Acceptance Review

From kanterella
Jump to navigation Jump to search

The acceptance review is an early stage (see Property:Project stage) when the NRC takes the initial request and states that enough information exists to perform the full review.

List

 Issue dateSiteTitleProject stageProjectEstimated NRC review hours
ML26065A0105 March 202605000026
05000025
March 5, 2026 Email - Fyi - Acceptance Review - Vogtle 3 and 4 - LAR to Adopt 10 CFR 50.69Acceptance ReviewEPID:L-2026-LLA-0032
ML26063A2883 March 2026Byron
Braidwood
Acceptance Review for Braidwood/Byron Relief Request Regarding SG Atmospheric Relief ValvesAcceptance ReviewEPID:L-2026-LLR-0008
ML26063A2772 March 2026Oconee
Mcguire
Catawba
Harris
Robinson
McGuire
Duke Fleet - Acceptance of Requested Licensing Action Amendment to Adopt TSTF-585 Revise LCO 3.0.3 to Require Managing Risk.Acceptance ReviewEPID:L-2026-LLA-0031
ML26055A13326 February 2026Vallecitos Nuclear Center
07000754
Vallecitos
Quality Assurance Program Manual Acceptance LetterAcceptance ReviewEPID:L-2026-LLN-0001
ML26055A16626 February 2026Crystal RiverAcceptance of Lic. Termination Plan and Addition of Lic. ConditionAcceptance ReviewEPID:L-2025-LLA-0173
ML26057A34426 February 2026Grand Gulf
Arkansas Nuclear
River Bend
Waterford
NRC Acceptance for Review: Entergy Fleet Request for Exemption from 50.55a(g)(4)iiAcceptance ReviewEPID:L-2026-LLE-0009
ML26061A06925 February 2026VogtleAcceptance Review for Vogtle 3 and 4 License Amendment Request (LAR) to Revise Technical Specifications (Tss) to Include Risk Informed Completion Times (Ricts) (L-2026-LLA-0016)Acceptance ReviewEPID:L-2026-LLA-0016
ML26061A10425 February 2026Hatch
Vogtle
Farley
NRC Acceptance Review Email Dated February 25, 2026 - SNC Fleet EAL LARAcceptance ReviewEPID:L-2025-LLA-0157
ML26055A04024 February 2026SHINE Medical TechnologiesAcceptance Review - Email, Shine Technologies Application for Order Approving Transfers of Construction Permit CPMIF-001 and Conforming Administrative Amendments. (EPID-2026-LLM-0000)Acceptance ReviewEPID:2026
ML26055A04424 February 2026North AnnaAcceptance Review for North Anna LAR to Remove High Negative Flux Rate Trip (L-2026-LLA-0021)Acceptance ReviewEPID:L-2026-LLA-0021
ML26050A48019 February 2026VogtleVogle Electric Generating Plant, Units 3 and 4 - Acceptance Review Email Dated February 19, 2026 - Vogtle 3 and 4 - Squib Valve AlternativeAcceptance Review
ML26062A12418 February 2026HI-STORM 100Email Acceptance of Holtec Amendment Request to CoC No. 1040 Umax Amendment 6Acceptance ReviewCAC:001028
ML26062A12318 February 2026HI-STORM 100Acceptance of Holtec Amendment Request to Certificate of Compliance No.1040 for the Model No. HI-STORM Umax, Amendment No. 6 - Docket No. 72-1040; Cost Activity Code/Enterprise Project Identification Number 001028/L-2026-LLA-0007Acceptance ReviewCAC:001028
ML26049A04917 February 2026MillstoneAcceptance of Requested Licensing Action Re License Amendment Request for a One - Time Extension of the Residual Heat Removal System Allowed Outage TimeAcceptance ReviewEPID:L-2026-LLA-0012
ML26049A15717 February 2026SequoyahAcceptance Review Results for Sequoyah Nuclear Plant License Amendment Request Related to TS 5.5.3,Radiological Effluent Controls Program, for Use of Potassium HydroxideAcceptance ReviewEPID:L-2026-LLA-0006
ML26048A70415 February 202605000614Project Long Mott Docs - Analytical Methods TR Acceptance Review MeetingAcceptance Review
ML26041A22313 February 202605000617
05000616
99902049
Acceptance Review Results for a Limited Work Authorization Application for SMR-300 Pioneer Units 1 and 2Acceptance Review
ML26037A22112 February 202607000938Massachusetts Institute of Technology 2025 Request for Financial Self-Guarantee Acceptance LetterAcceptance ReviewEPID:L-2025-NFA-0013
ML26043A42312 February 2026Palo VerdeAcceptance of LAR to the TS for PVNGS to Relocate Unit Staff Qualifications from TS 5.3.1 to the Quality Assurance Program DocumentAcceptance ReviewEPID:L-2025-LLA-0179
ML26041A11112 February 202607000113Cover Letter - Acceptance for Review of Pennsylvania State Universitys Self-GuaranteeAcceptance ReviewEPID:L-2025-NFO-0002
ML26043A01111 February 2026LimerickNRC Acceptance Review Results for Limerick LAR for Drywell TS SRAcceptance ReviewEPID:L-2026-LLA-0005
ML26043A06111 February 2026VogtleFyi - Acceptance Review - Vogtle 3 LAR to Revise the Implementation Schedule for Amendment 203 (EPID L-2026-0026)Acceptance Review
ML26043A41411 February 2026Vogtle
Farley
Acceptance Review - Farley 1 and 2 and Vogtle 1 and 2 - Alternative Request to Use a Later Edition of the CodeAcceptance ReviewEPID:L-2026-LLR-0007
ML26042A32310 February 2026Hope CreekAcceptance of Alternative Request VR-01 Concerning Excess Flow Check ValvesAcceptance ReviewEPID:L-2026-LLR-0005
ML26042A33410 February 2026Beaver Valley.: Acceptance Review to Adopt TSTF 589 and TSTF-599Acceptance ReviewEPID:L-2026-LLA-0008
ML26042A31910 February 2026Watts BarAcceptance Review Results for Watts Bar Nuclear Plant Exemption Request Related to 10 CFR 50.71(e)(4)Acceptance ReviewEPID:L-2026-LLE-0003
ML26041A3509 February 2026Browns Ferry
Watts Bar
Sequoyah
Clinch River
Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, Watts Bar Nuclear Plant, and Clinch River ESP Exemption Request Related to 10 CFR 50.54(a)(3)Acceptance ReviewEPID:L-2026-LLE-0000
ML26034A4009 February 2026Hope CreekSupplemental Information Needed for Acceptance of Alternate Request Containment Isolation ValvesAcceptance ReviewEPID:L-2026-LLR-0006
ML26042A2579 February 2026Hope CreekAcceptance of Alternative Request PR-02 Concerning Pump Flow Instrument AccuracyAcceptance ReviewEPID:L-2026-LLR-0003
ML26040A2529 February 2026Hope Creek– Acceptance of Alternative Request PR-03 Concerning Code Case OMN-32Acceptance ReviewEPID:L-2026-LLR-0004
ML26041A2809 February 2026LaSalleAcceptance of Requested Licensing Action Amendment to Revise TS3.3.7.1Acceptance ReviewEPID:L-2026-LLA-0015
ML26040A2605 February 2026Diablo CanyonAcceptance of Requested Licensing Action Amendment to Adopt TSTF-585 Revise LCO 3.0.3 to Require Managing RiskAcceptance ReviewEPID:L-2026-LLA-0011
ML26036A0254 February 2026Hope CreekAcceptance of License Amendment Request Adoptation of Risk-Informed Completion Times ProgramAcceptance ReviewEPID:L-2026-LLA-0003
ML26033A3292 February 2026Diablo CanyonAcceptance Review_ Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-596, _Expand the Applicability of the Surveillance Frequency ControlAcceptance ReviewEPID:L-2025-LLA-0200
ML26034C0342 February 2026Diablo CanyonAcceptance Review: Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application RulesAcceptance ReviewEPID:L-2025-LLA-0199
ML26030A14530 January 2026Diablo CanyonAcceptance Review: Diablo Canyon Request to Update Spent Fuel Pool and New Fuel Storage Vault Criticality Safety AnalysisAcceptance ReviewEPID:L-2025-LLA-0201
ML26030A04330 January 2026Duane ArnoldAcceptance of License Amendment Request to Revise the Physical Security Plan to Support Resumption of Power OperationsAcceptance ReviewEPID:L-2025-LLA-0205
ML26030A15628 January 2026Millstone– Acceptance of Requested Licensing Action Re Adoption of TSTF-601 Shield Building Completion Time After RefuelingAcceptance ReviewEPID:L-2025-LLA-0204
ML26030A15928 January 2026Millstone– Acceptance of Requested Licensing Action Re Adoption of TSTF-601 Shield Building Completion Time After RefuelingAcceptance ReviewEPID:L-2025-LLA-0202
ML26029A07827 January 2026Mcguire
Catawba
McGuire
Duke Fleet Acceptance of Requested Licensing Action: McGuire Catawba LAR for Rod Ejection Analysis Methodology to RG 1.236, June 2020Acceptance Review
ML26028A17827 January 2026Cook– Acceptance of Relief Requests in Support of the Sixth Inservice Testing IntervalAcceptance ReviewEPID:L-2026-LLR-0000
ML26027A37127 January 2026Nine Mile PointAcceptance Review Determination GVRR-8 Alternative Related to Excess Flow Check Valve Test FrequencyAcceptance ReviewEPID:L-2025-LLR-0097
ML26028A17027 January 2026Fort CalhounAcceptance of Requested Licensing Action Re Final Status Survey Report for Phase 2 of Final Status Survey Plan - L-2025-LLN-0012Acceptance ReviewEPID:L-2025-LLN-0012
ML26027A28126 January 2026Comanche Peak(CPNPP) Acceptance of Requested Licensing Action to Revise Technical Specifications to Allow the Use of Optimized ZIRLO Fuel Rod Cladding MaterialAcceptance Review
ML26027A24426 January 2026Palo VerdeAcceptance of Requested Licensing Action Relief Request 75 - Proposed Alternative for Implementation of Extended Reactor Vessel Inservice Inspection IntervalAcceptance ReviewEPID:L-2025-LLR-0087
ML26023A12223 January 2026PerryAcceptance of License Amendment Request to Adopt TSTF-576, Revision 3Acceptance ReviewEPID:L-2026-LLA-0004
ML26026A15523 January 2026Dresden
Peach Bottom
Clinton
Quad Cities
LaSalle
Constellation Energy Generation, LLC - Fleet Request - Acceptance Review - Eliminate Automatic MSIV Closure on High TemperatureAcceptance ReviewEPID:L-2026-LLA-0001
ML26026A20623 January 2026Comanche PeakAcceptance Review of Vistras Application to Adopt TSTF-547, Clarification of Rod Position RequirementsAcceptance Review
ML26023A01922 January 2026Saint LucieAcceptance Review for FPL LAR: St. Lucie Unit 1 Licensing Basis Changes for 24-Month Fuel CyclesAcceptance ReviewEPID:L-2025-LLA-0188
ML25258A02522 January 202605200009Federal Register Notice - Acceptance of Entergy Operations, Inc. Renewal Application for Grand Gulf Site Early Site Permit (ESP-002)Acceptance Review
[list]