0000, L-2026-LLR-0001) | Acceptance Review | ||
| ML26029A078 | 27 January 2026 | Mcguire Catawba McGuire | Duke Fleet Acceptance of Requested Licensing Action: McGuire Catawba LAR for Rod Ejection Analysis Methodology to RG 1.236, June 2020 | Acceptance Review | ||
| ML26027A244 | 26 January 2026 | Palo Verde | Nuclear Generating Station Unit 1, Acceptance of Requested Licensing Action Relief Request 75 - Proposed Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval. (EPID L-2025-LLR-0087) | Acceptance Review | ||
| ML26027A281 | 26 January 2026 | Comanche Peak | Nuclear Power Plant (CPNPP) Acceptance of Requested Licensing Action to Revise Technical Specifications to Allow the Use of Optimized ZIRLO Fuel Rod Cladding Material | Acceptance Review | ||
| ML26023A122 | 23 January 2026 | Perry | Nuclear Power Plant, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-576, Revision 3 (EPID No. L-2026-LLA-0004) | Acceptance Review | ||
| ML26026A155 | 23 January 2026 | Dresden Peach Bottom Clinton Quad Cities LaSalle | Constellation Energy Generation, LLC - Fleet Request - Acceptance Review - Eliminate Automatic MSIV Closure on High Temperature (EPID L-2026-LLA-0001) | Acceptance Review | ||
| ML26026A206 | 23 January 2026 | Comanche Peak | Acceptance Review of Vistras Application to Adopt TSTF-547, Clarification of Rod Position Requirements | Acceptance Review | ||
| ML25258A025 | 22 January 2026 | 05200009 | Federal Register Notice - Acceptance of Entergy Operations, Inc. Renewal Application for Grand Gulf Site Early Site Permit (ESP-002) | Acceptance Review | ||
| ML26023A019 | 22 January 2026 | Saint Lucie | Acceptance Review for FPL LAR: St. Lucie Unit 1 Licensing Basis Changes for 24-Month Fuel Cycles (EPID L-2025-LLA-0188) | Acceptance Review | ||
| ML25258A024 | 21 January 2026 | 05200009 | Acceptance of Entergy Operations, Inc. Renewal Application for Grand Gulf Site Early Site Permit (ESP-002) | Acceptance Review | ||
| ML26020A264 | 21 January 2026 | 07007011 | Acceptance of U.S. Department of Energy Spent Nuclear Fuel Route Application U.S. Nuclear Regulatory Commission Route No. 192B | Acceptance Review | ||
| ML26022A114 | 21 January 2026 | Diablo Canyon | Acceptance Review: Diablo Canyon Request to Utilize Adopt Fuel for Improved Fuel Performance (EPID: L-2025-LLA-0191) | Acceptance Review | ||
| ML26013A028 | 15 January 2026 | Hatch Vogtle Farley | SNC Fleet - Extension to Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request for Changes to Emergency Action Level Schemes to Adopt NEI 99-01, Revision 7 (EPID L-2025-LLA-0157) | Acceptance Review | ||
| ML26015A107 | 14 January 2026 | Vogtle | Units 3 and 4 - Acceptance Review - Vogtle 3 and 4 - LAR to Revise Technical Specification 3.4.10, Reactor Coolant System (RCS) Specific Activity (EPID L-2025-LLA-0198) | Acceptance Review | ||
| ML26014A188 | 13 January 2026 | Watts Bar | Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - LAR to Revise TS 3.7.3 (EPID L-2025-LLA-0193) | Acceptance Review | ||
| ML26013A086 | 12 January 2026 | Wolf Creek | Wolf Creek Generating Station - Acceptance Review: Wolf Creek 10 CFR 50.55a Request to Use a Provision of a Later Edition of ASME OM Code for Motor Operated Valve Testing (EPID: L-2025-LLR-0093) | Acceptance Review | ||
| ML26009A129 | 9 January 2026 | Vogtle | Fyi - Acceptance Review - Vogtle 3 and 4 - LAR to Change TS 3.3.9 and TS 3.3.1 9 (Epdi L-2025-LLA-0197) | Acceptance Review | ||
| ML26008A286 | 8 January 2026 | 07200020 | Acceptance of Department of Energy, Idaho Cleanup Project License Amendment Request to Update the Licensee Designation of Authority Title for the Three Mile Island Unit 2 Independent Spent Fuel Storage Installation | Acceptance Review | ||
| ML26008A042 | 7 January 2026 | Byron Braidwood | Constellation Energy Generation, LLC - Braidwood and Byron Request - Acceptance of License Amendment Request to Revise the Quadrant Power Tilt Ratio Technical Specification (EPID L-2025-LLA-0194) | Acceptance Review | ||
| ML26005A215 | 5 January 2026 | Susquehanna | Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Revise TS to Adopt TSTF-599 (EPID L-2025-LLA-0186) | Acceptance Review | ||
| ML25356A365 | 22 December 2025 | Hatch | NRR E-mail Capture - Fyi - Acceptance Review - Hatch 1 and 2 - LAR to Adopt TSTF-576 Revise Safety/Relief Valve Requirements (L-2025-LLA-0190) | Acceptance Review | ||
| ML25356A528 | 19 December 2025 | Millstone Surry North Anna | Acceptance Review for Fleet Report DOM-NAF-4 and VC Summer LAR to Implement Report (L-2025-LLT-0000 & L-2025-LLA-0178) | Acceptance Review | ||
| ML25352A260 | 18 December 2025 | Calvert Cliffs Dresden Peach Bottom Nine Mile Point Byron Braidwood Limerick Ginna Clinton Quad Cities FitzPatrick LaSalle | Acceptance Review: Exemption Request- NDT Excess Earnings for Non-Radiological Decommissioning (10 CFR 50.82(a)(8)) (EPID L-2025-LLE-0028) | Acceptance Review | ||
| ML25329A300 | 16 December 2025 | Hi STAR 330 Acceptance Review Audit Meeting Summary | Acceptance Review | |||
| ML25350C085 | 16 December 2025 | Braidwood | Constellation Energy Generation, LLC - Braidwood - Acceptance of License Amendment Request to Extend Completion Date of License Renewal Commitment (EPID L-2025-LLA-0170) | Acceptance Review | ||
| ML25351A151 | 16 December 2025 | Saint Lucie | Acceptance Review for FPL LAR - St. Lucie Unit 1 - Fuel Methodology Changes in Support of Transition to 24-Month Fuel Cycles (L-2024-LLA-0152) | Acceptance Review | ||
| ML25353A570 | 15 December 2025 | Limerick | NRC Acceptance Review for Limerick LLRT LAR (L-2025-LLA-0167) and Updated Schedule for ILRT LAR (L-2025-LLA-0126) | Acceptance Review | ||
| ML25352A174 | 15 December 2025 | Duane Arnold | DAEC - Acceptance Review Regarding Operating Licensing and Technical Specification LAR to Support Resumption of Power Operations (EPID L-2025-LLA-0180) | Acceptance Review | ||
| ML25352A127 | 15 December 2025 | Salem | NRC Acceptance Review Results for Salem LAR S25-01 (EPID L-2025-LLA-0154) | Acceptance Review | ||
| ML25350C091 | 15 December 2025 | Limerick | NRC Acceptance Review of Limerick Proposed Alternative GVRR-12 (EPID L-2025-LLR-0090) | Acceptance Review | ||
| ML25350B053 | 15 December 2025 | Salem | Nuclear Generating Station, Units 1 and 2 - NRC Acceptance Review Results for Salem LAR S22-06 (L-2025-LLA-0169) | Acceptance Review | ||
| ML25350A108 | 15 December 2025 | Salem | NRC Revised Acceptance Review Schedule for Salem LAR S25-02 (EPID L-2025-LLA-0112) | Acceptance Review | ||
| ML25346A099 | 12 December 2025 | Davis Besse | Nuclear Power Station, Unit 1 - Acceptance Review for Davis-Besse Use of Neutron Instrumentation Amendment | Acceptance Review | ||
| ML25345A391 | 9 December 2025 | Crane | Crane Clean Energy Center - Acceptance of License Amendment Request to Revise the Emergency Plan to Support Resumption of Power Operations (EPID L-2025-LLA-0162) | Acceptance Review | ||
| ML25343A194 | 9 December 2025 | Catawba | Catawba, Units 1 and 2 - Acceptance of Two Requested Licensing Actions Amendments to Adopt TSTF-505/TSTF-591 and 50.69 (Epids L-2025-LLA-0155 and L-2025-LLA-0156) | Acceptance Review | ||
| ML25342A043 | 9 December 2025 | Vallecitos Nuclear Center 07000754 Vallecitos | Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Letter | Acceptance Review | ||
| ML25344A023 | 8 December 2025 | Oconee | Units 1, 2 and 3 - Acceptance of Requested Licensing Action Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits (EPID L-2025-LLA-0164) | Acceptance Review | ||
| ML25342A297 | 8 December 2025 | University of Missouri-Columbia | NRR E-mail Capture - University of Missouri - Columbia Research Reactor (MURR) License Amendment Request Acceptance Review | Acceptance Review | ||
| ML25339A013 | 5 December 2025 | Summer | Nuclear Station, Unit No. 1 - Acceptance Review for VC Summer SG Water Level License Amendment Request (EPID L-2025-LLA-0168) | Acceptance Review | ||
| ML25342A019 | 5 December 2025 | Byron Braidwood | Constellation Energy Generation, LLC - Braidwood and Byron Request - Acceptance of License Amendment Request to Revise Limiting Conditions Supporting Transitioning to Framatome Gaia Fuel (EPID No. L-2025-LLA-0172) | Acceptance Review | ||
| ML25338A209 | 4 December 2025 | Farley | Nuclear Plant, Units 1 and 2 - Acceptance Review for Diesel Generator Frequency & Voltage LAR (EPID L-2025-LLA-0153) | Acceptance Review | ||
| ML25338A255 | 2 December 2025 | Mcguire McGuire | Updated Acceptance Review Hours and Schedule Ref: McGuire Relief Request Acceptance Review Results; McGuire Unit 2 ISI Class 1 and 2 Components Impracticality | Acceptance Review | ||
| ML25337A014 | 2 December 2025 | Columbia | Acceptance Review - Columbia Proposed Change to Technical Specification to Correct Error Introduced During Wordperfect Conversion (EPID L-2025-LLA-0171) | Acceptance Review | ||
| ML25337A113 | 2 December 2025 | Crane | Christopher M. Crane Clean Energy Center - Acceptance of License Amendment Request to Revise the Security Plan to Support Resumption of Power Operations | Acceptance Review | ||
| ML25329A083 | 25 November 2025 | 05000128 | NRR E-mail Capture - Texas Engineering Experiment Stationtexas A&M University System - License Amendment Request for Change Technical Specifications Section 6.2 and 6.2.1 Acceptance Review | Acceptance Review | ||
| [list] | ||||||